Entry  Wed Nov 21 09:34:26 2018, Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Setting up chamber both for tests under vacuum and physics measurement IMG_3223.JPGIMG_3224.JPG
Today we mounted the far aperture used to control the far iris. No problems were encountered with this.

We mounted the target ladder with the following configuration, see also pictures 1 and 2:




Target #
Target


I
Blank
Entry  Wed Nov 21 08:18:14 2018, Thomas Chillery, Marialuisa Aliotta, Checking Target Ladder Calibration IMG_3204.JPGIMG_3205.JPGIMG_3200.JPG
On 19/11/2018:

There were three CH2 targets already mounted on the target frame, CH2 III, IV, and a damaged target. We dismounted these.

We noticed these previous target were mounted on the incorrect side of the target ladder, resulting in them being offset upstream from the central
Entry  Fri Apr 13 08:24:47 2018, Thomas Chillery, Lucio Gialanella, Attempting to add downstream S2 to DAQ setup and fixing problems during setup 
Date: 07/04/2018 (Last day of April shift)

9:55 pressures read: CHUP = 1.3e-5 mBar, CHDW = 3.5 e-5 mBar

I noticed the preamp power (+/- 15V) was left on overnight. The +15V still draws 1.5A and -15V draws ~600mA as expected. During this shift no
Entry  Fri Apr 13 13:59:18 2018, Thomas Chillery, Lucio Gialanella, 7Li 5.0MeV Beam test with Central S2 and Downstream S2 first 8 channels 180407_7Li_5MeV_CentralS2_FrontStrip.png180407_7Li_5MeV_DWS2_FrontStrip.png180407_7Li_5MeV_CentralS2_BackStrip.png180407_7Li_5MeV_Diode.png
Date: 07/04/2018

At 12:10 we started the DAQ for 5.0 MeV 7Li in 2+ charge state bombarding CH2 Target III


Save name: RData_1/180407111531
DT = 0%
Trigger rate ~ 30 Hz
Event mult = 77.5


At
Entry  Fri Apr 13 14:31:59 2018, Thomas Chillery, Lucio Gialanella, Setting up for 7Be 5.0MeV beam 
Date: 07/04/2018

We changed to cathod 23 - 7Be

For beam tuning we:
Entry  Fri Apr 13 14:42:31 2018, Thomas Chillery, Lucio Gialanella, 7Be 5.0MeV Beam test on CH2 target III with central S2 and downstream S2 channels 0-7  
Date: 07/04/2018

To run the measurement we:


Opened the central iris (actuator setting = 14.0mm)
Opened the downstream iris (actuator setting = 1.5mm)
Set the
Entry  Fri Apr 13 14:56:11 2018, Thomas Chillery, Lucio Gialanella, 7Be 5.0MeV Beam test on CH2 target IV with central S2 and downstream S2 channels 0-7  
Date: 07/04/2018

FC - 4 = 410 - 260 = 150 pA

We moved the target ladder to position V (35.022mm) - CH2 Target IV
Entry  Fri Apr 13 15:08:04 2018, Thomas Chillery, Lucio Gialanella, End of shift - lab cleanup 
Date: 07/04/2018

Began dismounting detectors:


All detectors powered off
Closed line and quadrupole valves
Preamp power off
Stopped turbos
Closed
Entry  Tue Apr 3 18:16:26 2018, Thomas Chillery, Lizeth Morales, Raffaele Buompane, Lucio Gialanella, Tests - Unpacking and Mounting Chamber Parts  IMG_2832.JPGIMG_2839.JPGIMG_2841.JPG
This morning I unpacked the chamber parts.

I mounted the downstream and central lids with the iris arm hooks to double check we could still successfully mount them, see previous eLog entry
(#25) for photos from this procedure performed in Edinburgh.
Entry  Sun Feb 25 15:59:38 2018, Thomas Chillery, Lizeth Morales, Raffaele Buompane, David Rapagnani, Lucio Gialanella, Measurement - 3.45MeV 7Li on CH2 Target III 180223_S2FrontStrip_ADC2CH20.png180223_S2BackStrip_ADC4CH24.png180223_PinDiode_ADC6CH31.png
On 23/02/2018 at 13:49 we started the DAQ in list mode.

After starting the DAQ we sent the 3.45MeV 7Li beam onto the CH2 930ug/cm2 target III.

The trigger rate ~ 2kHz, event multiplicity = 6.1, dead time ~ 9%.
Entry  Sun Feb 25 15:14:54 2018, Thomas Chillery, Lizeth Morales, David Rapagnani, Setup - Beam Tuning and Prepare Chamber for Measurement at 3.45MeV 7Li - Morning of 23rd 
On the morning of 23/02/18 we aimed to complete beam tuning of 7Li at 3.45MeV.

At 8:43 CHUP = 7.2e-6mBar, CHDW = 1.9e-5mBar.

The S2 bias was ramped to -130.3V, leak I = 1.67uA. The diode bias was ramped to -70.1V, leak I = 0.01uA. The preamp power was also switched
Entry  Fri Feb 16 18:10:34 2018, Thomas Chillery, David Rapagnani, Setup - Electronics Rack and Aperture Iris 
This morning we moved the electronics rack to within ~2.5m of the target chamber, leaving room for the ribbons cables of ~5m length which connect the
preamps to the amplifiers in the rack.

Then I continued in attempts to solve the iris arm problem, see eLog entry #3.
Entry  Fri Feb 16 18:28:42 2018, Thomas Chillery, David Rapagnani, Setup - Testing Chamber Vacuum 
By 16:40 I mounted all three chamber lids.

The central chamber lid includes the diode detector mount, the iris, a vacuum feedthrough, and an actuator with no hook.

The downstream chamber lid includes a vacuum feedthrough and an actuator with no hook.
Entry  Mon Dec 3 16:17:29 2018, Thomas Chillery, Carlo Bruno, Tom Davinson, Raffaele Buompane, David Rapagni, 3.0MeV 7Li on CH2 XIX and natC III 181126164509_ADC1_24.png181126183711_ADC1_Ch9.png181126183711_ADC3_Ch16.png
On 26/11/2018, after changing the far S2 mylar foil (see previous eLog entry #60):

Checked pulser frequency on oscilloscope: 19.31Hz

Began tuning 3MeV 7Li 2+.
Entry  Mon Dec 3 11:54:55 2018, Thomas Chillery, Carlo Bruno, Tom Davinson, Raffaele Buompane, 7Li 6.0 MeV on CH2 XVI and XVIII, and on natC III 181125113734_ADC1_Ch9.png181125113734_ADC3_Ch16.png
On 25/11/2018:

At 8:45 the pressures read (mBar):


TPU1 = 1.0e-6
TPU2 = 3.2e-7
TPD1 = 6.5e-7
TPD2 = 6.1e-7
CHUP = Sensor Off
CHDW
Entry  Mon Dec 3 16:39:42 2018, Thomas Chillery, Carlo Bruno, Tom Davinson, Raffaele Buompane, 3.0MeV 7Be on CH2 XIX 181126192446_ADC1_Ch9.png181126192446_ADC3_Ch16.png
On 26/11/2018:

Tuned beam for 3.0MeV 7Be 2+. Far S2 iris was closed during tuning.

After tuning, using 10mm aperture FCC = 5pA, using 3mm aperture FCC = 4pA.
Entry  Mon Dec 3 12:32:54 2018, Thomas Chillery, Carlo Bruno, Tom Davinson, Lucio Gialanella, Raffaele Buompane, 6.0MeV 7Be on CH2 XVIII 181125121226_ADC1_Ch9.png181125121226_ADC3_Ch16.png181125223800_ADC1_Ch9.png181125223800_ADC3_Ch16.png
On 25/11/2018:

The beam was tuned for 6.0MeV 7Be 2+

Using 10mm aperture FCC = 12 pA
Entry  Mon Dec 3 11:28:53 2018, Thomas Chillery, Carlo Bruno, Tom Davinson, Lucio Gialanella, Antonino d'Leva, 7Be 4.0MeV on CH2 XVI and natC III 181124120558_ADC1_Ch9.png181124120558_ADC3_Ch16.png181124182304_ADC1_Ch9.png181124182304_ADC3_Ch16.png
On 24/11/2018:

After the short test with 4.0MeV 7Li (see eLog #55) the beam was tuned for 4.0MeV 7Be 2+.

Run # 181124103943
Entry  Mon Nov 26 17:13:45 2018, Thomas Chillery, Carlo Bruno, Tom Davinson, Lucio Gialanella, Preparing chamber for 4MeV 7Be 2+ beam IMG_3231.JPGIMG_3232.JPG
On 24/11/2018:

At 8:35 the chamber pressures read (mBar):


TPU1 = 2.2
TPU2 = 2.2
TPD1 = 2.2
TPD2 = 2.0
CHUP = Sensor Off
CHDW = No Sensor


The
Entry  Mon Dec 3 12:57:54 2018, Thomas Chillery, Carlo Bruno, Tom Davinson, David Rapagni, Finishing 6.0MeV 7Be 2+ and 7Li 2+ beam runs 181126105357_ADC1_Ch9.png181126105357_ADC3_Ch16.png
On 26/11/2018:

The accelerator and chamber setup were still operating after the overnight run.

Far S2 bias = -130V, leak I = 1.59uA. Diode bias = -70.1V, leak I = 0.00uA.
ELOG V3.1.4-unknown