AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 27 of 38  ELOG logo
ID Date Authordown Subject Text Attachments
  729   Tue Jun 10 09:44:20 2025 JGMBS not running for a weekThe MBS daq was not writing data since June
2. 22:39 (run_0035.lmd)
The reason is that
the rfio server was running on atppc025 which
  
  730   Tue Jun 10 09:44:30 2025 JGMBS not running for a weekThe MBS daq was not writing data since June
2. 22:39 (run_0035.lmd)
The reason is that
the rfio server was running on atppc025 which
  
  731   Tue Jun 10 09:44:33 2025 JGMBS not running for a weekThe MBS daq was not writing data since
June 2. 22:39 (run_0035.lmd)

This means, no detector and target
  
  748   Mon Jun 16 08:17:41 2025 JGD2 consumptionThe current bottle of D2 was installed
on friday 06.06. at around 12:00. I assume
we started at 200 bar.
  
  509   Tue Feb 13 08:34:44 2024 Hw, JM, AR, CB, NP, AB, RSSStatus of DAQ - beam overlapCheck the status of the DAQ system, with
Tom. All correct. See attachments:

1 Leackage currents
 10x 
  525   Sun Feb 18 07:53:51 2024 HW AGRun 40 Morning Shift08:57 Doing morning check. Checked the
leakage currents, all ok. Attachment 1

Tempritures of, attchment 2
 27x 
  245   Tue Feb 22 21:57:13 2022 George, JordanCurrent status23:53

Temperatures OK

System checks OK - white rabbit
 2022-02-22_23-53-38-lowenergy-xytotal.png2022-02-22_23-50-45-Ex-rate-hist.png2022-02-22_23-49-20-Ex-total-hist.png20220223_002946.jpg 
  278   Fri Feb 25 06:28:12 2022 George, EstherCurrent Status07:30
Some signals on the beam monitor,
seems they are optimising it.
 2022-02-25_07-33-44exRate.png2022-02-25_07-35-11xyTotal.png 
  279   Fri Feb 25 06:57:09 2022 George, EstherCurrent status08:00
Beam seems to be back
Intensity ~7.8e7
 2022-02-25_08-03-21leakage.png 
  280   Fri Feb 25 08:14:47 2022 George, EstherCurrent status9:14
Beam intensity around ~7.5e7

Pressures OK
  
  281   Fri Feb 25 09:58:08 2022 GHC, CB, ML, EMCurrent status10:58
Started new run: 77
  
  497   Wed Feb 7 13:50:20 2024 Elena Hanu, Carlo Bruno, Michael LestinskyAfternoon shift14:50

 

Temperature, Statistics fine (see
 Screenshot_from_2024-02-07_14-53-36.pngScreenshot_from_2024-02-07_14-56-37.pngScreenshot_from_2024-02-07_14-51-21.png 
  721   Thu Jun 5 16:54:18 2025 EW, ST, CBRun 52 - 0.3 MeV/ARun 52 started at 17:53. Everything is
running again. We started at 3E12 at/cm2

D+ beam deuterium target. D+ beam
 14x 
  710   Sun Jun 1 15:33:50 2025 EW, JM, CBRun 4016:30

Run 40 started.

D+ beam deuterium target. D+ beam
 10x 
  716   Tue Jun 3 11:16:07 2025 EW, EM, JMRun 47, beam only backgroundRun 47 started. Target cooling down after
water cooler failure, beam only background

D+ beam deuterium target. D+ beam
 Screenshot_from_2025-06-03_12-20-25.pngScreenshot_from_2025-06-03_12-19-36.png 
  747   Sun Jun 15 10:46:35 2025 EW, EM, AR, AB, CB, JG, AKRun 8111:45 New run started - run 81, same settings
as previous runs (75, 76 etc)

ROOT histograms NOT zeroed
 30x 
  746   Sun Jun 15 07:01:37 2025 EW, EMRun 8008:00 New run started - run 80

Run whilst they are optimising
the beam after losing it, everything else
 Screenshot_from_2025-06-15_08-09-05.pngScreenshot_from_2025-06-15_08-09-00.pngScreenshot_from_2025-06-15_08-08-05.pngScreenshot_from_2025-06-15_08-07-56.pngScreenshot_from_2025-06-15_09-55-36.png 
  738   Wed Jun 11 10:13:42 2025 EW, CB, PJW, AR, JMRun 67As run 66, optimisation of beam completed

DSSD4 now working and thresholds
to 0x30 (480keV), switched to LEC
 14x 
  719   Wed Jun 4 10:44:36 2025 EW, CB, JM, OF, JG, STRun 50 - 0.35 MeV/A11:30

Run 50 started.

D+ beam deuterium target. D+ beam
 13x 
  733   Tue Jun 10 13:29:23 2025 EW, CB, JMThresholds changed Experimented with slow comparator thresholds
as we go down to lower beam energies

Checked deadlayer loses with SRIM,
 Screenshot_from_2025-06-10_14-35-07.pngScreenshot_from_2025-06-10_14-34-59.pngScreenshot_from_2025-06-10_14-34-49.pngScreenshot_from_2025-06-10_14-34-17.png 
ELOG V3.1.3-7933898