AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 10 of 21  ELOG logo
Entry  Fri Oct 14 04:42:40 2016, JL Tain et al, Electronics D4All-CsCo-zoom-newlineCL.pdfBRIKEN-newlineCL.pdf
Change of main power line for MPOD and CLOVER preamp

Entry  Wed Jul 20 16:55:48 2016, K.Gabor, K. Matsui, A. Tarifeņo, Electronic 
Drying of preamplifiers

PA8, PA9 and PA10 are removed and brought to a dryer box
    Reply  Wed Nov 2 02:26:22 2016, Roger Caballero, Efficiency callibration calculator (Excel file) cloversEff.xls
Attached the updated excel file. In the first sheet there is the calculator to calculate the efficiency from an given energy.

The Jackel function used is:
    Reply  Tue Nov 1 13:00:55 2016, Roger Caballero, Eff callibration parameters for G7-Clover G7-Blue.pdfG7-Green.pdfG7-Red.pdfG7-Black.pdf
Efficiency calibration for the G7 clover (data acquired in July).
The attached plots show the parameters for the Jackel function (E[i]=Energy) using the points of a 152Eu source.
    Reply  Wed Nov 2 01:19:46 2016, Roger Caballero, Eff callibration parameters for D4-Clover D4-Black.pdfD4-Red.pdfD4-Green.pdfD4-Blue.pdf
Efficiency calibration for the D4 clover (data acquired in October).
The attached plots show the parameters for the Jackel function (E[i]=Energy) using the points of 152Eu, 60Co and 137Cs sources.
Entry  Sun Apr 2 16:18:57 2017, All, END OF PARASITIC RUN 
 
Entry  Fri Jul 22 12:50:29 2016, J.L. Tain, END 
20/JUL/2016 20:00 
End of the test measurements
Entry  Sun Oct 16 13:30:43 2016, All, END Sashimi.jpg
... and sashimi (see photo)

The detectors (BRIKEN tubes, CLOVER, VETO detectors, AIDA) 
Entry  Thu Mar 23 09:01:33 2017, JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, ELOG Start Preparation 
We started the preparation of 2017 campaign
Entry  Sat Jul 9 21:26:25 2016, J.L. Tain, EDACQ EDACQ-July2016.pdf
Electronics and DACQ for July 2016 assembly: hardware and connections
    Reply  Tue Nov 8 06:39:25 2016, Tain. Iris, Drawing of present setup Full_BRIKEN_Setup-includingTakechi.pdf


Attached is the present setup including all walls, auxiliary detectors, degraders etc. and the Takechi setup.
    Reply  Wed Nov 9 01:04:35 2016, Iris, Drawing of present setup Setup-161109-Takechi.pdf
This is the setup which was used for the Ni runs (from Nov. 8th evening on).

Note (Nov. 10th): Alejandro built a U-shaped Pb wall, the degrader inside AIDA was removed and possibly a Al plate was installed. This has to be checked
Entry  Sat Oct 21 04:18:17 2017, NB, Draft of Instructions for HV 
Setup:

2 MPOD + cards with 8 channels each one where the 10 BRIKEN PA are connected.

1 MPOD + card with 8 possible inputs
Entry  Mon Nov 7 09:05:09 2016, Iris, Draft for Run sheet Run_sheet-Nov16-v2.pdfRun_sheet-Nov16-v2.docx
Attached is the draft for the paper run sheet (version 2). If something is missing, please let me know.
Entry  Mon Nov 28 16:18:07 2016, AE, DAQ synchronization  
Please see: https://elog.ph.ed.ac.uk/AIDA/493
Entry  Wed Jul 20 17:21:59 2016, J. Agramunt, A. Tolosa, DACQ 160718Conf_BrikenFull_cal5.xlsx
DACQ configuration parameters

The last configuration file used was: 160718Conf_BrikenFull_cal5.xlsx
Entry  Sat Oct 8 01:18:51 2016, JL Tain et al, DACQ 
We increased the pretrigger delay for ADC5 from 350 to 400
Entry  Sun Nov 20 12:28:27 2016, Jorge, Alvaro, Jose, DACQ GasificShort.pdf
Updated run protocol
Entry  Sun Nov 20 13:02:06 2016, Jorge, Alavaro, Jose, DACQ Gasific70Manual.pdf
Gasific-7.0 Short Manual (Preliminary)
Entry  Fri Nov 25 21:48:49 2016, AT, DACQ 
19:00  Test calibration 
ELOG V3.1.3-7933898