AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CIRCE, Page 2 of 4  ELOG logo
Entry  Mon Dec 3 17:59:48 2018, Thomas Chillery, Raffaele Buompane, Calibration with alpha source - 0.9um mylar on Far S2 IMG_3305.JPGIMG_3307.JPGIMG_3315.JPGIMG_3313.JPG181128123940_ADC1_Ch9.png
On 28/11/2018:

After pulser walkthrough (see eLog entry #67)

Dismounted targets from ladder - see picture 1 and 2 for upstream and downstream sides respectively
Entry  Mon Dec 3 18:15:42 2018, Thomas Chillery, Raffaele Buompane, Calibration with alpha source - no mylar on Far S2 IMG_3337.JPG182812_S2_Alpha_NoMylar.jpg
On 28/11/2018:

At 13:35: Far S2 bias = -130.0V, leak I = 1.55uA. Diode bias = -70.1V, leak I = 0.00uA.

Pressures (mBar):
Entry  Mon Dec 3 18:30:53 2018, Thomas Chillery, Raffaele Buompane, Calibration with alpha source - 12um mylar on Far S2 IMG_3356.JPGIMG_3363.JPG181128184505_ADC1_Ch9.png
On 28/11/2018:

Mounted 12um mylar in front of far S2 - see attached pictures 1 and 2

In air: Far S2 biased to -130.0V, leak I = 1.61uA. Diode biased to -70.1V, leak I = 0.01uA -> 0.00uA. Rate meter ~ 4500Hz.
Entry  Mon Dec 3 18:45:17 2018, Thomas Chillery, Raffaele Buompane, End of beamtime - Module settings 
Diode Ortec 571 Amplifier Settings:


Fine gain: 10 (0.5 ->1.5)
Course gain: 50
Shaping time: 0.5us
BLR AUTO: ON
NEG: ON (Instead
of POS)
OUT: ON (Instead of Delay)
Internal fine gain: 1X


Diode quad TFA settings:
Entry  Mon Dec 3 18:55:31 2018, Thomas Chillery, Raffaele Buompane, End of beamtime - Cleanup 8x
On 29/11/2018:

Dismounted S2 2323-18 (496um), 12um mylar, diode, and diodes 0.9um mylar.

Performed general cleanup of lab. Boxed away cables and other parts. See attached pictures 1, 2, 3, and 4.
Entry  Mon Dec 3 19:04:20 2018, Thomas Chillery, Raffaele Buompane, End of beamtime - Items to be shipped back to Edinburgh 
To be shipped back to Edinburgh for repair:





Item

Quantity


ECL - NIM Convertor
2


Quad HV Supply
1


Quad
Entry  Wed Mar 7 16:56:52 2018, Thomas Chillery, Peter Black, Tests - Modifying Chamber Parts in Edinburgh 
Today we began examining and modifying parts of the chamber shipped from CIRCE to Edinburgh.

The parts shipped were:


Chamber Collar
Central Lid
Downstream Lid
Two Metal Detector Masks
Two Iris Mounts
One
Entry  Tue Mar 27 16:36:01 2018, Thomas Chillery, Peter Black, Tests - Modifying Chamber Parts in Edinburgh 11x
Between 7th to 21st March modifications were made to the top of the CIRCE target chamber.

These modifications address the three key issues highlighted during the February shifts

1. The central S2 detector did not fit, because its connector pins came into contact with the chamber lid
Entry  Wed Nov 21 08:45:03 2018, Thomas Chillery, Marialuisa Aliotta, Raffaele Buompane, Carlo Bruno, Testing Chamber Vacuum 
On 19/11/2018:

We mounted the following in the chamber:


Iris frames - no S2 detectors or mylar
Si pin diode mount with 0.9um mylar - no diode
Target ladder with blank
Entry  Wed Nov 21 08:37:24 2018, Thomas Chillery, Marialuisa Aliotta, Raffaele Buompane, Upstream Collimator IMG_3391_Modified.JPG
On 19/11/2018:

During the target ladder calibration (see elog entry #41) we also replaced the collimator (thickness ~24mm, diameter 3mm) located immediately
upstream from the target ladder - that is between the upstream and central sections of the chamber. We mounted an aluminium collimator (thickness ~1mm,
Entry  Sat Nov 24 16:29:10 2018, Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Tom Davinson, Raffaele Buompane, Preparing setup for 7Li beam 
On 23/11/2018:

10:15 started pumping down chamber with Ecodry 2

RAL thresholds:
Entry  Sat Nov 24 16:39:22 2018, Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Tom Davinson, Raffaele Buompane, 7Li 4.0 MeV beam on CH2 target 15 
On 23/11/2018:

Tuned beam for 4.0 MeV 7Li, charge state 2+

Measured transmission of beam through FCC using 3 mm and 10 mm size collimators: 66 pA with 10 mm -> 60 pA with 3 mm -> 91% transmission
Entry  Mon Nov 26 17:10:13 2018, Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Tom Davinson, Raffaele Buompane, 7Li 4.0 MeV beam on natC target 3 
On 23/11/2018:

After the runs with 7Li on CH2 15, we moved the target ladder to position 5: carbon foil #3 (~590 ug/cm^2)

Run # 181123214406
Entry  Sat Nov 24 15:07:00 2018, Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth Morales, Tom Davinson, Searching for causes of noise 
On 22/11/2018 in the afternoon:

We increased the ADC thresholds to 40 (previously 8).

For an alpha source with pulser connected, the event multiplicity dropped from ~63 to ~10. Dead time ~ 7%
Entry  Wed Nov 21 09:09:41 2018, Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth Morales, David Rapagni, Mounting Detectors / Continuing Electronic Chain Tests IMG_3209.JPG
On 20/11/2018:

At 9:00 we walked into the lab, David R reported he found all the pumps OFF. A thunderstorm occurred overnight causing a power outage.

Last night we had switched off the electronics (Preamp power, RAL amp rack, and NIM bin).
Entry  Wed Nov 21 08:53:06 2018, Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth Morales, Testing Electronic Chain - No Detectors 
On 19/11/2018:

During the vacuum test - see eLog entry #43 we performed noise tests on the preamplifiers with no S2 detector connected

First we performed a "tabletop" test - the preamplifiers were not connected to the chamber.
Entry  Wed Nov 21 09:28:06 2018, Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth Morales, Problem encountered with near iris arm 
On 20/11/2018:

After the electronics tests in air (see eLog entry #44) we started to setup the chamber for vacuum tests with an alpha source.

We started mounting the aperture used for controlling the near iris arm, however we encountered a problem. The iris arm got stuck and could not
Entry  Thu Nov 22 11:34:07 2018, Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth Morales, Continuing Electronic Chain Tests 
This morning at 8:35am the pressures read (in mBar):


TPU1 = 2.0e-6
TPU2 = 4.5e-7
TPD1 = 8.1e-7
TPD2 = 7.9e-7
CHUP = 4.7e-7
CHDW = 1.1e-5


The
detectors were biased. Far S2 leak I = 1.54uA, near S2 leak I = 12.53uA.
Entry  Thu Nov 22 11:53:08 2018, Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth Morales, DAQ tests with alpha source IMG_3329.JPGAlphaSourceCertificate.jpg
The target ladder is set for position 7 - the double alpha source.

Looking at the FAIR DAQ, for the Far S2 the first RAL amplifier (XV) shows:


Alphas at channel 700
Pulser centroid at channel ~2640, with 9 channel FWHM -> corresponds to 44 keV FWHM at 4.91 keV/channel


The
Entry  Sat Nov 24 15:05:40 2018, Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth Morales, FAIR DAQ 
The FAIR DAQ IP address: 192.168.1.90

The data is saved in /Local_Parts/Part0DE/

After each run we should copy the data to the 7Be shift folder: /home/circe/7Be_pp/181122/
ELOG V3.1.3-7933898