  230   Tue Feb 22 07:27:28 2022 RSS, OF, ML Beam ON, Target ON Run 54 08:30

Beam ON ~1.0E7 pps

Target ON and open to the ring
 10x 
  229   Tue Feb 22 06:30:09 2022 RSS, OF Beam ON, Target ON Run 54 07:30

Beam ON ~8.0E6 pps

Target ON and open to the ring
 10x 
  228   Tue Feb 22 05:47:18 2022 JM, CB, LV, PM, AKBeam ON, Target ON Run 54 - 2 events at 10MeV!06:47

Beam ON ~2.0E6 pps, still fluctates
between 1e6 and 6e6 (like a step function)
 11x 
  227   Tue Feb 22 05:12:38 2022 JM, CB, LV, PM, AKBeam ON, Target ON Run 54 06:00

Beam ON ~1.5E6 pps, still fluctates
between 1e6 and 6e6 (like a step function)
 11x 
  226   Tue Feb 22 04:09:28 2022 JM, CB, LV, PM, AKBeam ON, Target ON Run 54 - first event at 10MeV !05:00

Beam ON ~2E6 pps, still fluctates
between 2e6 and 6e6 (like a step function)
 11x 
  225   Tue Feb 22 03:05:06 2022 JM, CB, LV, PM, AKBeam ON, Target ON Run 54 04:00

Beam ON ~5.5E6 pps, but it fluctates
between 2e6 and 6e6 (like a step function)
 9x 
  224   Tue Feb 22 02:02:11 2022 JM, CB, LV, PM, AKBeam ON, Target ON Run 54 03:00

Beam ON ~7E6 pps

Target ON and open to the ring
 10x 
  223   Tue Feb 22 00:32:35 2022 JM, CB, LV, PM, AKBeam ON, Target ON Run 54 01:30

Beam ON ~6E6 pps

Target ON and open to the ring
 2022-02-22_01-38-53-Ex-histogram.png2022-02-22_01-38-17-XYtotal.png 
  222   Mon Feb 21 21:04:08 2022 SHB, JM, CB, OH (remotely)Schottky RF view from the beam inside   pio-2022.02.21.21.54.46.895.PNG 
  221   Mon Feb 21 20:56:51 2022 SHB, JM, CB, OH (remotely)DAQ connection for ion currentsignals from ICT and CRYRADIO are now connected
to AIDA2 and AIDA5 respectively. ICT is set
to factor 200 and CRYRADIO to 40 for now.
 cry.jpg 
  220   Mon Feb 21 18:03:58 2022 SHB, JM, CB, OH (remotely)Info: signals on ion intensity for experimentCurrently 4 possibilities to have a look
at the beam, all of them are OK to check
whether there is beam or not, but some of
  
  219   Mon Feb 21 17:26:19 2022 JM, CB, SHB, OH (remotely)Beam ON run 5321/2/22 16:00

Call from main control room, beam
is ON, probably has been for several hours
 9x 
  218   Mon Feb 21 12:10:47 2022 RSS, JGAlpha background run50Beam OFF. Run started 20/2/22 18:42

System checck OK, except white
rabbit all fail
 220221_1506_aida03_1*W.png 
  217   Mon Feb 21 10:59:48 2022 RSS, JGAlpha background run50Beam OFF. Run started 20/2/22 18:42

System checck OK, except white
rabbit all fail
  
  216   Mon Feb 21 09:07:37 2022 RSS, JGAlpha background run50Beam OFF. Run started 20/2/22 18:42

System checck OK, except white
rabbit all fail
  
  215   Mon Feb 21 08:05:45 2022 RSS, JGAlpha background run50Beam OFF. Run started 20/2/22 18:42

System checck OK, except white
rabbit all fail
  
  214   Sun Feb 20 22:04:21 2022 JM, CBAlpha Background run 50 Beam OFF. Run started 20/2/22 18:42

Fast comparator threshold HEC set
to 0xff for all fees and asics to combat
  
  213   Sat Feb 19 20:08:43 2022 JM, CBBeam ON run 49Run started 19/2/22 21:05. Beam ON

Temperatures OK

System wide checks OK - white rabbit
 6x 
  212   Sat Feb 19 14:51:58 2022 JM, CBBurst high energy noiseNoticed bursts of high energy noise on
aida01 and aida02 during run 47 and 48.

Good events rate jumps from 10-20k
 2022-02-19_15-50-50-aida1-4-stat-logscale.png2022-02-19_15-47-13-aida1-2*H.png2022-02-19_15-49-48-aida2-1*H.png2022-02-20_14-01-40-aida1-2*H.png2022-02-20_14-02-55-aida1-1*H.png 
  211   Fri Feb 18 20:31:33 2022 JM, CBAlpha Background run 48Alpha background started with beam ON -
run47. Run started 16:49 18/2/22  
(beam subsequently found to be OFF)
 2022-02-19_14-45-25-leage-current.png 
ELOG V3.1.4-unknown