AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 10 of 29  ELOG logo
ID Date Author Subject Text Attachments
  389   Wed Apr 26 16:49:28 2023 CB, JMCARME dolly mostly built Disconnected cables from CARME motors and
turbo. The turbo has to go to allow Carme
to slide out. Crane may be required to lift
 20230426_152121.jpg20230426_162619.jpg20230426_162627.jpg 
  388   Tue Apr 25 13:22:19 2023 JMCARME venting CARME venting using nitrogen gas bottle. 

Coolant pipes dismounted from the
chamber
 20230425_134119.jpg20230425_132944.jpg 
  387   Mon Apr 24 21:24:26 2023 JMPreparation for CARME dismountCARME currently in vacuum, pressure ~3E-10
mbar. Chamber to be vented tomorrow afternoon
by vacuum division. We have active both pirani
 20230424_155635.jpg20230424_155607.jpg20230424_150526.jpg 
  386   Wed Mar 22 16:33:32 2023 TDNIM WR source
Test of NIM WR source at Edinburgh
 8x 
  385   Wed Jan 18 13:32:36 2023 PJCSMACB settings with either Emulator or VETARWhen using the VITAR connected
to the HDMI port of the root MACB the settings
for all the MACB in the system 0x3.
 macb_apr20.jedmacb_apr20.vhdzybo.jpgMACB.jpg 
  384   Thu Dec 8 14:41:19 2022 PJCSResults of tests on AIDA PSU in DL T9We opened one up and soldered a co-ax cable
to one of the +6v power contacts at the output
of the filter board.
 8x 
  383   Thu Dec 1 08:56:59 2022 AR TDThursday 1 December Photos of noise observed at each of the
AIDA PSU outputs by digital oscillscope.

DAQ GOing with waveforms enabled.
 11x 
  382   Wed Nov 30 08:52:59 2022 AR TDWednesday 30 November9:40

DSSD bias and leakage current values:

-99.99 V
 26x 
  381   Tue Nov 29 14:37:56 2022 AR TDTuesday 29 November16:20

DSSD bias and leakage current values:

-99.99 V
 22x 
  380   Mon Nov 28 13:14:33 2022 AR TDMonday 28 November   12x 
  379   Mon Oct 3 16:03:33 2022 OH, CBTTT14 PhotosPhotos of the new TTT14 DSSD delivered to
GSI.
Photos of detectors are broken up by photos
  
  378   Sun Aug 14 06:50:58 2022 TD, JMSunday 14 August
07.51 DAQ continues files 22Feb/R97
 10x 
  377   Sat Aug 13 10:23:59 2022 JM, TDNoise tests pt3 and pulser walkWaveforms and discriminator ON. Pulser
re-connected to all fees via daisy chain.
V=100v, I=8.36uA
 15x 
  376   Fri Aug 12 15:12:37 2022 JM, TDCARME measurementsmeasurement 1 -string
intermediate (smaller) chamber - 2144
(mm) circumference,  measured half circumference
 9x 
  375   Fri Aug 12 09:06:57 2022 TD, JMNoise tests pt2
10.07 DSSSD bias -100V leakage current -8.65uA
 30x 
  374   Thu Aug 11 09:25:13 2022 JM, TDNoise tests
Moved pneumatic motor in and out several
revolutions
 14x 
  373   Wed Aug 10 10:33:03 2022 TD, ML, JM, NPMeeting at YR09 to discuss options for CARME operations to February 2022
Initial discussions of proposals to provide
open CARME chamber and provide access to
 20220810_111638.jpg20220810_095036.jpg20220810_095150.jpg20220810_095159.jpg 
  372   Wed Aug 10 10:30:04 2022 TD, JMWednesday 10 August
09.45 Found CARME electrical power off
 4.PNG3.PNG2.png1.png 
  371   Tue Aug 9 16:07:33 2022 JM, TDAnydesk setup command lineTo log into appc218 desktop:
same login and password as to carme@atppc022.gsi.de

To start anydesk
  
  370   Tue Aug 9 13:44:16 2022 TD, JMTuesday 9 August
14.00 CARME vacuum c. 1.8e-10 mbar - see
attachment 1
 Capture_1.PNG20220809_163450.jpg20220809_135840.jpg20220809_135833.jpg20220809_135801.jpg 
ELOG V3.1.4-unknown