AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 15 of 38  ELOG logo
Entry  Sat May 31 10:46:42 2025, TD, Run 38 - remote monitoring 21x

11.40 DAQ continues
      File G22-205/R38
Entry  Thu Jun 6 05:44:45 2024, DR YL DB LB CB JM, Run 38 - 15N Tests 8x
06:45

All system checks OK

Target density 3.4e11
Entry  Sat May 31 09:58:21 2025, JM, Run 38 10x
10:56

Run 38 started.

D+ beam deuterium target. D+ beam energy is 1.5 MeV/u. (beam calc calculation is 1.5160 MeV/u)
Entry  Wed Jun 5 13:34:02 2024, JM, Run 37 - Change in thresholds Screenshot_from_2024-06-05_14-36-44.png
14:20

Target nozzle currently being replaced. No beam

We have decided to switch to 15N beam from now on.
Entry  Fri May 30 21:49:08 2025, JM, NP, CB, Run 37 Screenshot_from_2025-05-31_00-56-32.pngScreenshot_from_2025-05-31_00-58-40.pngScreenshot_from_2025-05-31_06-16-50.png
22:49

Run 37 started.

D+ beam deuterium target. D+ beam energy is 2 MeV/u. (beam calc calculation is 1.9211 MeV/u)
Entry  Wed Jun 5 13:21:45 2024, JM, CB, Run 36 - pulser walkthrough Screenshot_from_2024-06-05_14-20-18.pngScreenshot_from_2024-06-05_14-21-26.pngScreenshot_from_2024-06-05_14-27-43.pngScreenshot_from_2024-06-05_14-25-44.png
14:00

Access to the cave as Nikos and Andreas have begun work on the target.

Run 36 started - pulser walkthrough.
Entry  Fri May 30 20:47:47 2025, JM, CB, NP, Run 36 Screenshot_from_2025-05-30_22-45-48.pngScreenshot_from_2025-05-30_22-46-48.png
21:47

Run 36 started.

D+ beam deuterium target. D+ beam energy is 2 MeV/u.
Entry  Fri Feb 16 22:03:27 2024, TD, Run 35 - night shift 49x

22.51 DAQ continues file G22-86/R35_36
Entry  Fri Feb 16 10:02:41 2024, JM, OF, CB, AR, EM, Run 35 - cooled beam on target 27x
11:01

Run 35 started cooled beam on target

Detectors IN (left arm pot =36.5 mm, right arm pot = 70.49 mm)
Entry  Sat Feb 17 06:19:27 2024, JM, CB, Run 35 - contd Screenshot_from_2024-02-17_07-20-01.pngScreenshot_from_2024-02-17_07-21-27.pngScreenshot_from_2024-02-17_09-09-35.pngScreenshot_from_2024-02-17_09-13-44.pngScreenshot_from_2024-02-17_09-14-35.png
07:10

FEE temperatures OK

System checks OK
Entry  Tue Jun 4 18:08:04 2024, Boudefla Dounia - CB - LB - SD, Run 34 19x
19:08

Beam energy = 3 MeV.

Horizontal beam position = 4.0 mm, vertical beam position = 0.0 mm.
Entry  Tue Jun 4 15:25:36 2024, BD US CB, Run 33 Screenshot_from_2024-06-04_18-33-23.pngScreenshot_from_2024-06-04_18-33-38.pngScreenshot_from_2024-06-04_18-35-26.pngScreenshot_from_2024-06-04_18-36-55.png
16:26

Merger OK, Tape server OK

ADC data item statistics looks as before. OK
Entry  Tue Jun 4 14:13:17 2024, JM, CB, DB, US, Run 32- beam only background 
15:15

Run 32 started - Beam, no target

Beam energy = 3 MeV.
Entry  Thu May 29 18:04:47 2025, LB, CB, PMH, JM, Run 32,33,34 7x
Oven temperature increased, current up to 3.5E7 pps.

Found beam-target overlap setting horizontal bump in RO9 to -2.5mm.

Target T1 30.5K, density increasing to 2.6E11 at/cm2.
Entry  Tue Jun 4 06:56:02 2024, DFF, PC, LB, JM,NP,AB, Run 31 contd Screenshot_from_2024-06-04_10-53-58.pngScreenshot_from_2024-06-04_10-58-02.png
8:13

Since 6:40 the target density dramatically dropped to 10^9 since then it has been unstable and did not recover. Currently it is around 8e8.

09:00
Entry  Tue Jun 4 00:04:39 2024, DR, EH, Run 31 
Beam energy = 3 MeV

Horizontal beam position = 4.0 mm, vertical beam position = 0.0 mm.

Beam intensity at inj ~ 2.5e7
Entry  Thu May 29 14:39:52 2025, CB LB PMH, Run 31 9x
15:40

Waiting for Serge to come in to change beam energy.

Remaining at the same beam energy and settings as before, except RIGHT arm now moving.
Entry  Wed May 28 16:40:48 2025, EH, SN, LB, OF, EBM, CB, Run 28/29/30 - 1.88 MeV/A 37x
We start a new run with real data taking condititon: beam is ok, target density is 1e12 cm-2, detectors are moving in-out periodically.

 

Cooler voltage setpoint 1066.6 V. Read value 1068 V.
Entry  Wed Feb 14 14:59:13 2024, JM, CB, NP, ML, AG, AB, Run 27 -Beam on target optimisation Target-overlap-scan-optimized.pdf
Run 27 Started to check optimsation of the beam - target overlap.

Beam intensity at injection is roughly 1e7 particles

Target density apporx 4.2e11 atoms/cm2 and stable.
Entry  Mon Jun 3 11:46:07 2024, SD, SHB, JM, CN, EM, Run 27 12x
12:46 (attachments 1-4)

Run 27 started - Beam no target

Beam energy = 3 MeV
ELOG V3.1.4-unknown