| ID |
Date |
Author |
Subject |
Text |
 |
|
729
|
Tue Jun 10 09:44:20 2025 |
JG | MBS not running for a week | The MBS daq was not writing data since June
2. 22:39 (run_0035.lmd)
The reason is that
the rfio server was running on atppc025 which |
| |
730
|
Tue Jun 10 09:44:30 2025 |
JG | MBS not running for a week | The MBS daq was not writing data since June
2. 22:39 (run_0035.lmd)
The reason is that
the rfio server was running on atppc025 which |
| |
731
|
Tue Jun 10 09:44:33 2025 |
JG | MBS not running for a week | The MBS daq was not writing data since
June 2. 22:39 (run_0035.lmd)
This means, no detector and target |
| |
748
|
Mon Jun 16 08:17:41 2025 |
JG | D2 consumption | The current bottle of D2 was installed
on friday 06.06. at around 12:00. I assume
we started at 200 bar. |
| |
509
|
Tue Feb 13 08:34:44 2024 |
Hw, JM, AR, CB, NP, AB, RSS | Status of DAQ - beam overlap | Check the status of the DAQ system, with
Tom. All correct. See attachments:
1 Leackage currents |
10x | |
525
|
Sun Feb 18 07:53:51 2024 |
HW AG | Run 40 Morning Shift | 08:57 Doing morning check. Checked the
leakage currents, all ok. Attachment 1
Tempritures of, attchment 2 |
27x | |
245
|
Tue Feb 22 21:57:13 2022 |
George, Jordan | Current status | 23:53
Temperatures OK
System checks OK - white rabbit |
   | |
278
|
Fri Feb 25 06:28:12 2022 |
George, Esther | Current Status | 07:30
Some signals on the beam monitor,
seems they are optimising it. |
 | |
279
|
Fri Feb 25 06:57:09 2022 |
George, Esther | Current status | 08:00
Beam seems to be back
Intensity ~7.8e7 |
| |
280
|
Fri Feb 25 08:14:47 2022 |
George, Esther | Current status | 9:14
Beam intensity around ~7.5e7
Pressures OK |
| |
281
|
Fri Feb 25 09:58:08 2022 |
GHC, CB, ML, EM | Current status | 10:58
Started new run: 77
|
| |
497
|
Wed Feb 7 13:50:20 2024 |
Elena Hanu, Carlo Bruno, Michael Lestinsky | Afternoon shift | 14:50
Temperature, Statistics fine (see |
  | |
721
|
Thu Jun 5 16:54:18 2025 |
EW, ST, CB | Run 52 - 0.3 MeV/A | Run 52 started at 17:53. Everything is
running again. We started at 3E12 at/cm2
D+ beam deuterium target. D+ beam |
14x | |
710
|
Sun Jun 1 15:33:50 2025 |
EW, JM, CB | Run 40 | 16:30
Run 40 started.
D+ beam deuterium target. D+ beam |
10x | |
716
|
Tue Jun 3 11:16:07 2025 |
EW, EM, JM | Run 47, beam only background | Run 47 started. Target cooling down after
water cooler failure, beam only background
D+ beam deuterium target. D+ beam |
 | |
747
|
Sun Jun 15 10:46:35 2025 |
EW, EM, AR, AB, CB, JG, AK | Run 81 | 11:45 New run started - run 81, same settings
as previous runs (75, 76 etc)
ROOT histograms NOT zeroed |
30x | |
746
|
Sun Jun 15 07:01:37 2025 |
EW, EM | Run 80 | 08:00 New run started - run 80
Run whilst they are optimising
the beam after losing it, everything else |
    | |
738
|
Wed Jun 11 10:13:42 2025 |
EW, CB, PJW, AR, JM | Run 67 | As run 66, optimisation of beam completed
DSSD4 now working and thresholds
to 0x30 (480keV), switched to LEC |
14x | |
719
|
Wed Jun 4 10:44:36 2025 |
EW, CB, JM, OF, JG, ST | Run 50 - 0.35 MeV/A | 11:30
Run 50 started.
D+ beam deuterium target. D+ beam |
13x | |
733
|
Tue Jun 10 13:29:23 2025 |
EW, CB, JM | Thresholds changed | Experimented with slow comparator thresholds
as we go down to lower beam energies
Checked deadlayer loses with SRIM, |
   |
|