AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 6 of 21  ELOG logo
ID Date Author Subjectdown Text Attachments
  Draft   Thu Aug 18 22:39:35 2016 NT BrewerNew preamps arrived at Oak Ridge and tested working.Collaborators,

Attached is a phone photo of example
signals from the new preamps with 3 3He tubes
 IMG_20160818_145801.jpg 
  62   Thu Aug 18 23:32:59 2016 NT BrewerNew preamps arrived at Oak Ridge and tested working.Collaborators,

Attached is a phone photo of example
signals from the new preamps with 3 3He tubes
 IMG_20160818_145801.jpgIMG_20160803_160430.jpg 
  135   Tue Nov 8 06:13:11 2016 Tain et alNew plastic detector in F11There is a new plastic scintillator
after the MUSIC chambers
 PlasticsBehinMUSIC1.jpgPlasticsBehindMUSIC2.jpg 
  129   Mon Nov 7 13:11:42 2016 Alvaro, Ale, Jose, JorgeNew directory and Config fileFor second part of Takechi's run:

Directory: /data/1611Commissioning/161107Parasitic
 161107Conf_BrikenFull.xlsx 
  153   Tue Nov 22 08:28:36 2016 A. Tarifeno-Saldivia et alNew directory and Config FileA new directory in the IFICdaq computer has
been created for the parasitic measurements
during the Fallon Beam Time.
  
  19   Mon May 4 15:03:47 2015 J.Agramunt J.L.Tain K.Gabor New detector placed under the beam line New detector placed under the beam
line, below MUSIC chamber
This detector replace the USA tubes
 photo_2-2.JPGphoto_1-2.JPGphoto_3-2.JPG 
  24   Wed May 6 04:57:24 2015 J.L. Tain, J. Agramunt, G. KissNew degrader thicknessThe Al degrader thickness was reduced to 4.8mm   
  337   Sat Oct 21 17:11:03 2017 JA, ATD, JLTNew Gasific configuration fileConfiguration file saved on 22-Oct-2017 at
00:59
after increasing all the threshold in all
 171022_Conf_BrikenFullYSO.xlsx 
  344   Sun Oct 22 11:32:59 2017 JA,ATD, JLTNew Gasific Configuration file   171022_1846_Conf_BrikenFullYSO.xlsx 
  336   Sat Oct 21 17:05:21 2017 JA,ATD, JLTNew DACQ hardware configurationConfiguration of BRIKEN DACQ hardware:
Detector->VME->ADC->Channel
 TubeAncillaryDACQDistribution-October2017.xlsx 
  418   Tue Nov 6 21:51:54 2018 NT BrewerNew D4Off.conf for HV also on github


V A V/s
V/s 1/0









------
--------------- --------- ----- ---- -------
  
  257   Fri Mar 31 16:56:16 2017 JLT, YS,Liu,PV,CGNew Configuration fileNew configuration file: 
170331_Conf_BrikenFull.xlsx
  
  213   Wed Mar 29 17:15:21 2017 JLTNew Config fileNew configuration file:
170330_Conf_BrikenFull.xlsx
  
  167   Fri Nov 25 21:50:42 2016 ATNew Conf File161125Conf_BrikenFull.xlsx   
  127   Mon Nov 7 09:04:10 2016 Phong,Liu,Ale,JoseNew AIDA plastic calibrationTo have a range of about 200 MeV

Ortec671 Gain from x20 to x5 (fine gain :
 161107_1800_AIDAplasticCalib.pdf 
  32   Sat Jul 9 21:08:08 2016 J.L. TainNeutron moderatorDrawings of the polyethylene neutron moderator
and table assembly
 Moderator-Table.pdfTable.pdfModerator-Shielding.pdf 
  45   Tue Jul 19 13:47:55 2016 A. Tarifeņo-SaldiviaNeutron efficiency - Scanning on Z preliminary result We have carried out a scanning of
the neutron efficiency with respect to the
position along the Z-axis (AIDA and BEAM
 Preliminar_Zscaning_BRIKEN_PremLabel_vsmall.png 
  109   Fri Nov 4 13:16:42 2016 JLTain,ATolosa,JAgramuntNeutron BackgroundBeam tuning in BigRIPS

At 19:00 access to Exp. Area was closed and
 Screenshot_from_2016-11-04_22-26-10.pngScreenshot_from_2016-11-04_22-35-46.pngScreenshot_from_2016-11-04_22-35-29.pngScreenshot_from_2016-11-04_22-43-32.png 
  271   Sat Apr 1 04:03:31 2017 ID JA DK GKNa37 Ne36 run 056Date: 1/04/2017
Start:12:00
BRIKEN run: 56
  
  269   Sat Apr 1 01:04:31 2017 ID DK JANa37 Ne36 Run 54Date: 1/04/2017
Start: 09:03
BRIKEN run: 54
  
ELOG V3.1.4-unknown