AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 5 of 21  ELOG logo
ID Date Author Subjectdown Text Attachments
  133   Mon Nov 7 14:17:23 2016 BRIKEN collaborationPicture of shift schedule   IMG_20161107_183105.jpg 
  43   Tue Jul 19 04:34:57 2016 JL Tain A Tolosa R. Caballero A. Tarifeņo J. Agramunt Photos of the electronicsRacks, crates, rear part of the preamps and
matrix with all tubes.
 9x 
  44   Tue Jul 19 11:54:03 2016 JL Tain A Tolosa R. Caballero A. Tarifeņo J. Agramunt Photos of the AIDA insertion hole with the 3He tubesRIKEN tubes on the AIDA side with the SHV
right angle connector will protrude
by ~95mm in the HYBRID configuration (with
 DSC_2520.JPGDSC_2517.JPGDSC_2515.JPG 
  13   Sun May 3 10:07:25 2015 J.L. Tain, J. Agramunt, G. KissPhotos of new PE shieldingPhotos of the general arrangement and details
of the new PE blocks
 20150502_195020.jpg20150502_194340.jpg20150502_192253.jpg 
  122   Mon Nov 7 02:39:55 2016 AlePhoto of the white board with the details on the cards and preamps at B1FPhoto of the white board with the details
on the cards and preamps at B1F
 New_Doc_160_2.pdf 
  192   Fri Dec 9 05:25:26 2016 PVPhoto and schematic drawing of the Pb shielding in front of BRIKEN during Fallon experimentThis Pb shielding structure is right behind
the variable degrader
 Schematic_PbShielding_FallonRun.pdfIMG_1414.JPG 
  419   Thu Nov 22 07:01:36 2018 ATPID high mass seting (165Pm) - RIBF148PID plot for the high mass setting (165Pm),
run 2018, rare earth peak experiment.
Partial statistics (~30h) from identification
 F7pid_RIBF148_165PmSetting_labels.png 
  121   Sun Nov 6 23:35:42 2016 Tain et al.Overnight measurement: Ca isotopesFirst 50,49,48Ca beam and then 47,46,45Ca
beam
C-6mm IN and OUT
 161107_0833_Overnight_Rates.pdf161107_0833_Overnight_F11.pdf161107_0833_Overnight_CorrBRF11R.pdf 
  117   Sun Nov 6 03:12:55 2016 Alvaro,JorgeOvernight measurementMeasurement during beam production
and measurement with F7 CH2 out, 
F11 C-tar in/out, F7 CH2 in C-target out/in
  
  173   Sat Nov 26 09:31:05 2016 Gabor Kiss, Ariel Tarifeno, Alvaro TolosaOutput signals from G7RedPreamplifier of crystal G7Red was replaced.

Output signals from G7Red are weird.
 G7red_01.svg02.svg03.svg06.svg 
  188   Mon Nov 28 10:48:21 2016 JLTOnline analysisComparison of current spectra with spectra
from Takechi's run
 analysis-271116.pdf 
  9   Mon Apr 27 10:18:21 2015 K.Gabor S.Nishimura J.AgramuntORNL 3He tube at RIKEN   photo-3.JPG 
  352   Thu Oct 26 09:01:53 2017 BCRNumber of Counts vs Expected Efficiency for Proposals 

Here is a doc with an estimate
of the statistical uncertainty P1n and P2n
 ExpectedBRIKEN_Precision.pdf 
  154   Tue Nov 22 09:26:04 2016 A. Tarifeno-SaldiviaNoise checkRun for checking the noise just after turn
on the crates, without high voltages on the
PREAMPS.
 161122_1820_000_BRIKEN.svg 
  67   Fri Oct 7 08:35:15 2016 JL Tain et alNoiseLow amplitude noise component.

The figure shows the composition of the low
 noiseDifferentTubes2.pdf 
  68   Fri Oct 7 10:42:52 2016 JL Tain et alNoiseWe investigate the effect on the noise in
ORNL tubes of using a differential PA.
 ORNL-DiffPreamp.pdf 
  71   Sun Oct 9 04:20:47 2016 JL Tain et alNoiseWe check for the appearance of spurious signals
in the preamplifiers.
 noHV.pdf161008_0642_noHV.pdf 
  73   Sun Oct 9 18:19:01 2016 JL Tain et alNoiseOptimization of ADC thresholds

In order to try to reduce the grass-like
 161007_1045_bck_lin.pdf161010_0712_bck_newthr.pdf 
  78   Wed Oct 12 05:06:57 2016 JL Tain et alNoiseGamma source close to ORNL2 tube

In order to investigate the origin of the
 He136-nosource.pdfHe136-137Cs.pdf 
  156   Tue Nov 22 10:22:07 2016 PV, LiuNo current observed when turning on the HV for the D4 Clover19:00
We've turned on the High Voltage for the
D4 Clover up to ~ 1.5 kV. 
  
ELOG V3.1.4-unknown