Entry  Mon Sep 6 14:13:17 2021, CB ML, Motors mounted - first attempt 20210906_113522.jpg20210906_113519.jpg20210906_115601.jpg20210906_152607.jpg20210906_143944.jpg
Mounted both  motors on CARME. Started 
with outside motor.
Entry  Sat Sep 4 15:54:50 2021, CB RSS, Motor mounting preparation 20210904_162517.jpg20210904_162520.jpg
Prepared the motors to be mounted and 
found all components required. No issues. 
May have to partly dismount again to fix 
Entry  Fri Sep 3 15:55:00 2021, CB RSS, Issues with cable clamps 20210903_154614.jpg20210903_162519.jpg
Attempted to mount cable clamps for strain 
relief on inner part of Allectra 
feedthroughs.
Entry  Fri Sep 3 14:14:40 2021, TD, Leybold IE514 manual & calibration data 20210903_141201.jpgIonivac_Sensors_IE414_IE514.pdf
 
Entry  Fri Sep 3 08:14:51 2021, CB RSS, Issues foreseeable splitting CARME 7x
In order to install the detector supports 
and eventually install the detectors 
themselves CARME must be split and 
Entry  Fri Sep 3 08:12:39 2021, CB RSS, Pressure after overnight pump down 20210903_085646.jpgIMG_4487.JPG
03.09.2021   09:00   5.27E-7 mbar     
03.09.2021   13:00   4.08E-7 mbar                   
Entry  Thu Sep 2 21:04:26 2021, CB RSS ML + DR OG, Gate valves mounted + pump down 6x
Mounted both gate valves and support. Gate 
valves could not be installed one bolt 
rotated from 90 degrees as per drawings 
Entry  Thu Sep 2 10:41:16 2021, CB RSS + DR OG, CARME connected to the CRYRING 20210902_114031.jpg
Connected CARME to the CRYRING via tube 
plus bellows. See attach.
Entry  Wed Sep 1 17:14:16 2021, CB RSS + DR ML, CARME mounted on the CRYRING 20210901_162435.jpg20210901_173059.jpg20210901_174157.jpg20210901_134635.jpg20210901_173059.jpg
Lifted CARME with Al support on the 
CRYRING. No issues during transportation. 
Entry  Wed Sep 1 12:05:28 2021, CB RSS, Preparation for CARME on CRYRING YR09 20210901_125504.jpg20210901_125517.jpg
Mounted additional cross member for motor 
support. See attach 1
Entry  Tue Aug 31 18:56:35 2021, CB, CARME status 9x
(ELOG does not allow more pictures to be added to previous entry)
Entry  Tue Aug 31 18:34:41 2021, CB RSS + DR OG, CARME on Al stand 20210831_144545.jpg20210831_171442.jpg20210831_171447.jpg20210831_171449.jpg20210831_171453.jpg
Lifted CARME off the floor and mounted feet on sides. It was found impossible to put four bolts for each foot
due to alignment conflict. Three bolts were mounted per foot instead.
Entry  Tue Aug 31 11:55:11 2021, CB RSS, Last preparations for CARME lift 16304077162843806956479048661374.jpg16304077904321905824276870110392.jpg
Found strut bolts in the bag with 
spherical washers. Mounted the struts and 
the washers. See attach 1.
Entry  Tue Aug 31 07:09:54 2021, CB RSS (rem) JM, Preparation for mounting 6x
(30 August 2021)

The current state of YR09 is as per attach 1. CCC has been removed, but additional pumps and gauges remain. Some
Entry  Wed Aug 25 07:02:41 2021, RSS TD, 25-31 August 19x

Pirani  IE514
mbar    mbar


25/8/21 08:00 0.0030 1.86e-8

----------------------------------------------------

26/8/21   09:00  0.0030   1.77e-8

----------------------------------------------------
Entry  Wed Aug 18 11:58:49 2021, NTD RSS, Misc fittings and fasteners plus gasket inventory 22x
Attachments 1-3 fasteners, fittings found amongst earlier shipments. I assume that the STFC DL cleaned items are for the internal detector mount assembly.

Entry  Wed Aug 18 07:07:26 2021, RSS TD, 18-24 August 25x

Pirani  IE514
mbar    mbar


18/8/21 08:00 0.0034 3.90e-8
18/8/21 17:00 0.0032 3.72e-8


 

-------------------------------------------------------------

19/8/21  08:00  0.0032  3.38e-8
Entry  Fri Aug 13 07:28:37 2021, RSS TD, Friday 13-17 August  23x
Pirani  IE514
mbar    mbar
Entry  Thu Aug 12 09:16:42 2021, TD RSS, Thursday 12 August 13x

Attachment 1 - IE414/514 feedthrough wiring diagram
Entry  Wed Aug 11 12:30:40 2021, TD RSS, Wednesday 11 August  8x

Attachments 1 & 2 - 2x SAES D-2000 re-fitted to side ports
                    all 4x SAES D-2000 now re-fitted to chamber