Thu Oct 6 14:43:47 2016, JL Tain, A Tarifeno, A Tolosa, J Agramunt, N Brewer, S Go, ..., Electronics
|
We mount back all preamplifiers
Initially we used all the PA coming from US, the repaired and the new ones.
There was an issue with the new ones (strong noise and cross talk)
|
Fri Oct 14 04:42:40 2016, JL Tain et al, Electronics 
|
Change of main power line for MPOD and CLOVER preamp
|
Wed Jul 20 16:55:48 2016, K.Gabor, K. Matsui, A. Tarifeņo, Electronic
|
Drying of preamplifiers
PA8, PA9 and PA10 are removed and brought to a dryer box
|
Wed Nov 2 02:26:22 2016, Roger Caballero, Efficiency callibration calculator (Excel file)
|
Attached the updated excel file. In the first sheet there is the calculator to calculate the efficiency from an given energy.
The Jackel function used is:
|
Tue Nov 1 13:00:55 2016, Roger Caballero, Eff callibration parameters for G7-Clover   
|
Efficiency calibration for the G7 clover (data acquired in July).
The attached plots show the parameters for the Jackel function (E[i]=Energy) using the points of a 152Eu source.
|
Wed Nov 2 01:19:46 2016, Roger Caballero, Eff callibration parameters for D4-Clover   
|
Efficiency calibration for the D4 clover (data acquired in October).
The attached plots show the parameters for the Jackel function (E[i]=Energy) using the points of 152Eu, 60Co and 137Cs sources.
|
Sun Apr 2 16:18:57 2017, All, END OF PARASITIC RUN
|
| |
Fri Jul 22 12:50:29 2016, J.L. Tain, END
|
20/JUL/2016 20:00
End of the test measurements |
Sun Oct 16 13:30:43 2016, All, END
|
... and sashimi (see photo)
The detectors (BRIKEN tubes, CLOVER, VETO detectors, AIDA)
|
Thu Mar 23 09:01:33 2017, JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, ELOG Start Preparation
|
| We started the preparation of 2017 campaign |
Sat Jul 9 21:26:25 2016, J.L. Tain, EDACQ
|
| Electronics and DACQ for July 2016 assembly: hardware and connections |
Tue Nov 8 06:39:25 2016, Tain. Iris, Drawing of present setup
|
Attached is the present setup including all walls, auxiliary detectors, degraders etc. and the Takechi setup.
|
Wed Nov 9 01:04:35 2016, Iris, Drawing of present setup
|
This is the setup which was used for the Ni runs (from Nov. 8th evening on).
Note (Nov. 10th): Alejandro built a U-shaped Pb wall, the degrader inside AIDA was removed and possibly a Al plate was installed. This has to be checked |
Sat Oct 21 04:18:17 2017, NB, Draft of Instructions for HV
|
Setup:
2 MPOD + cards with 8 channels each one where the 10 BRIKEN PA are connected.
1 MPOD + card with 8 possible inputs |
Mon Nov 7 09:05:09 2016, Iris, Draft for Run sheet 
|
| Attached is the draft for the paper run sheet (version 2). If something is missing, please let me know. |
Mon Nov 28 16:18:07 2016, AE, DAQ synchronization
|
| Please see: https://elog.ph.ed.ac.uk/AIDA/493 |
Wed Jul 20 17:21:59 2016, J. Agramunt, A. Tolosa, DACQ
|
DACQ configuration parameters
The last configuration file used was: 160718Conf_BrikenFull_cal5.xlsx
|
Sat Oct 8 01:18:51 2016, JL Tain et al, DACQ
|
| We increased the pretrigger delay for ADC5 from 350 to 400 |
Sun Nov 20 12:28:27 2016, Jorge, Alvaro, Jose, DACQ
|
| Updated run protocol |
Sun Nov 20 13:02:06 2016, Jorge, Alavaro, Jose, DACQ
|
| Gasific-7.0 Short Manual (Preliminary) |