Entry  Fri Feb 16 22:03:27 2024, TD, Run 35 - night shift 49x

22.51 DAQ continues file G22-86/R35_36
Entry  Fri Feb 16 10:02:41 2024, JM, OF, CB, AR, EM, Run 35 - cooled beam on target 27x
11:01

Run 35 started cooled beam on target

Detectors IN (left arm pot =36.5 mm, right arm pot = 70.49 mm)
Entry  Thu Feb 15 21:07:00 2024, JM, AB, AR, OF, Run33 - cooled beam on target 22x
22:27

Run 33 started cooled beam on target.

Detectors IN (left arm pot =36.5 mm, right arm pot = 70.49 mm)
Entry  Thu Feb 15 13:18:30 2024, JG, MBS DAQ: target & ring values 2024_jet_daq.txt
We are running an MBS DAQ to record the attached list of slow control values of the ring and the target. In most cases this is achieved by converting
analog monitor voltages to frequencies and recording them with a VME scaler (VULOM4B with scaler-firmware). The complete list of signals is attached including
a channel mapping.
Entry  Thu Feb 15 12:40:52 2024, JM. CB, AR, AB, Run30 - uncooled beam on target 29x
Run started 13:40

Target density 4.3e11, Beam injection is ~1e7, Pressure in the ring is ~1e-10 mbar.

Detectors have been moved IN with servo motors only (left arm pot = 36.5 mm, right arm pot =37.7 mm
Entry  Thu Feb 15 10:39:50 2024, JM, JG, ML, AG, CB, Run29 - beam optimisation 
11:27

Run 29 started. Beam energy is 1.3435 MeV/u with a cooler voltage of 751.3 V.

We observe significantly greater count rate for top right detector (DSSD#1) now that the beam energy has been lowered. ADC over range? Beam target
Entry  Wed Feb 14 16:52:46 2024, JM, AR, CB, JG, Run28 - beam on target  42x
 

Beam energy - 1.361 MeV/u

17:12
Entry  Wed Feb 14 14:59:13 2024, JM, CB, NP, ML, AG, AB, Run 27 -Beam on target optimisation Target-overlap-scan-optimized.pdf
Run 27 Started to check optimsation of the beam - target overlap.

Beam intensity at injection is roughly 1e7 particles

Target density apporx 4.2e11 atoms/cm2 and stable.
Entry  Wed Feb 14 14:06:28 2024, CB AR JM, Pulser Walkthrough 

15:06
Run25

Pulser walkthrough

EGG Ortec 448 Pulser

Amplitide 90,000-10,000 @ 10,000 step
Normalise 5.0
Attenuators x5 IN
t_r 100ns
Tau_d
50us
Frequency Int Osc 50Hz
Polarity + ( - polarity via Cooknell SA1 Sum & Invert Amp )
Entry  Wed Feb 14 08:44:32 2024, CB AR JM, Motors test and turbo ON 11x
Run number changed 09:44 - Now run 23

Moving motors with the injection

Ring signal very weird, moving in for short time and staying out for 15+ seconds.
Entry  Tue Feb 13 17:19:43 2024, JM, AR, NP, AB, RSS, Run22 - cooled beam on target (definitely maybe) 48x
18:05 We believe we have an overlap between the beam and the target. Run 22 started.

          CARME detectors in with the servo ONLY. Left arm pot 36.5 mm, right arm pot 37.7 mm

          Target density apporx 2e11 atoms/cm2.
Entry  Tue Feb 13 08:34:44 2024, Hw, JM, AR, CB, NP, AB, RSS, Status of DAQ - beam overlap 10x
Check the status of the DAQ system, with Tom. All correct. See attachments:

1 Leackage currents

2 ADC data item stats
Entry  Mon Feb 12 01:40:48 2024, TD, JM, CB, AR, RSS, Run17 - Run20  49x

02.35 DAQ continues file G22-88/R17_30
Entry  Sun Feb 11 13:28:46 2024, JM, CB, TD, Run16 - beam on target 30x
13:37 Run started - no beam in the ring (One of the ring magnets was still on RED when it should have been set to green by HKR)

14:28 Beam ON - still observe beam halo on DSSD0 (Top left)

          YR09 Vertical and horizontal offsets set to -9.0 mm
Entry  Sun Feb 11 07:03:34 2024, TD, Sunday 11 February 20x

02.02 DAQ continues G22-86/R15_21
      alpha background
Entry  Sat Feb 10 17:05:13 2024, TD, Run 15 - background 20x

17.55 DAQ continues G22-86/R15_11
      alpha background
Entry  Sat Feb 10 10:00:44 2024, AR RSS JM CB, Run 13, 14 23x
System checks: all ok

Attatchment 1: Rates ok

Attatchment 2: Temperatures ok
Entry  Fri Feb 9 17:04:39 2024, JM, AR, CB, NH, Run12 - Background 
 
Entry  Fri Feb 9 11:58:04 2024, TD + CB, JM, AR, NH, AB, Run10 contd, Run11 27x

12.46 DAQ continues G22-88/R10_14
Entry  Fri Feb 9 07:57:38 2024, AR, CB, AB, JM, Run10 - First cool beam on target 27x
8:58

System wide checks okay, except

   