AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 27 of 38  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Tue Feb 22 18:23:02 2022, David. Yury, Vacuum problem 

At 19:10 the vacuum has increased suddenly everywhere in the ring, roughly a factor 1.5.

Entry  Tue Feb 22 17:32:38 2022, David, Current status 12x

Michael is modifying the settings of the electron cooler --> changed beam from bunched to coasting

Merger, Tape server (WS3) checks: DONE, writing ~1036 kB/s, refreshing is fine

Leakage current (WS4): 3.46 uA , stable current

DAQ (WS2): temperature checked,

     - clock status:

Clock status test result: Passed 5, Failed 0

Understand status as follows
Status bit 3 : firmware PLL that creates clocks from external clock not locked
Status bit 2 : always logic '1'
Status bit 1 : LMK3200(2) PLL and clock distribution chip not locked to external clock
Status bit 0 : LMK3200(1) PLL and clock distribution chip not locked to external clock
If all these bits are not set then the operation of the firmware is unreliable

     -  adc calibration:

Calibration test result: Passed 5, Failed 0

If any modules fail calibration , check the clock status and open the FADC Align and Control browser page to rerun calibration for that module

   - white rabbit check:

     Base         Current     Difference
aida01 fault      0xc228 :      0xc274 :      76  
aida02 fault      0x5e98 :      0x5ee0 :      72  
aida03 fault      0x92d3 :      0x931f :      76  
aida04 fault      0x7a92 :      0x7ade :      76  
aida05 fault      0xedc0 :      0xedcc :      12  
White Rabbit error counter test result: Passed 0, Failed 5

Understand the status reports as follows:-
Status bit 3 : White Rabbit decoder detected an error in the received data
Status bit 2 : Firmware registered WR error, no reload of Timestamp
Status bit 0 : White Rabbit decoder reports uncertain of Timestamp information from WR

 

DAQ (WS2): everything ok

Online monitoring (WS 5): done;

Entry  Tue Feb 22 16:09:08 2022, David, Yury, Current status 12x

Merger, Tape server (WS3) checks: DONE, writing ~1 1273kB/s, refreshing is fine

Leakage current (WS4): 3.46 uA , stable current

DAQ (WS2): temperature checked,

     - clock status:

Clock status test result: Passed 5, Failed 0

Understand status as follows
Status bit 3 : firmware PLL that creates clocks from external clock not locked
Status bit 2 : always logic '1'
Status bit 1 : LMK3200(2) PLL and clock distribution chip not locked to external clock
Status bit 0 : LMK3200(1) PLL and clock distribution chip not locked to external clock
If all these bits are not set then the operation of the firmware is unreliable

     -  adc calibration:

Calibration test result: Passed 5, Failed 0

If any modules fail calibration , check the clock status and open the FADC Align and Control browser page to rerun calibration for that module

   - white rabbit check:

         Base         Current     Difference
aida01 fault      0xc228 :      0xc272 :      74  
aida02 fault      0x5e98 :      0x5edf :      71  
aida03 fault      0x92d3 :      0x931d :      74  
aida04 fault      0x7a92 :      0x7adc :      74  
aida05 fault      0xedc0 :      0xedcc :      12  
White Rabbit error counter test result: Passed 0, Failed 5

Understand the status reports as follows:-
Status bit 3 : White Rabbit decoder detected an error in the received data
Status bit 2 : Firmware registered WR error, no reload of Timestamp
Status bit 0 : White Rabbit decoder reports uncertain of Timestamp information from WR

DAQ (WS2): everything ok

Online monitoring (WS 5): done

Entry  Tue Feb 22 14:32:04 2022, David, Yury, Current status 12x

Merger, Tape server (WS3) checks: DONE, writing ~1 MB/s, refreshing is fine

Leakage current (WS4): 3.48 uA , stable current

DAQ (WS2): temperature checked,

     - clock status:
Clock status test result: Passed 5, Failed 0

Understand status as follows
Status bit 3 : firmware PLL that creates clocks from external clock not locked
Status bit 2 : always logic '1'
Status bit 1 : LMK3200(2) PLL and clock distribution chip not locked to external clock
Status bit 0 : LMK3200(1) PLL and clock distribution chip not locked to external clock
If all these bits are not set then the operation of the firmware is unreliable

     -  adc calibration:
Calibration test result: Passed 5, Failed 0

If any modules fail calibration , check the clock status and open the FADC Align and Control browser page to rerun calibration for that module

   - white rabbit check:

         Base         Current     Difference
aida01 fault      0xc228 :      0xc272 :      74  
aida02 fault      0x5e98 :      0x5edf :      71  
aida03 fault      0x92d3 :      0x931d :      74  
aida04 fault      0x7a92 :      0x7adc :      74  
aida05 fault      0xedc0 :      0xedcc :      12  
White Rabbit error counter test result: Passed 0, Failed 5

Understand the status reports as follows:-
Status bit 3 : White Rabbit decoder detected an error in the received data
Status bit 2 : Firmware registered WR error, no reload of Timestamp
Status bit 0 : White Rabbit decoder reports uncertain of Timestamp information from WR

DAQ (WS2): everything ok

Online monitoring (WS 5): done; first shots with something?

 

 

Entry  Tue Feb 22 12:23:23 2022, CB, Slow comparator thresholds lowered - test run 

13:20 Stopped run.

Slow comp thresh 0x64 -> 0x32 on all FEEs

Checkload x2

 

New run - R55

Restarted Data Spy code

Zerod histograms

Data rate acceptable.

Dead channels seem to come back online

 

Please check for deadtime/idle time once we collect enough stats.

Entry  Tue Feb 22 12:01:46 2022, RSS, OF, ML, CB, Beam OFF, Target ON Run 54  9x

01:00

Beam optimisation since 09:25.

Target ON and open to the ring

YR09xxx ETarget ~1.9e-10 (saturated)

Target E4 inlet pressure ~8.8E-9 mbar

Dump S3 ~ 6.8E-10 mbar

Nozzle temperature 150 K

Run 54 started, monitoring code restarted.

 

Beam optimization will be done until 3 pm and will be then give for the experiment.

Entry  Tue Feb 22 10:30:00 2022, RSS, OF, ML, Beam OFF, Target ON Run 54  10x

11:30

Beam optimisation. No beam since 09:25.

Target ON and open to the ring

YR09xxx ETarget ~1.9e-10 (saturated)

Target E4 inlet pressure ~8.8E-9 mbar

Dump S3 ~ 6.8E-10 mbar

Nozzle temperature 150 K

Run 54 started, monitoring code restarted.

 

Beam optimization will be done until 3 pm and will be then give for the experiment.

Entry  Tue Feb 22 10:06:50 2022, RSS, OF, ML, PMT channel 

YR00DA1ZB is the channel for PMT rate.

Entry  Tue Feb 22 09:10:48 2022, OH, Analysis of R54_14 R54_14_analyser.txt
Results of the fortran analyser programs for R54_14

No timewarps observed in the data
No dead time observed either.
Lots of idle time but expected with high thresholds and low noise
Entry  Tue Feb 22 08:31:25 2022, RSS, OF, ML, Beam OFF, Target ON Run 54  10x

09:30

Beam optimisation. No beam since 09:25.

Target ON and open to the ring

YR09xxx ETarget ~1.9e-10 (saturated)

Target E4 inlet pressure ~8.8E-9 mbar

Dump S3 ~ 6.8E-10 mbar

Nozzle temperature 150 K

Run 54 started, monitoring code restarted.

 

FH and ML are optimising the beam.

Entry  Tue Feb 22 07:27:28 2022, RSS, OF, ML, Beam ON, Target ON Run 54  10x

08:30

Beam ON ~1.0E7 pps

Target ON and open to the ring

YR09xxx ETarget ~1.9e-10 (saturated)

Target E4 inlet pressure ~8.8E-9 mbar

Dump S3 ~ 6.8E-10 mbar

Nozzle temperature 150 K

Run 54 started, monitoring code restarted.

 

FH and ML are optimising the beam.

Entry  Tue Feb 22 06:30:09 2022, RSS, OF, Beam ON, Target ON Run 54  10x

07:30

Beam ON ~8.0E6 pps

Target ON and open to the ring

YR09xxx ETarget ~1.9e-10 (saturated)

Target E4 inlet pressure ~8.8E-9 mbar

Dump S3 ~ 6.8E-10 mbar

Nozzle temperature 150 K

Run 54 started, monitoring code restarted.

 

08:00 The beam is electron cooled by FH and the orbit of the beam is slighty changed.

Entry  Tue Feb 22 05:47:18 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54 - 2 events at 10MeV! 11x

06:47

Beam ON ~2.0E6 pps, still fluctates between 1e6 and 6e6 (like a step function)

Target ON and open to the ring

YR09xxx ETarget ~1.8e-10 (saturated)

Target E4 inlet pressure 8.0E-9 mbar

Dump S3 ~ 6.6E-10 mbar

Nozzle temperature 150 K

Run 54 started, monitoring code restarted.

Entry  Tue Feb 22 05:12:38 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54  11x

06:00

Beam ON ~1.5E6 pps, still fluctates between 1e6 and 6e6 (like a step function)

Target ON and open to the ring

YR09xxx ETarget ~1.8e-10

Target E4 inlet pressure 8.2E-9 mbar

Dump S3 ~ 6.5E-10 mbar

Nozzle temperature 150 K

Run 54 started, monitoring code restarted.

Entry  Tue Feb 22 04:09:28 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54 - first event at 10MeV ! 11x

05:00

Beam ON ~2E6 pps, still fluctates between 2e6 and 6e6 (like a step function)

Target ON and open to the ring

YR09xxx ETarget ~1.8e-10

Target E4 inlet pressure 8.3E-9 mbar

Dump S3 ~ 6.8E-10 mbar

Nozzle temperature 150 K

Run 54 started, monitoring code restarted.

Entry  Tue Feb 22 03:05:06 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54  9x

04:00

Beam ON ~5.5E6 pps, but it fluctates between 2e6 and 6e6 (like a step function) in about each 5-10min

Target ON and open to the ring

YR09xxx ETarget ~1.8e-10

Target E4 inlet pressure 8.4E-9 mbar

Dump S3 ~ 7.0E-10 mbar

Nozzle temperature 150 K

Run 54 started, monitoring code restarted.

Entry  Tue Feb 22 02:02:11 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54  10x

03:00

Beam ON ~7E6 pps

Target ON and open to the ring

Target E4 inlet pressure 8.5E-9 mbar

Dump S3 ~ 7.3E-10 mbar

Nozzle temperature 150 K

Run 54 started, monitoring code restarted.

Entry  Tue Feb 22 00:32:35 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54  2022-02-22_01-38-53-Ex-histogram.png2022-02-22_01-38-17-XYtotal.png

01:30

Beam ON ~6E6 pps

Target ON and open to the ring

Target E4 inlet pressure 8.12E-9 mbar

Dump S3 ~ 7E-10 mbar

Nozzle temperature 150 K

1:40

Run 54 started, monitoring code restarted.

Entry  Mon Feb 21 21:04:08 2022, SHB, JM, CB, OH (remotely), Schottky RF view from the beam inside pio-2022.02.21.21.54.46.895.PNG
 
Entry  Mon Feb 21 20:56:51 2022, SHB, JM, CB, OH (remotely), DAQ connection for ion current cry.jpg

signals from ICT and CRYRADIO are now connected to AIDA2 and AIDA5 respectively. ICT is set to factor 200 and CRYRADIO to 40 for now.

 

(AIDA3 --> electron cooler)

 

ELOG V3.1.3-7933898