AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 27 of 38  ELOG logo
Entry  Tue Feb 22 16:09:08 2022, David, Yury, Current status 12x
Merger, Tape server (WS3) checks: DONE, writing ~1 1273kB/s, refreshing is fine

Leakage current (WS4): 3.46 uA , stable current

DAQ (WS2): temperature checked, 
Entry  Tue Feb 22 14:32:04 2022, David, Yury, Current status 12x
Merger, Tape server (WS3) checks: DONE, writing ~1 MB/s, refreshing is fine

Leakage current (WS4): 3.48 uA , stable current

DAQ (WS2): temperature checked, 
Entry  Tue Feb 22 12:23:23 2022, CB, Slow comparator thresholds lowered - test run 
13:20 Stopped run.

Slow comp thresh 0x64 -> 0x32 on all FEEs

Checkload x2
Entry  Tue Feb 22 12:01:46 2022, RSS, OF, ML, CB, Beam OFF, Target ON Run 54  9x
01:00

Beam optimisation since 09:25.

Target ON and open to the ring
Entry  Tue Feb 22 10:30:00 2022, RSS, OF, ML, Beam OFF, Target ON Run 54  10x
11:30

Beam optimisation. No beam since 09:25.

Target ON and open to the ring
Entry  Tue Feb 22 10:06:50 2022, RSS, OF, ML, PMT channel 
YR00DA1ZB is the channel for PMT rate.
Entry  Tue Feb 22 09:10:48 2022, OH, Analysis of R54_14 R54_14_analyser.txt
Results of the fortran analyser programs for R54_14

No timewarps observed in the data
Entry  Tue Feb 22 08:31:25 2022, RSS, OF, ML, Beam OFF, Target ON Run 54  10x
09:30

Beam optimisation. No beam since 09:25.

Target ON and open to the ring
Entry  Tue Feb 22 07:27:28 2022, RSS, OF, ML, Beam ON, Target ON Run 54  10x
08:30

Beam ON ~1.0E7 pps

Target ON and open to the ring
Entry  Tue Feb 22 06:30:09 2022, RSS, OF, Beam ON, Target ON Run 54  10x
07:30

Beam ON ~8.0E6 pps

Target ON and open to the ring
Entry  Tue Feb 22 05:47:18 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54 - 2 events at 10MeV! 11x
06:47

Beam ON ~2.0E6 pps, still fluctates between 1e6 and 6e6 (like a step function)

Target ON and open to the ring
Entry  Tue Feb 22 05:12:38 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54  11x
06:00

Beam ON ~1.5E6 pps, still fluctates between 1e6 and 6e6 (like a step function)

Target ON and open to the ring
Entry  Tue Feb 22 04:09:28 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54 - first event at 10MeV ! 11x
05:00

Beam ON ~2E6 pps, still fluctates between 2e6 and 6e6 (like a step function)

Target ON and open to the ring
Entry  Tue Feb 22 03:05:06 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54  9x
04:00

Beam ON ~5.5E6 pps, but it fluctates between 2e6 and 6e6 (like a step function) in about each 5-10min

Target ON and open to the ring
Entry  Tue Feb 22 02:02:11 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54  10x
03:00

Beam ON ~7E6 pps

Target ON and open to the ring
Entry  Tue Feb 22 00:32:35 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54  2022-02-22_01-38-53-Ex-histogram.png2022-02-22_01-38-17-XYtotal.png
01:30

Beam ON ~6E6 pps

Target ON and open to the ring
Entry  Mon Feb 21 21:04:08 2022, SHB, JM, CB, OH (remotely), Schottky RF view from the beam inside pio-2022.02.21.21.54.46.895.PNG
 
Entry  Mon Feb 21 20:56:51 2022, SHB, JM, CB, OH (remotely), DAQ connection for ion current cry.jpg
signals from ICT and CRYRADIO are now connected to AIDA2 and AIDA5 respectively. ICT is set to factor 200 and CRYRADIO to 40 for now.

 

(AIDA3 --> electron cooler)
Entry  Mon Feb 21 18:03:58 2022, SHB, JM, CB, OH (remotely), Info: signals on ion intensity for experiment 
Currently 4 possibilities to have a look at the beam, all of them are OK to check whether there is beam or not, but some of them are better for checking
absolute values.
- Schottky RF signal
Entry  Mon Feb 21 17:26:19 2022, JM, CB, SHB, OH (remotely), Beam ON run 53 9x
21/2/22 16:00

Call from main control room, beam is ON, probably has been for several hours judging by rate on xy total plot.

Changes made to online monitoring code by OH, include setting to only 1 DSSD, correct offsets from the pulser walkthrough, offline analysis capabilities
ELOG V3.1.4-unknown