428
|
Tue Jul 25 09:12:15 2023 |
RSS | Building tent |
10:10 IE514 2.0e-08mbar
Upstream
part of the CARME is covered. |
 |
427
|
Mon Jul 24 10:40:14 2023 |
RSS, TD | Pump down continues | 11.40 Pirani 1.00e-3 mbar IE514 2.23e-08mbar
15.15 7d/24h vacuum plots |
 |
426
|
Sun Jul 23 10:13:48 2023 |
RSS, TD | Building tent | 11.15 Pirani 1.0e-03mbar IE514 2.72e-08mbar
16.35 Pirani 1.0e-03mbar IE514 2.61e-08mbar |
   |
425
|
Sat Jul 22 09:19:59 2023 |
RSS, TD | Thermocouples connected | 10.20 Pirani 1e-03mbar IE514 3.26e-08mbar
|
10x |
424
|
Fri Jul 21 08:21:54 2023 |
TD, RSS | Baking tent manual | 09.20 Pirani 1.00e-3 mbar IE514 3.90e-8 mbar
Today - install TCs, connect to Pico |
|
423
|
Thu Jul 20 08:29:26 2023 |
TD | Installing tent. Two NEG power cable broken. | 09.28 Pirani 1.00e-3 mbar IE514 5.45e-8 mbar
12.10 Bakeout tent frame installed
|
11x |
422
|
Wed Jul 19 08:17:26 2023 |
TD | Leak testing | 09.16 Pirani 1.00e-3 mbar IE514 8.77e-8 mbar
Leak tester c. 5e-12 mbar.l/s (leak
tester valved off)
|
|
421
|
Tue Jul 18 08:16:28 2023 |
TD | Pumping down. Issues found with one detector. | 09.15 Following overnight pumping of CARME
chamber by Leybold turbo
Pirani 1.00e-3 mbar IE514 2.83e-7 mbar
|
|
420
|
Mon Jul 17 08:45:11 2023 |
TD | Closing CARME again |
Grosmantage are scheduled to arrive 10.00
to inspect COF600 seals and their fit to |
|
419
|
Fri Jul 14 08:27:17 2023 |
TD | CARME open - inspecting seal |
09.20 CARME chamber at atmospheric pressure
as expected.
|
|
418
|
Thu Jul 13 08:46:44 2023 |
TD | Replacing wire seal |
09.30 CARME chamber status
|
 |
417
|
Thu Jul 13 00:12:45 2023 |
JM, CB | CARME closed | The CARME chamber was closed and pushed
back into position on the ring.
Prior to moving back onto the ring, |
  |
416
|
Thu Jul 13 00:12:19 2023 |
JM, CB | Bellow replaced | The left (inside ring) bellow for the motors
rod was replaced.
Replacing the bellow involved; |
|
415
|
Thu Jul 6 15:26:39 2023 |
JM | Leak update | The leak on the actuator arm bellows has
been attempted to be sealed using UHV vacuum
seal spray. The spray had the opposite to |
|
414
|
Wed Jul 5 19:27:13 2023 |
JM | Pump down and leak test | CARME and the interaction chamber have
been pumping for ~26 hours, P=4.15e-7 mbar,
attached figures show the current pump down |
  |
413
|
Tue Jul 4 17:08:08 2023 |
JM | Leak test and venting | This morning the pressure achieved was
1.44E-7 mbar. Leak testing showed an overall
leak rate of 1.5E-10 mbar l/s, this is below |
 |
412
|
Mon Jun 26 14:49:05 2023 |
JM, TD | CARME vented | 26/06/23
This morning the pressure was 4e-7
mbar. The bolts on the windows and the large |
|
411
|
Sun Jun 25 14:30:06 2023 |
JM, TD | Motors bias test | The motors were moved using the pneumatic
only, in and out for several cycles to gauge
the effect on the vacuum. For the left arm |
|
410
|
Sun Jun 25 10:08:30 2023 |
JM, TD | Pump-down | 23/06/23
Pumpdown started with the scroll
pump 17:15 . The turbo-pump was started 17:55. |
   |
409
|
Sun Jun 25 09:41:06 2023 |
JM, TD | Normal turbo-pump operation | Attached are images showing the messages
for normal turbo-pump operation |
6x |