  382   Wed Nov 30 08:52:59 2022 AR TDWednesday 30 November

9:40

DSSD bias and leakage current values:

-99.99 V

-13.0960 uA

Pulsar peak widths (ch FWHM)

aida01 ~ 97

aida02 ~ 103

aida03 ~ 134

aida04 ~ 131

aida05 ~ 22

Pretty similar to what was found yesterday

 

15.30

Per Elog 375

Measured FEE64 voltages are as follows

@ISOL 4 AIDA PSU   @FEE64 aida05      nominal

(top-botttom)               (right-left)

+6.05V                        +5.26V                     +5V

+6.05V                        +5.26V                     +5V

+6.05V                        +5.26V                     +5V

-6.49V                         -6.26V                      -6V

+7.78V                        +7.46V                     +7V

 

Adjusted PowerStax PSU voltage pots of AIDA PSU ISOL 4

@ISOL 4 AIDA PSU   @FEE64 aida05      nominal

(top-botttom)               (right-left)

+5.79V                        +4.99V                     +5V

+5.79V                        +4.99V                     +5V

+5.79V                        +4.99V                     +5V

-6.23V                         -6.00V                      -6V

+7.32V                        +7.00V                     +7V

 

Attatchment 1-12 = BEFORE change

Attatchment 13+ = AFTER change

Pulsar peak widths (ch FWHM) AFTER CHANGE

aida01 ~ 100

aida02 ~ 96

aida03 ~ 130

aida04 ~ 130

aida05 ~ 22

Attachment 1: Screenshot_2022-11-30_at_10.11.36.png
Screenshot_2022-11-30_at_10.11.36.png
Attachment 2: Screenshot_2022-11-30_at_10.11.49.png
Screenshot_2022-11-30_at_10.11.49.png
Attachment 3: Screenshot_2022-11-30_at_10.12.21.png
Screenshot_2022-11-30_at_10.12.21.png
Attachment 4: Screenshot_2022-11-30_at_10.12.30.png
Screenshot_2022-11-30_at_10.12.30.png
Attachment 5: Screenshot_2022-11-30_at_10.12.36.png
Screenshot_2022-11-30_at_10.12.36.png
Attachment 6: Screenshot_2022-11-30_at_10.13.11.png
Screenshot_2022-11-30_at_10.13.11.png
Attachment 7: Screenshot_2022-11-30_at_10.13.18.png
Screenshot_2022-11-30_at_10.13.18.png
Attachment 8: Screenshot_2022-11-30_at_10.14.46.png
Screenshot_2022-11-30_at_10.14.46.png
Attachment 9: Screenshot_2022-11-30_at_10.15.14.png
Screenshot_2022-11-30_at_10.15.14.png
Attachment 10: Screenshot_2022-11-30_at_10.33.38.png
Screenshot_2022-11-30_at_10.33.38.png
Attachment 11: Screenshot_2022-11-30_at_10.34.34.png
Screenshot_2022-11-30_at_10.34.34.png
Attachment 12: Screenshot_2022-11-30_at_10.35.01.png
Screenshot_2022-11-30_at_10.35.01.png
Attachment 13: Screenshot_2022-11-30_at_15.13.50.png
Screenshot_2022-11-30_at_15.13.50.png
Attachment 14: Screenshot_2022-11-30_at_15.14.05.png
Screenshot_2022-11-30_at_15.14.05.png
Attachment 15: Screenshot_2022-11-30_at_15.14.35.png
Screenshot_2022-11-30_at_15.14.35.png
Attachment 16: Screenshot_2022-11-30_at_15.14.41.png
Screenshot_2022-11-30_at_15.14.41.png
Attachment 17: Screenshot_2022-11-30_at_15.14.48.png
Screenshot_2022-11-30_at_15.14.48.png
Attachment 18: Screenshot_2022-11-30_at_15.14.53.png
Screenshot_2022-11-30_at_15.14.53.png
Attachment 19: Screenshot_2022-11-30_at_15.15.00.png
Screenshot_2022-11-30_at_15.15.00.png
Attachment 20: Screenshot_2022-11-30_at_15.16.28.png
Screenshot_2022-11-30_at_15.16.28.png
Attachment 21: Screenshot_2022-11-30_at_15.16.38.png
Screenshot_2022-11-30_at_15.16.38.png
Attachment 22: Screenshot_2022-11-30_at_15.39.31.png
Screenshot_2022-11-30_at_15.39.31.png
Attachment 23: Screenshot_2022-11-30_at_15.40.43.png
Screenshot_2022-11-30_at_15.40.43.png
Attachment 24: Screenshot_2022-11-30_at_15.41.33.png
Screenshot_2022-11-30_at_15.41.33.png
Attachment 25: Screenshot_2022-11-30_at_15.42.01.png
Screenshot_2022-11-30_at_15.42.01.png
Attachment 26: Screenshot_2022-11-30_at_15.46.29.png
Screenshot_2022-11-30_at_15.46.29.png
  383   Thu Dec 1 08:56:59 2022 AR TDThursday 1 December

Photos of noise observed at each of the AIDA PSU outputs by digital oscillscope.

DAQ GOing with waveforms enabled.

Connection from AIDA PSU to scope by DMM test probes, twisted cabling, 3mm jack plug/BNC adaptor.

Attachment 1,2,3 =  +5V

Attatchment 4 = -6V

Attatchment 5 = +7V

Attatchment 6 shows test setup

 

Repeat above test with *all* cables from AIDA PSU to FEE64s disconnected, i.e. no AIDA PSU load.

Attachment 7,8,9 =  +5V

Attatchment 10 = -6V

Attatchment 11 = +7V

Attachment 1: IMG_8378.JPG
IMG_8378.JPG
Attachment 2: IMG_8380.JPG
IMG_8380.JPG
Attachment 3: IMG_8382.JPG
IMG_8382.JPG
Attachment 4: IMG_8384.JPG
IMG_8384.JPG
Attachment 5: IMG_8385.JPG
IMG_8385.JPG
Attachment 6: IMG_8387.JPG
IMG_8387.JPG
Attachment 7: IMG_8393.JPG
IMG_8393.JPG
Attachment 8: IMG_8392.JPG
IMG_8392.JPG
Attachment 9: IMG_8391.JPG
IMG_8391.JPG
Attachment 10: IMG_8390.JPG
IMG_8390.JPG
Attachment 11: IMG_8389.JPG
IMG_8389.JPG
  504   Sat Feb 10 10:00:44 2024 AR RSS JM CBRun 13, 14

System checks: all ok

Attatchment 1: Rates ok

Attatchment 2: Temperatures ok

Attatchment 3: Waveform layout 7

Attatchment 4: Waveform layout 8

Attatchment 5: Waveform layout 1

Attatchment 6: Waveform layout 2

Attatchment 7: Leakage current ok

 

Moved pneumatic / servo for right / left arms in /out

Attachment 8: left servo fully in

9: left pneumatic in (beam is clipped)

10: left pneumatic & servo in (beam is clipped)

11: right servo in

12: right pneumatic in

13: right pneumatic & serve in

 

Some clear issues with strip mapping persist.

 

Strip map

#map strip: 01:00 left/top side, 02:00 right/bottom side (from beam view)            
stripMap    1    2                                            
stripMap    2    1                                            
stripMap    3    2                                            
stripMap    4    1                                            
stripMap    5    2
stripMap    6    1
stripMap    7    2
stripMap    8    1
stripMap    9    1
stripMap    10    2
stripMap    11    1
stripMap    12    2
stripMap    13    1
stripMap    14    2
stripMap    15    1
stripMap    16    2  

 

/////// UPDATE /////////

 

System checks: all ok - except waveform for AIDA 15 in layout 2, it has a low rate compared to others

Attatchment 14: Rates ok

Attatchment 15: Temperatures ok

Attatchment 16: Waveform layout 7

Attatchment 17: Waveform layout 8

Attatchment 18: Waveform layout 2

Attatchment 19: Waveform layout 1

Attatchment 20: Leakage current ok

/////// UPDATE //////

After beam stiring - layout of xy histograms are updated

DSSD0 and DSSD3 have the correct orientation,

DSSD1 needs to be flipped mirrored on the yaxis (i.e. right needs to be left, and left needs to be right but up and down are correct)

DSSD2 needs to be flipped on the xaxis (i.e. up needs to be down and down needs to be up but left and right are correct)

Horizontal offset in YR3 target = 9mm

Horizontal offset in YR7 target = 9mm

Horizontan offset in YR9 target = -9mm

Vertial offset in YR9 target = -8mm

Attatchment 21: Beam profile before stiring

Attatchment 22: Beam profile after stiritng - much better, hitting detectors less.

 

/// UPDATE ///

Mapping for the sort code has been fixed so that detectors are orientated correctly as if looking at the detectors downstream.We was missing dssdPNisX command which lets the sort code know if the PN FEEs correspond to X or Y. Correct mapping is now;

       
stripMap    1    1                                            
stripMap    2    2                                            
stripMap    3    1                                            
stripMap    4    2                                            
stripMap    5    1
stripMap    6    2
stripMap    7    2
stripMap    8    1
stripMap    9    2
stripMap    10    1
stripMap    11    1
stripMap    12    2
stripMap    13    1
stripMap    14    2
stripMap    15    1
stripMap    16    2   

 

 

 

 

Attachment 1: Screenshot_from_2024-02-10_11-01-27.png
Screenshot_from_2024-02-10_11-01-27.png
Attachment 2: Screenshot_from_2024-02-10_11-01-42.png
Screenshot_from_2024-02-10_11-01-42.png
Attachment 3: Screenshot_from_2024-02-10_11-02-37.png
Screenshot_from_2024-02-10_11-02-37.png
Attachment 4: Screenshot_from_2024-02-10_11-02-58.png
Screenshot_from_2024-02-10_11-02-58.png
Attachment 5: Screenshot_from_2024-02-10_11-03-25.png
Screenshot_from_2024-02-10_11-03-25.png
Attachment 6: Screenshot_from_2024-02-10_11-03-47.png
Screenshot_from_2024-02-10_11-03-47.png
Attachment 7: Screenshot_from_2024-02-10_11-05-40.png
Screenshot_from_2024-02-10_11-05-40.png
Attachment 8: l_s_in.png
l_s_in.png
Attachment 9: l_p_in.png
l_p_in.png
Attachment 10: l_p&s_in.png
l_p&s_in.png
Attachment 11: r_s_in.png
r_s_in.png
Attachment 12: r_p_in.png
r_p_in.png
Attachment 13: r_s&p_in.png
r_s&p_in.png
Attachment 14: Screenshot_from_2024-02-10_13-41-54.png
Screenshot_from_2024-02-10_13-41-54.png
Attachment 15: Screenshot_from_2024-02-10_13-42-11.png
Screenshot_from_2024-02-10_13-42-11.png
Attachment 16: Screenshot_from_2024-02-10_13-43-10.png
Screenshot_from_2024-02-10_13-43-10.png
Attachment 17: Screenshot_from_2024-02-10_13-47-04.png
Screenshot_from_2024-02-10_13-47-04.png
Attachment 18: Screenshot_from_2024-02-10_13-48-38.png
Screenshot_from_2024-02-10_13-48-38.png
Attachment 19: Screenshot_from_2024-02-10_13-49-39.png
Screenshot_from_2024-02-10_13-49-39.png
Attachment 20: Screenshot_from_2024-02-10_13-50-13.png
Screenshot_from_2024-02-10_13-50-13.png
Attachment 21: Screenshot_from_2024-02-10_14-12-54.png
Screenshot_from_2024-02-10_14-12-54.png
Attachment 22: Screenshot_from_2024-02-10_14-56-15.png
Screenshot_from_2024-02-10_14-56-15.png
Attachment 23: Screenshot_from_2024-02-10_16-15-27.png
Screenshot_from_2024-02-10_16-15-27.png
  153   Thu Nov 11 14:01:00 2021 AK, MLHeater channel layouts

Schematic layout of heaters and channel assignment attached. Table kindly provided by AK. I hope the conversion from excel to pdf didn't swallow any important information.

Attachment 1: 2020.11.05_Cryring-YR09-baking-layout.pdf
2020.11.05_Cryring-YR09-baking-layout.pdf
  118   Tue Oct 12 13:54:21 2021 RSS TD + OD DRCARME opened
With the assistance of Oemer and Davide all of the M22 bolts removed from the downstream section of the CARME chamber. To separate the downstream section from the 
upstream sections it was necessary to use a lever between M10 bolts screwed into the lift points of adjacent sections of the CARME. The upstream sections were then 
lifted from the support frame and placed on the shipment crate base. The open ports of the CARME chamber sections were covered by Al foil.

Attachments 1-3 show downstream section following removal of upstream sections of CARME chamber. Note staining/residue top and bottom right - attachments 2 & 3.
Attachment 1: 20211012_143212.jpg
20211012_143212.jpg
Attachment 2: 20211012_143221.jpg
20211012_143221.jpg
Attachment 3: 20211012_143229.jpg
20211012_143229.jpg
Attachment 4: IMG_5002.JPG
IMG_5002.JPG
Attachment 5: IMG_4981.JPG
IMG_4981.JPG
Attachment 6: IMG_4982.JPG
IMG_4982.JPG
Attachment 7: IMG_4987.JPG
IMG_4987.JPG
Attachment 8: IMG_4989.JPG
IMG_4989.JPG
Attachment 9: IMG_4994.JPG
IMG_4994.JPG
Attachment 10: IMG_4999.JPG
IMG_4999.JPG
Attachment 11: IMG_4977.JPG
IMG_4977.JPG
Attachment 12: IMG_4996.JPG
IMG_4996.JPG
Attachment 13: IMG_5001.JPG
IMG_5001.JPG
Attachment 14: IMG_5002.JPG
IMG_5002.JPG
Attachment 15: IMG_5003.JPG
IMG_5003.JPG
Attachment 16: IMG_5004.JPG
IMG_5004.JPG
Attachment 17: IMG_5005.JPG
IMG_5005.JPG
Attachment 18: IMG_5006.JPG
IMG_5006.JPG
Attachment 19: IMG_5007.JPG
IMG_5007.JPG
Attachment 20: IMG_5008.JPG
IMG_5008.JPG
  381   Tue Nov 29 14:37:56 2022 AR TDTuesday 29 November

16:20

DSSD bias and leakage current values:

-99.99 V

-13.2535 uA

Pulsar peak widths (ch FWHM)

aida01 ~ 100

aida02 ~ 103

aida03 ~ 128

aida04 ~ 133

aida05 ~ 22

Pretty similar to what was found in august https://elog.ph.ed.ac.uk/CARME/377

 

 

 

 

Attachment 1: IMG_8240_3.jpg
IMG_8240_3.jpg
Attachment 2: IMG_8241_3.jpg
IMG_8241_3.jpg
Attachment 3: IMG_8242_3.jpg
IMG_8242_3.jpg
Attachment 4: IMG_8243_3.jpg
IMG_8243_3.jpg
Attachment 5: IMG_8246_3.jpg
IMG_8246_3.jpg
Attachment 6: IMG_8247_3.jpg
IMG_8247_3.jpg
Attachment 7: IMG_8248_3.jpg
IMG_8248_3.jpg
Attachment 8: IMG_8249_3.jpg
IMG_8249_3.jpg
Attachment 9: IMG_8250_3.jpg
IMG_8250_3.jpg
Attachment 10: IMG_8252_3.jpg
IMG_8252_3.jpg
Attachment 11: IMG_8253_3.jpg
IMG_8253_3.jpg
Attachment 12: IMG_8254_3.jpg
IMG_8254_3.jpg
Attachment 13: IMG_8255_3.jpg
IMG_8255_3.jpg
Attachment 14: IMG_8257_3.jpg
IMG_8257_3.jpg
Attachment 15: IMG_8258_3.jpg
IMG_8258_3.jpg
Attachment 16: IMG_8259_3.jpg
IMG_8259_3.jpg
Attachment 17: IMG_8264_3.jpg
IMG_8264_3.jpg
Attachment 18: Screenshot_2022-11-29_at_16.40.13.png
Screenshot_2022-11-29_at_16.40.13.png
Attachment 19: Screenshot_2022-11-29_at_16.42.37.png
Screenshot_2022-11-29_at_16.42.37.png
Attachment 20: Screenshot_2022-11-29_at_16.47.03.png
Screenshot_2022-11-29_at_16.47.03.png
Attachment 21: Screenshot_2022-11-29_at_16.49.07.png
Screenshot_2022-11-29_at_16.49.07.png
Attachment 22: Screenshot_2022-11-29_at_16.49.44.png
Screenshot_2022-11-29_at_16.49.44.png
ELOG V3.1.4-unknown