  47   Wed Nov 21 09:34:26 2018 Thomas Chillery, Marialuisa Aliotta, Carlo BrunoSetting up chamber both for tests under vacuum and physics measurementToday we mounted the far aperture used
to control the far iris. No problems were
encountered with this.
 IMG_3223.JPGIMG_3224.JPG 
  41   Wed Nov 21 08:18:14 2018 Thomas Chillery, Marialuisa AliottaChecking Target Ladder CalibrationOn 19/11/2018:

There were three CH2 targets already
mounted on the target frame, CH2 III, IV,
 IMG_3204.JPGIMG_3205.JPGIMG_3200.JPG 
  34   Fri Apr 13 08:24:47 2018 Thomas Chillery, Lucio GialanellaAttempting to add downstream S2 to DAQ setup and fixing problems during setupDate: 07/04/2018 (Last day of April shift)

9:55 pressures read: CHUP = 1.3e-5
mBar, CHDW = 3.5 e-5 mBar
  
  35   Fri Apr 13 13:59:18 2018 Thomas Chillery, Lucio Gialanella7Li 5.0MeV Beam test with Central S2 and Downstream S2 first 8 channelsDate: 07/04/2018

At 12:10 we started the DAQ for
5.0 MeV 7Li in 2+ charge state bombarding
 180407_7Li_5MeV_CentralS2_FrontStrip.png180407_7Li_5MeV_DWS2_FrontStrip.png180407_7Li_5MeV_CentralS2_BackStrip.png180407_7Li_5MeV_Diode.png 
  36   Fri Apr 13 14:31:59 2018 Thomas Chillery, Lucio GialanellaSetting up for 7Be 5.0MeV beamDate: 07/04/2018

We changed to cathod 23 - 7Be

For beam tuning we:
  
  37   Fri Apr 13 14:42:31 2018 Thomas Chillery, Lucio Gialanella7Be 5.0MeV Beam test on CH2 target III with central S2 and downstream S2 channels 0-7 Date: 07/04/2018

To run the measurement we:


Opened the central iris
  
  38   Fri Apr 13 14:56:11 2018 Thomas Chillery, Lucio Gialanella7Be 5.0MeV Beam test on CH2 target IV with central S2 and downstream S2 channels 0-7 Date: 07/04/2018

FC - 4 = 410 - 260 = 150 pA

We moved the target ladder to position
  
  39   Fri Apr 13 15:08:04 2018 Thomas Chillery, Lucio GialanellaEnd of shift - lab cleanupDate: 07/04/2018

Began dismounting detectors:


All detectors powered off
Closed
  
  26   Tue Apr 3 18:16:26 2018 Thomas Chillery, Lizeth Morales, Raffaele Buompane, Lucio GialanellaTests - Unpacking and Mounting Chamber Parts This morning I unpacked the chamber parts.

I mounted the downstream and central
lids with the iris arm hooks to double check
 IMG_2832.JPGIMG_2839.JPGIMG_2841.JPG 
  20   Sun Feb 25 15:59:38 2018 Thomas Chillery, Lizeth Morales, Raffaele Buompane, David Rapagnani, Lucio GialanellaMeasurement - 3.45MeV 7Li on CH2 Target IIIOn 23/02/2018 at 13:49 we started the DAQ
in list mode.

After starting the DAQ we sent
 180223_S2FrontStrip_ADC2CH20.png180223_S2BackStrip_ADC4CH24.png180223_PinDiode_ADC6CH31.png 
  19   Sun Feb 25 15:14:54 2018 Thomas Chillery, Lizeth Morales, David RapagnaniSetup - Beam Tuning and Prepare Chamber for Measurement at 3.45MeV 7Li - Morning of 23rdOn the morning of 23/02/18 we aimed to
complete beam tuning of 7Li at 3.45MeV.

At 8:43 CHUP = 7.2e-6mBar, CHDW
  
  5   Fri Feb 16 18:10:34 2018 Thomas Chillery, David RapagnaniSetup - Electronics Rack and Aperture IrisThis morning we moved the electronics rack
to within ~2.5m of the target chamber, leaving
room for the ribbons cables of ~5m length
  
  7   Fri Feb 16 18:28:42 2018 Thomas Chillery, David RapagnaniSetup - Testing Chamber VacuumBy 16:40 I mounted all three chamber lids.

The central chamber lid includes
the diode detector mount, the iris, a vacuum
  
  61   Mon Dec 3 16:17:29 2018 Thomas Chillery, Carlo Bruno, Tom Davinson, Raffaele Buompane, David Rapagni3.0MeV 7Li on CH2 XIX and natC IIIOn 26/11/2018, after changing the far S2
mylar foil (see previous eLog entry #60):

Checked pulser frequency on oscilloscope:
 181126164509_ADC1_24.png181126183711_ADC1_Ch9.png181126183711_ADC3_Ch16.png 
  57   Mon Dec 3 11:54:55 2018 Thomas Chillery, Carlo Bruno, Tom Davinson, Raffaele Buompane7Li 6.0 MeV on CH2 XVI and XVIII, and on natC IIIOn 25/11/2018:

At 8:45 the pressures read (mBar):


TPU1 = 1.0e-6
TPU2
 181125113734_ADC1_Ch9.png181125113734_ADC3_Ch16.png 
  62   Mon Dec 3 16:39:42 2018 Thomas Chillery, Carlo Bruno, Tom Davinson, Raffaele Buompane3.0MeV 7Be on CH2 XIXOn 26/11/2018:

Tuned beam for 3.0MeV 7Be 2+. Far
S2 iris was closed during tuning.
 181126192446_ADC1_Ch9.png181126192446_ADC3_Ch16.png 
  58   Mon Dec 3 12:32:54 2018 Thomas Chillery, Carlo Bruno, Tom Davinson, Lucio Gialanella, Raffaele Buompane6.0MeV 7Be on CH2 XVIIIOn 25/11/2018:

The beam was tuned for 6.0MeV 7Be
2+
 181125121226_ADC1_Ch9.png181125121226_ADC3_Ch16.png181125223800_ADC1_Ch9.png181125223800_ADC3_Ch16.png 
  56   Mon Dec 3 11:28:53 2018 Thomas Chillery, Carlo Bruno, Tom Davinson, Lucio Gialanella, Antonino d'Leva7Be 4.0MeV on CH2 XVI and natC IIIOn 24/11/2018:

After the short test with 4.0MeV
7Li (see eLog #55) the beam was tuned for
 181124120558_ADC1_Ch9.png181124120558_ADC3_Ch16.png181124182304_ADC1_Ch9.png181124182304_ADC3_Ch16.png 
  55   Mon Nov 26 17:13:45 2018 Thomas Chillery, Carlo Bruno, Tom Davinson, Lucio GialanellaPreparing chamber for 4MeV 7Be 2+ beamOn 24/11/2018:

At 8:35 the chamber pressures read
(mBar):
 IMG_3231.JPGIMG_3232.JPG 
  59   Mon Dec 3 12:57:54 2018 Thomas Chillery, Carlo Bruno, Tom Davinson, David RapagniFinishing 6.0MeV 7Be 2+ and 7Li 2+ beam runsOn 26/11/2018:

The accelerator and chamber setup
were still operating after the overnight
 181126105357_ADC1_Ch9.png181126105357_ADC3_Ch16.png 