AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 13 of 38  ELOG logo
Entry  Sun Jun 9 22:14:23 2024, TD, PM, AG, Run 56 - Data taking 31x
23:15 New run 56 with

      Right arm at 64.60 mm
Entry  Fri Feb 25 15:38:40 2022, JM, CB, PJW, Run 55, 56, 59 root histograms 6x
Run55 - detector out, start 22/2/22 13:20, end 23/2/22 10:49

Run 56 - detector moved in, start 23/2/22 10:4, end 23/2/22 15:46

Run 59 - detector position optimised, detector position in, start 23/2/22 17:57, end 24/2/22 00:04
Entry  Sun Jun 9 13:45:24 2024, CB PMH AG, Run 55 - Data taking 18x
14:45

New run 55 with:

Right arm at 64.60 mm
Entry  Sun Jun 9 08:30:49 2024, JM, CB, Run 54 - beam on target 7x
09:30

New run 54 with:

Electron cooler setpoint 244.1 V
Entry  Sat Jun 7 10:06:27 2025, JM, EM, CB, DB, AY, PC, CB, Run 54 50x
11:10

We have started a new run at the same energy as R53 (250 keV/u) due to an issue with the DAQ pc

Server and DAQ restarted
Entry  Fri Jun 6 17:27:03 2025, AY, ST, JM, EM, DB, Run 53 11x
Run 53 started at 18:25 (started already earlier but since then data is taken). Everything is running again. We started at 3E12 at/cm2.
Side comment: Gleb told us 1h ago that he will switch to coasted mode and call us back as soon as he is done. So far he didn't call back and
he is not in the office... So we decided to start data taking already. But: the software says that coasting mode is already on, but the graph looks like
Entry  Sat Jun 8 20:32:17 2024, LB, JM, Run 52 - beam on target Screenshot_from_2024-06-08_22-56-26.pngScreenshot_from_2024-06-09_00-17-44.pngScreenshot_from_2024-06-09_00-18-46.pngScreenshot_from_2024-06-09_01-50-54.pngScreenshot_from_2024-06-09_01-51-27.png
New run 52 with:

Electron cooler setpoint 244.2 V

Electron cooler read 243.66 V
Entry  Thu Jun 5 16:54:18 2025, EW, ST, CB, Run 52 - 0.3 MeV/A 14x
Run 52 started at 17:53. Everything is running again. We started at 3E12 at/cm2

D+ beam deuterium target. D+ beam energy is now 0.3 MeV/u. (beam calc calculation is 0.3067 MeV/u).

All four detectors positioned fully out and stationary and also detector #4 is running again.
Entry  Thu Jun 5 08:50:00 2025, JM, CF, CB, EW, Run 51 - background Screenshot_from_2025-06-05_09-38-05.pngScreenshot_from_2025-06-05_09-46-08.pngScreenshot_from_2025-06-05_09-51-43.png
09:49

DSSD4 has been biased to 100V in steps of 5V from 60V. It was previously stable overnight at 60V - attachment 1

Will keep an eye on it but looks OK at the moment. Current bias and leakage current - attachment 2
Entry  Sat Jun 8 10:13:52 2024, CB, JM, TD, Run 50/51 - data taking 8x
11:13

ML enabled ring signals remotely.

Used FakeMotion.dat (read FakeMotion.dat from InteractiveMotion.x).
Entry  Wed Jun 4 10:44:36 2025, EW, CB, JM, OF, JG, ST, Run 50 - 0.35 MeV/A 13x
11:30

Run 50 started.

D+ beam deuterium target. D+ beam energy is 0.35 MeV/u. (beam calc calculation is 0.3577 MeV/u)
Entry  Wed Jun 4 00:10:39 2025, JM, Run 49 - beam only 6x
01:10

Gas target turned off via the shutter valve.

Run 49 started beam only background run.
Entry  Tue Feb 20 09:57:57 2024, OF, AG, ML, Run 48 status check Screenshot_from_2024-02-20_11-06-48.pngScreenshot_from_2024-02-20_11-08-05.pngScreenshot_from_2024-02-20_11-12-26.pngScreenshot_from_2024-02-20_11-13-58.png2024-02-20_11-37-46-304.png
Doing morning check. Checked the leakage currents, all ok. Attachment 1

Temperatures ok, attchment 2

System wide check, all correct.
Entry  Tue Feb 20 09:51:37 2024, JM, Run 48 beam on target 
Run 48 started
Entry  Tue Jun 3 14:54:29 2025, PMH, ST, Run 48 6x
Run 48 started. Everything is running again. We started at 3E13 at/cm2

D+ beam deuterium target. D+ beam energy is still 0.5 MeV/u. (beam calc calculation is 0.5143 MeV/u). See previous entry for beamcalc.

All four detectors positioned fully out and stationary, however we switched off detector #4.
Entry  Sat Jun 8 06:13:21 2024, CB, Run 47/48/49 - target issues & tests Screenshot_from_2024-06-08_07-15-27.pngScreenshot_from_2024-06-08_07-15-33.pngScreenshot_from_2024-06-08_10-13-16.pngScreenshot_from_2024-06-08_10-13-23.pngScreenshot_from_2024-06-08_10-13-26.png
07:00

After putting the target back, we observe strong periodic (5 s) fluctuations going from 3E11 to 5E12. The reason is unclear. One may warm up
the target to solve this, but will ask Nikos later instead.
Entry  Tue Jun 3 11:16:07 2025, EW, EM, JM, Run 47, beam only background Screenshot_from_2025-06-03_12-20-25.pngScreenshot_from_2025-06-03_12-19-36.png
Run 47 started. Target cooling down after water cooler failure, beam only background

D+ beam deuterium target. D+ beam energy is 0.5 MeV/u. (beam calc calculation is 0.5143 MeV/u). See previous entry for beamcalc.

All four detectors positioned fully out and stationary.
Entry  Sat Jun 8 00:14:39 2024, LB, Run 46 - background with beam 22x
RUN 46- started at 00:50

Horizontal beam position = 4.0 mm, vertical beam position = -5.0 mm.

Detectors are Left arm OUT = 36.64, right arm IN =  64.60 mm
Entry  Mon Jun 2 20:03:43 2025, JG, AG, CB, EW, EM, Run 45/46, 0.5 MeV/A 13x
Run 45 started.

D+ beam deuterium target. D+ beam energy is 0.5 MeV/u. (beam calc calculation is 0.5143 MeV/u). See attachment for beamCalc

Target density is about 2e12 at/cm2
Entry  Fri Jun 7 22:33:13 2024, LB, Run 45 - tests on beam-target overlap Screenshot_from_2024-06-07_23-11-06.pngScreenshot_from_2024-06-07_23-12-17.pngScreenshot_from_2024-06-07_23-32-22.pngScreenshot_from_2024-06-07_23-43-43.pngScreenshot_from_2024-06-07_23-50-54.png
Tried to double check beam-target overlap by changing beam horizontal coordinate.

In the tablethe counts in the 4000-5200 keV region in each of the detectors are recorded. Counts were taken for a total time of 5 minutes per
beam position. Attached are the xy plots.
ELOG V3.1.3-7933898