Sat May 31 10:46:42 2025, TD, Run 38 - remote monitoring 21x
|
11.40 DAQ continues
File G22-205/R38
|
Thu Jun 6 05:44:45 2024, DR YL DB LB CB JM, Run 38 - 15N Tests 8x
|
06:45
All system checks OK
Target density 3.4e11 |
Sat May 31 09:58:21 2025, JM, Run 38 10x
|
10:56
Run 38 started.
D+ beam deuterium target. D+ beam energy is 1.5 MeV/u. (beam calc calculation is 1.5160 MeV/u) |
Wed Jun 5 13:34:02 2024, JM, Run 37 - Change in thresholds
|
14:20
Target nozzle currently being replaced. No beam
We have decided to switch to 15N beam from now on. |
Fri May 30 21:49:08 2025, JM, NP, CB, Run 37  
|
22:49
Run 37 started.
D+ beam deuterium target. D+ beam energy is 2 MeV/u. (beam calc calculation is 1.9211 MeV/u) |
Wed Jun 5 13:21:45 2024, JM, CB, Run 36 - pulser walkthrough   
|
14:00
Access to the cave as Nikos and Andreas have begun work on the target.
Run 36 started - pulser walkthrough. |
Fri May 30 20:47:47 2025, JM, CB, NP, Run 36 
|
21:47
Run 36 started.
D+ beam deuterium target. D+ beam energy is 2 MeV/u. |
Fri Feb 16 22:03:27 2024, TD, Run 35 - night shift 49x
|
22.51 DAQ continues file G22-86/R35_36
|
Fri Feb 16 10:02:41 2024, JM, OF, CB, AR, EM, Run 35 - cooled beam on target 27x
|
11:01
Run 35 started cooled beam on target
Detectors IN (left arm pot =36.5 mm, right arm pot = 70.49 mm) |
Sat Feb 17 06:19:27 2024, JM, CB, Run 35 - contd    
|
07:10
FEE temperatures OK
System checks OK |
Tue Jun 4 18:08:04 2024, Boudefla Dounia - CB - LB - SD, Run 34 19x
|
19:08
Beam energy = 3 MeV.
Horizontal beam position = 4.0 mm, vertical beam position = 0.0 mm. |
Tue Jun 4 15:25:36 2024, BD US CB, Run 33   
|
16:26
Merger OK, Tape server OK
ADC data item statistics looks as before. OK |
Tue Jun 4 14:13:17 2024, JM, CB, DB, US, Run 32- beam only background
|
15:15
Run 32 started - Beam, no target
Beam energy = 3 MeV. |
Thu May 29 18:04:47 2025, LB, CB, PMH, JM, Run 32,33,34 7x
|
Oven temperature increased, current up to 3.5E7 pps.
Found beam-target overlap setting horizontal bump in RO9 to -2.5mm.
Target T1 30.5K, density increasing to 2.6E11 at/cm2. |
Tue Jun 4 06:56:02 2024, DFF, PC, LB, JM,NP,AB, Run 31 contd 
|
8:13
Since 6:40 the target density dramatically dropped to 10^9 since then it has been unstable and did not recover. Currently it is around 8e8.
09:00 |
Tue Jun 4 00:04:39 2024, DR, EH, Run 31
|
Beam energy = 3 MeV
Horizontal beam position = 4.0 mm, vertical beam position = 0.0 mm.
Beam intensity at inj ~ 2.5e7 |
Thu May 29 14:39:52 2025, CB LB PMH, Run 31 9x
|
15:40
Waiting for Serge to come in to change beam energy.
Remaining at the same beam energy and settings as before, except RIGHT arm now moving. |
Wed May 28 16:40:48 2025, EH, SN, LB, OF, EBM, CB, Run 28/29/30 - 1.88 MeV/A 37x
|
We start a new run with real data taking condititon: beam is ok, target density is 1e12 cm-2, detectors are moving in-out periodically.
Cooler voltage setpoint 1066.6 V. Read value 1068 V. |
Wed Feb 14 14:59:13 2024, JM, CB, NP, ML, AG, AB, Run 27 -Beam on target optimisation
|
Run 27 Started to check optimsation of the beam - target overlap.
Beam intensity at injection is roughly 1e7 particles
Target density apporx 4.2e11 atoms/cm2 and stable. |
Mon Jun 3 11:46:07 2024, SD, SHB, JM, CN, EM, Run 27 12x
|
12:46 (attachments 1-4)
Run 27 started - Beam no target
Beam energy = 3 MeV |