|
ID |
Date |
Author |
Subject |
Text |
 |
|
19
|
Sun Feb 25 15:14:54 2018 |
Thomas Chillery, Lizeth Morales, David Rapagnani | Setup - Beam Tuning and Prepare Chamber for Measurement at 3.45MeV 7Li - Morning of 23rd | On the morning of 23/02/18 we aimed to
complete beam tuning of 7Li at 3.45MeV.
At 8:43 CHUP = 7.2e-6mBar, CHDW |
|
|
14
|
Thu Feb 22 07:58:48 2018 |
Thomas Chillery, Tom Davinson, Raffaele Buompane, David Rapagnani, Lucio Gialanella | Setup - Beam Tuning and Prepare Chamber for Measurement at 3.0MeV 7Li | On 21/02/2018 we reattempted the beam tuning.
We expected this to be easier now the rogue
mylar is removed from the beamline. |
|
|
12
|
Tue Feb 20 17:03:08 2018 |
Thomas Chillery, Tom Davinson, Raffaele Buompane, David Rapagnani | Setup - Beam Tuning | The pumps were left on overnight, in the
morning at 8:25 the pressure reads:
Up = 1.5e-5 mBar and Down = 4.0e-5 |
  |
|
36
|
Fri Apr 13 14:31:59 2018 |
Thomas Chillery, Lucio Gialanella | Setting up for 7Be 5.0MeV beam | Date: 07/04/2018
We changed to cathod 23 - 7Be
For beam tuning we: |
|
|
47
|
Wed Nov 21 09:34:26 2018 |
Thomas Chillery, Marialuisa Aliotta, Carlo Bruno | Setting up chamber both for tests under vacuum and physics measurement | Today we mounted the far aperture used
to control the far iris. No problems were
encountered with this. |
 |
|
51
|
Sat Nov 24 15:07:00 2018 |
Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth Morales, Tom Davinson | Searching for causes of noise | On 22/11/2018 in the afternoon:
We increased the ADC thresholds
to 40 (previously 8). |
|
|
11
|
Tue Feb 20 16:57:49 2018 |
Thomas Chillery | Screenshots - ADC 2 and ADC 4 settings, and example pulser walkthrough | |
11x |
|
67
|
Mon Dec 3 17:51:46 2018 |
Thomas Chillery, Raffaele Buompane | Pulser Walkthrough | On 28/11/2018:
Performed pulser walkthrough, Run
# 181128090835 |
|
|
46
|
Wed Nov 21 09:28:06 2018 |
Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth Morales | Problem encountered with near iris arm | On 20/11/2018:
After the electronics tests in
air (see eLog entry #44) we started to setup |
|
|
52
|
Sat Nov 24 16:29:10 2018 |
Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Tom Davinson, Raffaele Buompane | Preparing setup for 7Li beam | On 23/11/2018:
10:15 started pumping down chamber
with Ecodry 2 |
|
|
55
|
Mon Nov 26 17:13:45 2018 |
Thomas Chillery, Carlo Bruno, Tom Davinson, Lucio Gialanella | Preparing chamber for 4MeV 7Be 2+ beam | On 24/11/2018:
At 8:35 the chamber pressures read
(mBar): |
 |
|
75
|
Tue Dec 4 09:40:31 2018 |
Thomas Chillery | Preliminary measurements of target activation using geiger counter | On 29/11/2018 at 17:40 a rough measurement
of the irradiated target activity was performed
using a geiger counter. |
|
|
4
|
Thu Feb 15 20:45:27 2018 |
Thomas Chillery | Planning - Target Chamber CAD diagram | Find attached the latest CAD diagram of
the Target Chamber, drawn by Peter Black |
|
|
22
|
Tue Mar 6 15:41:53 2018 |
Thomas Chillery, Raffaele Buompane | Pin Diode Pulser Walkthrough at End of February Shifts | On 23/02/2018:
After the alpha source calibration
of the S2 (See eLog entry #21) we decided |
|
|
45
|
Wed Nov 21 09:09:41 2018 |
Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth Morales, David Rapagni | Mounting Detectors / Continuing Electronic Chain Tests | On 20/11/2018:
At 9:00 we walked into the lab,
David R reported he found all the pumps OFF. |
|
|
15
|
Thu Feb 22 10:40:49 2018 |
Thomas Chillery, Raffaele Buompane, David Rapagnani, Lucio Gialanella | Measurement / Test - 3.0MeV 7Li on CH2 Target VII | On 21/02/2018 after beam tuning and pumping
down at 18:07 the pressures read Up = 1.2e-5mBar,
Down = 3.2e-5mBar. We were happy to power |
  |
|
20
|
Sun Feb 25 15:59:38 2018 |
Thomas Chillery, Lizeth Morales, Raffaele Buompane, David Rapagnani, Lucio Gialanella | Measurement - 3.45MeV 7Li on CH2 Target III | On 23/02/2018 at 13:49 we started the DAQ
in list mode.
After starting the DAQ we sent |
  |
|
17
|
Thu Feb 22 18:04:12 2018 |
Thomas Chillery, Raffaele Buompane, David Rapagnani, Lucio Gialanella | Measurement - 3.0MeV 7Li on CH2 Target VII | Yesterday (21st) night we saw this low
channel, high rate (1500Hz) noise on the
diode spectrum - see eLog entry #15. |
    |
|
77
|
Wed Sep 18 14:01:13 2019 |
Thomas Chillery | Logbook Spreadsheet | See attached for the logbook |
|
|
66
|
Mon Dec 3 17:40:51 2018 |
Thomas Chillery, Carlo Bruno, Raffaele Buompane | Lab background | On 27/11/2018:
Run # 181127200709
Run time: 46329s
Pulser |
 |