Wed May 28 10:54:14 2025, LB, Run 27    
|
Run 27 running
28/05/2025
(ignore 26 - in-between run) |
Mon Jun 3 08:43:22 2024, SD, SHB, Run 26 8x
|
09:44
Run 26 started - Beam no target
Beam energy is being increased from 1.5 to 3 MeV |
Tue May 27 22:20:11 2025, CB, LB,PW, Run 25 - 1.99/2.02 MeV/A 27x
|
23:20
JM thinks we cannot see 7Be locus on run 24. Possibly the right arm cannot get close enough.
Stopped moving right arm |
Sun Jun 2 23:38:17 2024, JM, EM, Run 25 32x
|
00:38
Run 25 started - Beam on target
Beam energy = 1.5 MeV. |
Sun Jun 2 13:04:41 2024, JM, AG, CB, DR, Run 23 - vertical beam position and beam lifetime tests
|
14:05
Run 22 stopped. Run 23 started we will now adjust the vertical beam position to see if we observe the beam stripe seen in the last beamtime.
Current vertical beam position 0.0 mm. Horizontal beam position 7.0 mm. Coasting beam. |
Tue May 27 05:24:05 2025, LB,SN, L. Cs. P. J. W., Run 22, 23 - 1.95 MeV/A 8x
|
27/05/2025 ca. 6:00
We start a new run: beam is ok, target density ok, detectors are moving in-out periodically.
Cooler voltage setpoint 1105.7 V |
Sun Jun 2 08:47:01 2024, CB, AG, Run 22 - longer rung with 20 min storage    
|
09:47
12 seconds pre acc
200x cycles |
Sun Jun 2 06:41:00 2024, CB, AG, Run 21 - tests 10x
|
07:41
Switching to bunched beam to check D vs H content.
8:24 |
Mon May 26 18:37:17 2025, LC, AG, LB, SN, Run 21 12x
|
Run 21 running
26/05/2025 19:42 p.m.
We start a new run with real data taking condititon: beam is ok, target density is 1.1e12 cm-2, detectors are moving in-out periodically. |
Sat Jun 1 21:56:17 2024, JM, EM, EM, TY, CB, AG, Run 20 18x
|
22:56
Run 20 started - beam on target
Beam energy is 1.5 MeV. Horizontal beam position = 7.0 mm, vertical beam position = 0.0 mm. |
Tue May 28 12:38:31 2024, TD, JM, CB, Run 2 - Alpha background run    
|
13.35 FEE64 temperatures OK - attachment 1
|
Sat Jun 1 07:16:15 2024, CB, AB, EM, JM, Run 19 - beam target overlap 19x
|
Morning shift
08:16 - as run 18, target off
9:00 Increased storage time to 5 minutes. Aquired data after initial beam loss. Attach 1 &2. Far less H2+ vs D. |
Sat Feb 10 17:05:13 2024, TD, Run 15 - background 20x
|
17.55 DAQ continues G22-86/R15_11
alpha background
|
Sat Feb 10 10:00:44 2024, AR RSS JM CB, Run 13, 14 23x
|
System checks: all ok
Attatchment 1: Rates ok
Attatchment 2: Temperatures ok |
Fri May 31 19:12:01 2024, CB, EM, Run 13 - test with beam  
|
20:00
The beam is set at the correct energy, operators cross-checked it again. What we see at 750 is due to the molecular beam. The operotors
are trying to optimize and get rid of this in the next 30min. |
Fri May 31 06:01:55 2024, JM, TY, PW, EM, CB, Run 12 - beam on target 12x
|
07:00
Run 12 started. D+ beam is incident on the target at 1.5 MeV
Beam intensity in the ring is ~4e7 particles |
Thu May 30 13:31:01 2024, JM, CB, PW, YL, Run 11 - beam on target overlap   
|
14:30
Run 11 started. D+ beam in the ring at 1.5 MeV.
No target at the moment. Valves to the interaction chamber will soon be opened. |
Wed Jun 19 12:08:34 2024, CB + various, Run 101-105
|
Run 101: no target. See ELOG entry by TD.
Run 102: ??
Run 103: ?? |
Thu May 30 09:30:33 2024, CB, PW, YL, TD, Run 10 13x
|
10:30
Merger OK, Tape server OK
ADC data item statistics looks as before. OK |
Thu Dec 8 14:41:19 2022, PJCS, Results of tests on AIDA PSU in DL T9 8x
|
We opened one up and soldered a co-ax cable to one of the +6v power contacts at the output of the filter board.
Connecting this to a 'scope we observed a level of +/- 5mv noise with no FEE connected.
Connecting one FEE made little difference. |