AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 13 of 38  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Subjectdown Text Attachments
  608   Sun Jun 9 22:14:23 2024 TD, PM, AGRun 56 - Data taking23:15 New run 56 with

      Right arm at 64.60 mm
 31x 
  283   Fri Feb 25 15:38:40 2022 JM, CB, PJWRun 55, 56, 59 root histogramsRun55 - detector out, start 22/2/22 13:20,
end 23/2/22 10:49

Run 56 - detector moved in, start
 6x 
  607   Sun Jun 9 13:45:24 2024 CB PMH AGRun 55 - Data taking14:45

New run 55 with:

Right arm at 64.60 mm
 18x 
  605   Sun Jun 9 08:30:49 2024 JM, CBRun 54 - beam on target09:30

New run 54 with:

Electron cooler setpoint
 7x 
  724   Sat Jun 7 10:06:27 2025 JM, EM, CB, DB, AY, PC, CBRun 5411:10

We have started a new run at the
same energy as R53 (250 keV/u) due to an
 50x 
  723   Fri Jun 6 17:27:03 2025 AY, ST, JM, EM, DBRun 53Run 53 started at 18:25 (started already
earlier but since then data is taken). Everything
is running again. We started at 3E12 at/cm2.
 11x 
  604   Sat Jun 8 20:32:17 2024 LB, JMRun 52 - beam on targetNew run 52 with:

Electron cooler setpoint
244.2 V
 Screenshot_from_2024-06-08_22-56-26.pngScreenshot_from_2024-06-09_00-17-44.pngScreenshot_from_2024-06-09_00-18-46.pngScreenshot_from_2024-06-09_01-50-54.pngScreenshot_from_2024-06-09_01-51-27.png 
  721   Thu Jun 5 16:54:18 2025 EW, ST, CBRun 52 - 0.3 MeV/ARun 52 started at 17:53. Everything is
running again. We started at 3E12 at/cm2

D+ beam deuterium target. D+ beam
 14x 
  720   Thu Jun 5 08:50:00 2025 JM, CF, CB, EWRun 51 - background09:49

DSSD4 has been biased to 100V in
steps of 5V from 60V. It was previously stable
 Screenshot_from_2025-06-05_09-38-05.pngScreenshot_from_2025-06-05_09-46-08.pngScreenshot_from_2025-06-05_09-51-43.png 
  601   Sat Jun 8 10:13:52 2024 CB, JM, TDRun 50/51 - data taking11:13

ML enabled ring signals remotely.

Used FakeMotion.dat (read FakeMotion.dat
 8x 
  719   Wed Jun 4 10:44:36 2025 EW, CB, JM, OF, JG, STRun 50 - 0.35 MeV/A11:30

Run 50 started.

D+ beam deuterium target. D+ beam
 13x 
  718   Wed Jun 4 00:10:39 2025 JMRun 49 - beam only01:10

Gas target turned off via the shutter
valve.
 6x 
  536   Tue Feb 20 09:57:57 2024 OF, AG, MLRun 48 status checkDoing morning check. Checked the leakage
currents, all ok. Attachment 1

Temperatures ok, attchment 2
 Screenshot_from_2024-02-20_11-06-48.pngScreenshot_from_2024-02-20_11-08-05.pngScreenshot_from_2024-02-20_11-12-26.pngScreenshot_from_2024-02-20_11-13-58.png2024-02-20_11-37-46-304.png 
  535   Tue Feb 20 09:51:37 2024 JMRun 48 beam on targetRun 48 started   
  717   Tue Jun 3 14:54:29 2025 PMH, STRun 48Run 48 started. Everything is running again.
We started at 3E13 at/cm2

D+ beam deuterium target. D+ beam
 6x 
  600   Sat Jun 8 06:13:21 2024 CBRun 47/48/49 - target issues & tests07:00

After putting the target back,
we observe strong periodic (5 s) fluctuations
 Screenshot_from_2024-06-08_07-15-27.pngScreenshot_from_2024-06-08_07-15-33.pngScreenshot_from_2024-06-08_10-13-16.pngScreenshot_from_2024-06-08_10-13-23.pngScreenshot_from_2024-06-08_10-13-26.png 
  716   Tue Jun 3 11:16:07 2025 EW, EM, JMRun 47, beam only backgroundRun 47 started. Target cooling down after
water cooler failure, beam only background

D+ beam deuterium target. D+ beam
 Screenshot_from_2025-06-03_12-20-25.pngScreenshot_from_2025-06-03_12-19-36.png 
  599   Sat Jun 8 00:14:39 2024 LBRun 46 - background with beamRUN 46- started at 00:50

Horizontal beam position = 4.0
mm, vertical beam position = -5.0 mm.
 22x 
  715   Mon Jun 2 20:03:43 2025 JG, AG, CB, EW, EMRun 45/46, 0.5 MeV/ARun 45 started.

D+ beam deuterium target. D+ beam
energy is 0.5 MeV/u. (beam calc calculation
 13x 
  598   Fri Jun 7 22:33:13 2024 LBRun 45 - tests on beam-target overlapTried to double check beam-target overlap
by changing beam horizontal coordinate.

In the tablethe counts in the 4000-5200
 Screenshot_from_2024-06-07_23-11-06.pngScreenshot_from_2024-06-07_23-12-17.pngScreenshot_from_2024-06-07_23-32-22.pngScreenshot_from_2024-06-07_23-43-43.pngScreenshot_from_2024-06-07_23-50-54.png 
ELOG V3.1.4-unknown