Fri Oct 14 04:42:40 2016, JL Tain et al, Electronics 
|
Change of main power line for MPOD and CLOVER preamp
|
Wed Jul 20 16:55:48 2016, K.Gabor, K. Matsui, A. Tarifeņo, Electronic
|
Drying of preamplifiers
PA8, PA9 and PA10 are removed and brought to a dryer box
|
Wed Nov 2 02:26:22 2016, Roger Caballero, Efficiency callibration calculator (Excel file)
|
Attached the updated excel file. In the first sheet there is the calculator to calculate the efficiency from an given energy.
The Jackel function used is:
|
Tue Nov 1 13:00:55 2016, Roger Caballero, Eff callibration parameters for G7-Clover   
|
Efficiency calibration for the G7 clover (data acquired in July).
The attached plots show the parameters for the Jackel function (E[i]=Energy) using the points of a 152Eu source.
|
Wed Nov 2 01:19:46 2016, Roger Caballero, Eff callibration parameters for D4-Clover   
|
Efficiency calibration for the D4 clover (data acquired in October).
The attached plots show the parameters for the Jackel function (E[i]=Energy) using the points of 152Eu, 60Co and 137Cs sources.
|
Sun Apr 2 16:18:57 2017, All, END OF PARASITIC RUN
|
| |
Fri Jul 22 12:50:29 2016, J.L. Tain, END
|
20/JUL/2016 20:00
End of the test measurements |
Sun Oct 16 13:30:43 2016, All, END
|
... and sashimi (see photo)
The detectors (BRIKEN tubes, CLOVER, VETO detectors, AIDA)
|
Thu Mar 23 09:01:33 2017, JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, ELOG Start Preparation
|
| We started the preparation of 2017 campaign |
Sat Jul 9 21:26:25 2016, J.L. Tain, EDACQ
|
| Electronics and DACQ for July 2016 assembly: hardware and connections |
Tue Nov 8 06:39:25 2016, Tain. Iris, Drawing of present setup
|
Attached is the present setup including all walls, auxiliary detectors, degraders etc. and the Takechi setup.
|
Wed Nov 9 01:04:35 2016, Iris, Drawing of present setup
|
This is the setup which was used for the Ni runs (from Nov. 8th evening on).
Note (Nov. 10th): Alejandro built a U-shaped Pb wall, the degrader inside AIDA was removed and possibly a Al plate was installed. This has to be checked |
Sat Oct 21 04:18:17 2017, NB, Draft of Instructions for HV
|
Setup:
2 MPOD + cards with 8 channels each one where the 10 BRIKEN PA are connected.
1 MPOD + card with 8 possible inputs |
Mon Nov 7 09:05:09 2016, Iris, Draft for Run sheet 
|
| Attached is the draft for the paper run sheet (version 2). If something is missing, please let me know. |
Mon Nov 28 16:18:07 2016, AE, DAQ synchronization
|
| Please see: https://elog.ph.ed.ac.uk/AIDA/493 |
Wed Jul 20 17:21:59 2016, J. Agramunt, A. Tolosa, DACQ
|
DACQ configuration parameters
The last configuration file used was: 160718Conf_BrikenFull_cal5.xlsx
|
Sat Oct 8 01:18:51 2016, JL Tain et al, DACQ
|
| We increased the pretrigger delay for ADC5 from 350 to 400 |
Sun Nov 20 12:28:27 2016, Jorge, Alvaro, Jose, DACQ
|
| Updated run protocol |
Sun Nov 20 13:02:06 2016, Jorge, Alavaro, Jose, DACQ
|
| Gasific-7.0 Short Manual (Preliminary) |
Fri Nov 25 21:48:49 2016, AT, DACQ
|
| 19:00 Test calibration |