Entry  Wed May 28 10:54:14 2025, LB, Run 27 Screenshot_from_2025-05-28_15-45-13.pngScreenshot_from_2025-05-28_15-46-07.pngScreenshot_from_2025-05-28_15-48-27.pngScreenshot_from_2025-05-28_15-48-38.pngScreenshot_from_2025-05-28_15-49-09.png
Run 27 running

28/05/2025

(ignore 26 - in-between run)
Entry  Mon Jun 3 08:43:22 2024, SD, SHB, Run 26 8x
09:44

Run 26 started - Beam no target

Beam energy is being increased from 1.5 to 3 MeV
Entry  Tue May 27 22:20:11 2025, CB, LB,PW, Run 25 - 1.99/2.02 MeV/A 27x
23:20

JM thinks we cannot see 7Be locus on run 24. Possibly the right arm cannot get close enough.

Stopped moving right arm
Entry  Sun Jun 2 23:38:17 2024, JM, EM, Run 25  32x
00:38

Run 25 started - Beam on target

Beam energy = 1.5 MeV.
Entry  Sun Jun 2 13:04:41 2024, JM, AG, CB, DR, Run 23 - vertical beam position and beam lifetime tests Screenshot_from_2024-06-02_14-04-55.png
14:05

Run 22 stopped. Run 23 started we will now adjust the vertical beam position to see if we observe the beam stripe seen in the last beamtime.

Current vertical beam position 0.0 mm. Horizontal beam position 7.0 mm. Coasting beam.
Entry  Tue May 27 05:24:05 2025, LB,SN, L. Cs. P. J. W., Run 22, 23 - 1.95 MeV/A 8x
27/05/2025 ca. 6:00

We start a new run: beam is ok, target density ok, detectors are moving in-out periodically.

Cooler voltage setpoint  1105.7 V
Entry  Sun Jun 2 08:47:01 2024, CB, AG, Run 22 - longer rung with 20 min storage Screenshot_from_2024-06-02_09-47-53.pngScreenshot_from_2024-06-02_09-48-06.pngScreenshot_from_2024-06-02_11-21-59.pngScreenshot_from_2024-06-02_11-22-27.pngScreenshot_from_2024-06-02_13-02-31.png
09:47

12 seconds pre acc

200x cycles
Entry  Sun Jun 2 06:41:00 2024, CB, AG, Run 21 - tests 10x
07:41

Switching to bunched beam to check D vs H content.

8:24
Entry  Mon May 26 18:37:17 2025, LC, AG, LB, SN, Run 21 12x
Run 21 running

26/05/2025 19:42 p.m.

We start a new run with real data taking condititon: beam is ok, target density is 1.1e12 cm-2, detectors are moving in-out periodically.
Entry  Sat Jun 1 21:56:17 2024, JM, EM, EM, TY, CB, AG, Run 20 18x
22:56

Run 20 started - beam on target

Beam energy is 1.5 MeV. Horizontal beam position = 7.0 mm, vertical beam position = 0.0 mm.
Entry  Tue May 28 12:38:31 2024, TD, JM, CB, Run 2 - Alpha background run Screenshot_from_2024-05-28_13-35-03.pngScreenshot_from_2024-05-28_13-34-30.pngScreenshot_from_2024-05-28_13-33-19.pngScreenshot_from_2024-05-28_13-36-30.pngScreenshot_from_2024-05-28_13-37-16.png

13.35 FEE64 temperatures OK - attachment 1
Entry  Sat Jun 1 07:16:15 2024, CB, AB, EM, JM, Run 19 - beam target overlap 19x
Morning shift

08:16 - as run 18, target off

9:00 Increased storage time to 5 minutes. Aquired data after initial beam loss. Attach 1 &2. Far less H2+ vs D.
Entry  Sat Feb 10 17:05:13 2024, TD, Run 15 - background 20x

17.55 DAQ continues G22-86/R15_11
      alpha background
Entry  Sat Feb 10 10:00:44 2024, AR RSS JM CB, Run 13, 14 23x
System checks: all ok

Attatchment 1: Rates ok

Attatchment 2: Temperatures ok
Entry  Fri May 31 19:12:01 2024, CB, EM, Run 13 - test with beam Screenshot_from_2024-05-31_20-13-46.pngScreenshot_from_2024-05-31_20-27-58.pngScreenshot_from_2024-05-31_20-32-59.png
20:00

The beam is set at the correct energy, operators cross-checked it again. What we see  at 750 is due to the molecular beam.  The operotors
are trying to optimize and get rid of this in the next 30min.
Entry  Fri May 31 06:01:55 2024, JM, TY, PW, EM, CB, Run 12 - beam on target 12x
07:00

Run 12 started. D+ beam is incident on the target at 1.5 MeV

Beam intensity in the ring is ~4e7 particles
Entry  Thu May 30 13:31:01 2024, JM, CB, PW, YL, Run 11 - beam on target overlap Screenshot_from_2024-05-30_14-33-19.pngScreenshot_from_2024-05-31_02-09-35.pngScreenshot_from_2024-05-31_06-57-12.png20240531_073828.jpg
14:30

Run 11 started. D+ beam in the ring at 1.5 MeV.

No target at the moment. Valves to the interaction chamber will soon be opened.
Entry  Wed Jun 19 12:08:34 2024, CB + various, Run 101-105 
Run 101: no target. See ELOG entry by TD.

Run 102: ??

Run 103: ??
Entry  Thu May 30 09:30:33 2024, CB, PW, YL, TD, Run 10 13x
10:30

Merger OK, Tape server OK

ADC data item statistics looks as before. OK
Entry  Thu Dec 8 14:41:19 2022, PJCS, Results of tests on AIDA PSU in DL T9 8x
We opened one up and soldered a co-ax cable to one of the +6v power contacts at the output of the filter board.

Connecting this to a 'scope we observed a level of +/- 5mv noise with no FEE connected.

Connecting one FEE made little difference.