  585   Tue Jun 4 06:56:02 2024 DFF, PC, LB, JM,NP,ABRun 31 contd8:13

Since 6:40 the target density dramatically
dropped to 10^9 since then it has been unstable
 Screenshot_from_2024-06-04_10-53-58.pngScreenshot_from_2024-06-04_10-58-02.png 
  584   Tue Jun 4 00:04:39 2024 DR, EHRun 31Beam energy = 3 MeV

Horizontal beam position = 4.0
mm, vertical beam position = 0.0 mm.
  
  513   Wed Feb 14 14:59:13 2024 JM, CB, NP, ML, AG, ABRun 27 -Beam on target optimisationRun 27 Started to check optimsation of
the beam - target overlap.

Beam intensity at injection is
 Target-overlap-scan-optimized.pdf 
  580   Mon Jun 3 11:46:07 2024 SD, SHB, JM, CN, EMRun 2712:46 (attachments 1-4)

Run 27 started - Beam no target

Beam energy = 3 MeV
 12x 
  579   Mon Jun 3 08:43:22 2024 SD, SHBRun 2609:44

Run 26 started - Beam no target

Beam energy is being increased
 8x 
  578   Sun Jun 2 23:38:17 2024 JM, EMRun 25 00:38

Run 25 started - Beam on target

Beam energy = 1.5 MeV.
 32x 
  575   Sun Jun 2 13:04:41 2024 JM, AG, CB, DRRun 23 - vertical beam position and beam lifetime tests14:05

Run 22 stopped. Run 23 started
we will now adjust the vertical beam position
 Screenshot_from_2024-06-02_14-04-55.png 
  574   Sun Jun 2 08:47:01 2024 CB, AGRun 22 - longer rung with 20 min storage09:47

12 seconds pre acc

200x cycles
 Screenshot_from_2024-06-02_09-47-53.pngScreenshot_from_2024-06-02_09-48-06.pngScreenshot_from_2024-06-02_11-21-59.pngScreenshot_from_2024-06-02_11-22-27.pngScreenshot_from_2024-06-02_13-02-31.png 
  573   Sun Jun 2 06:41:00 2024 CB, AGRun 21 - tests07:41

Switching to bunched beam to check
D vs H content.
 10x 
  572   Sat Jun 1 21:56:17 2024 JM, EM, EM, TY, CB, AGRun 2022:56

Run 20 started - beam on target

Beam energy is 1.5 MeV. Horizontal
 18x 
  554   Tue May 28 12:38:31 2024 TD, JM, CBRun 2 - Alpha background run
13.35 FEE64 temperatures OK - attachment
1
 Screenshot_from_2024-05-28_13-35-03.pngScreenshot_from_2024-05-28_13-34-30.pngScreenshot_from_2024-05-28_13-33-19.pngScreenshot_from_2024-05-28_13-36-30.pngScreenshot_from_2024-05-28_13-37-16.png 
  569   Sat Jun 1 07:16:15 2024 CB, AB, EM, JMRun 19 - beam target overlapMorning shift

08:16 - as run 18, target off

9:00 Increased storage time to
 19x 
  505   Sat Feb 10 17:05:13 2024 TDRun 15 - background
17.55 DAQ continues G22-86/R15_11
      alpha background
 20x 
  504   Sat Feb 10 10:00:44 2024 AR RSS JM CBRun 13, 14System checks: all ok

Attatchment 1: Rates ok

Attatchment 2: Temperatures ok
 23x 
  566   Fri May 31 19:12:01 2024 CB, EMRun 13 - test with beam20:00

The beam is set at the correct
energy, operators cross-checked it again.
 Screenshot_from_2024-05-31_20-13-46.pngScreenshot_from_2024-05-31_20-27-58.pngScreenshot_from_2024-05-31_20-32-59.png 
  565   Fri May 31 06:01:55 2024 JM, TY, PW, EM, CBRun 12 - beam on target07:00

Run 12 started. D+ beam is incident
on the target at 1.5 MeV
 12x 
  564   Thu May 30 13:31:01 2024 JM, CB, PW, YLRun 11 - beam on target overlap14:30

Run 11 started. D+ beam in the
ring at 1.5 MeV.
 Screenshot_from_2024-05-30_14-33-19.pngScreenshot_from_2024-05-31_02-09-35.pngScreenshot_from_2024-05-31_06-57-12.png20240531_073828.jpg 
  657   Wed Jun 19 12:08:34 2024 CB + variousRun 101-105Run 101: no target. See ELOG entry by TD.

Run 102: ??

Run 103: ??
  
  563   Thu May 30 09:30:33 2024 CB, PW, YL, TDRun 1010:30

Merger OK, Tape server OK

ADC data item statistics looks
 13x 
  384   Thu Dec 8 14:41:19 2022 PJCSResults of tests on AIDA PSU in DL T9We opened one up and soldered a co-ax cable
to one of the +6v power contacts at the output
of the filter board.