Entry  Tue Jun 10 09:44:20 2025, JG, MBS not running for a week 
The MBS daq was not writing data since June 2. 22:39 (run_0035.lmd)
The reason is that the rfio server was running on atppc025 which crashed at that time.

We
resumed running MBS now at 10.06. ca. 10:35. (run_0036.lmd).
Entry  Tue Jun 10 09:44:30 2025, JG, MBS not running for a week 
The MBS daq was not writing data since June 2. 22:39 (run_0035.lmd)
The reason is that the rfio server was running on atppc025 which crashed at that time.

We
resumed running MBS now at 10.06. ca. 10:35. (run_0036.lmd).
Entry  Tue Jun 10 09:44:33 2025, JG, MBS not running for a week 
The MBS daq was not writing data since June 2. 22:39 (run_0035.lmd)

This means, no detector and target timing is available for this period.

The reason is that the rfio server was running on atppc025, which crashed at that time.
Entry  Mon Jun 16 08:17:41 2025, JG, D2 consumption 
The current bottle of D2 was installed on friday 06.06. at around 12:00. I assume we started at 200 bar.

Right now we have 50 bar remaining in this bottle (16.06. at 8:00).

This is an average consumption of ~15 bar/day
Entry  Tue Feb 13 08:34:44 2024, Hw, JM, AR, CB, NP, AB, RSS, Status of DAQ - beam overlap 10x
Check the status of the DAQ system, with Tom. All correct. See attachments:

1 Leackage currents

2 ADC data item stats
Entry  Sun Feb 18 07:53:51 2024, HW AG, Run 40 Morning Shift 27x
08:57 Doing morning check. Checked the leakage currents, all ok. Attachment 1

Tempritures of, attchment 2

System wide check, all correct.
Entry  Tue Feb 22 21:57:13 2022, George, Jordan, Current status 2022-02-22_23-53-38-lowenergy-xytotal.png2022-02-22_23-50-45-Ex-rate-hist.png2022-02-22_23-49-20-Ex-total-hist.png20220223_002946.jpg
23:53

Temperatures OK

System checks OK - white rabbit fail diff ~ 80
Entry  Fri Feb 25 06:28:12 2022, George, Esther, Current Status 2022-02-25_07-33-44exRate.png2022-02-25_07-35-11xyTotal.png
07:30
Some signals on the beam monitor, seems they are optimising it.

System Check OK
Entry  Fri Feb 25 06:57:09 2022, George, Esther, Current status 2022-02-25_08-03-21leakage.png
08:00
Beam seems to be back
Intensity ~7.8e7
Entry  Fri Feb 25 08:14:47 2022, George, Esther, Current status 
9:14
Beam intensity around ~7.5e7

Pressures OK
Entry  Fri Feb 25 09:58:08 2022, GHC, CB, ML, EM, Current status 
10:58
Started new run: 77
Entry  Wed Feb 7 13:50:20 2024, Elena Hanu, Carlo Bruno, Michael Lestinsky, Afternoon shift Screenshot_from_2024-02-07_14-53-36.pngScreenshot_from_2024-02-07_14-56-37.pngScreenshot_from_2024-02-07_14-51-21.png
14:50

 

Temperature, Statistics fine (see screenshots).
Entry  Thu Jun 5 16:54:18 2025, EW, ST, CB, Run 52 - 0.3 MeV/A 14x
Run 52 started at 17:53. Everything is running again. We started at 3E12 at/cm2

D+ beam deuterium target. D+ beam energy is now 0.3 MeV/u. (beam calc calculation is 0.3067 MeV/u).

All four detectors positioned fully out and stationary and also detector #4 is running again.
Entry  Sun Jun 1 15:33:50 2025, EW, JM, CB, Run 40 10x
16:30

Run 40 started.

D+ beam deuterium target. D+ beam energy is 0.75 MeV/u. (beam calc calculation is 0.7619 MeV/u)
Entry  Tue Jun 3 11:16:07 2025, EW, EM, JM, Run 47, beam only background Screenshot_from_2025-06-03_12-20-25.pngScreenshot_from_2025-06-03_12-19-36.png
Run 47 started. Target cooling down after water cooler failure, beam only background

D+ beam deuterium target. D+ beam energy is 0.5 MeV/u. (beam calc calculation is 0.5143 MeV/u). See previous entry for beamcalc.

All four detectors positioned fully out and stationary.
Entry  Sun Jun 15 10:46:35 2025, EW, EM, AR, AB, CB, JG, AK, Run 81 30x
11:45 New run started - run 81, same settings as previous runs (75, 76 etc)

ROOT histograms NOT zeroed

Beam at 2.5e8, target density at 3e12
Entry  Sun Jun 15 07:01:37 2025, EW, EM, Run 80 Screenshot_from_2025-06-15_08-09-05.pngScreenshot_from_2025-06-15_08-09-00.pngScreenshot_from_2025-06-15_08-08-05.pngScreenshot_from_2025-06-15_08-07-56.pngScreenshot_from_2025-06-15_09-55-36.png
08:00 New run started - run 80

Run whilst they are optimising the beam after losing it, everything else same as previous runs

ROOT histograms NOT zeroed
Entry  Wed Jun 11 10:13:42 2025, EW, CB, PJW, AR, JM, Run 67 14x
As run 66, optimisation of beam completed

DSSD4 now working and thresholds to 0x30 (480keV), switched to LEC

Tape service at 1.7MB/s
Entry  Wed Jun 4 10:44:36 2025, EW, CB, JM, OF, JG, ST, Run 50 - 0.35 MeV/A 13x
11:30

Run 50 started.

D+ beam deuterium target. D+ beam energy is 0.35 MeV/u. (beam calc calculation is 0.3577 MeV/u)
Entry  Tue Jun 10 13:29:23 2025, EW, CB, JM, Thresholds changed  Screenshot_from_2025-06-10_14-35-07.pngScreenshot_from_2025-06-10_14-34-59.pngScreenshot_from_2025-06-10_14-34-49.pngScreenshot_from_2025-06-10_14-34-17.png
Experimented with slow comparator thresholds as we go down to lower beam energies

Checked deadlayer loses with SRIM, expected ruthford energies are as follows:

150keV/u -> 230keV