ID |
Date |
Author |
Subject |
Text |
 |
133
|
Mon Nov 7 14:17:23 2016 |
BRIKEN collaboration | Picture of shift schedule | |
|
43
|
Tue Jul 19 04:34:57 2016 |
JL Tain A Tolosa R. Caballero A. Tarifeņo J. Agramunt | Photos of the electronics | Racks, crates, rear part of the preamps and
matrix with all tubes. |
9x |
44
|
Tue Jul 19 11:54:03 2016 |
JL Tain A Tolosa R. Caballero A. Tarifeņo J. Agramunt | Photos of the AIDA insertion hole with the 3He tubes | RIKEN tubes on the AIDA side with the SHV
right angle connector will protrude
by ~95mm in the HYBRID configuration (with |
  |
13
|
Sun May 3 10:07:25 2015 |
J.L. Tain, J. Agramunt, G. Kiss | Photos of new PE shielding | Photos of the general arrangement and details
of the new PE blocks |
  |
122
|
Mon Nov 7 02:39:55 2016 |
Ale | Photo of the white board with the details on the cards and preamps at B1F | Photo of the white board with the details
on the cards and preamps at B1F |
|
192
|
Fri Dec 9 05:25:26 2016 |
PV | Photo and schematic drawing of the Pb shielding in front of BRIKEN during Fallon experiment | This Pb shielding structure is right behind
the variable degrader |
 |
419
|
Thu Nov 22 07:01:36 2018 |
AT | PID high mass seting (165Pm) - RIBF148 | PID plot for the high mass setting (165Pm),
run 2018, rare earth peak experiment.
Partial statistics (~30h) from identification |
|
121
|
Sun Nov 6 23:35:42 2016 |
Tain et al. | Overnight measurement: Ca isotopes | First 50,49,48Ca beam and then 47,46,45Ca
beam
C-6mm IN and OUT
|
  |
117
|
Sun Nov 6 03:12:55 2016 |
Alvaro,Jorge | Overnight measurement | Measurement during beam production
and measurement with F7 CH2 out,
F11 C-tar in/out, F7 CH2 in C-target out/in
|
|
173
|
Sat Nov 26 09:31:05 2016 |
Gabor Kiss, Ariel Tarifeno, Alvaro Tolosa | Output signals from G7Red | Preamplifier of crystal G7Red was replaced.
Output signals from G7Red are weird.
|
   |
188
|
Mon Nov 28 10:48:21 2016 |
JLT | Online analysis | Comparison of current spectra with spectra
from Takechi's run
|
|
9
|
Mon Apr 27 10:18:21 2015 |
K.Gabor S.Nishimura J.Agramunt | ORNL 3He tube at RIKEN | |
|
352
|
Thu Oct 26 09:01:53 2017 |
BCR | Number of Counts vs Expected Efficiency for Proposals |
Here is a doc with an estimate
of the statistical uncertainty P1n and P2n |
|
154
|
Tue Nov 22 09:26:04 2016 |
A. Tarifeno-Saldivia | Noise check | Run for checking the noise just after turn
on the crates, without high voltages on the
PREAMPS.
|
|
67
|
Fri Oct 7 08:35:15 2016 |
JL Tain et al | Noise | Low amplitude noise component.
The figure shows the composition of the low |
|
68
|
Fri Oct 7 10:42:52 2016 |
JL Tain et al | Noise | We investigate the effect on the noise in
ORNL tubes of using a differential PA.
|
|
71
|
Sun Oct 9 04:20:47 2016 |
JL Tain et al | Noise | We check for the appearance of spurious signals
in the preamplifiers.
|
 |
73
|
Sun Oct 9 18:19:01 2016 |
JL Tain et al | Noise | Optimization of ADC thresholds
In order to try to reduce the grass-like |
 |
78
|
Wed Oct 12 05:06:57 2016 |
JL Tain et al | Noise | Gamma source close to ORNL2 tube
In order to investigate the origin of the |
 |
156
|
Tue Nov 22 10:22:07 2016 |
PV, Liu | No current observed when turning on the HV for the D4 Clover | 19:00
We've turned on the High Voltage for the
D4 Clover up to ~ 1.5 kV.
|
|