AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 11 of 34  ELOG logo
Entry  Mon Jun 27 23:11:47 2022, TD, Tuesday 28 June 00:00-08:00 30x
00:07 Zero stats & all histograms

ASIC settings 2021Apr29-13-16-00
Entry  Mon Jun 27 17:03:09 2022, MA, Monday 27th June 16:00-00:00 6x
16:00 Took over the shift from OH no beam yet.

18:00 Still no beam yet.

Statistics, Temperature, Current are checked and attached 1-3
Entry  Mon Jun 27 06:45:22 2022, OH, Monday 27th June 08:00-16:00 220626_0830_Stats.png220626_0830_Temp.png220626_0831_Bias.pngR5_770_analysis.txt
07:45 Spoke to David and the beam has been gone since about 05:30
      Reason for the loss of beam is a vacuum issue before the FRS
      They are waiting for the experts
Entry  Sun Jun 26 23:04:30 2022, Marc, new shift - Monday 27 June 0:00 to 8:00 12x
0:00 Experiment continues to run smoothly. AIDA DAQ has been rather stable. Leakage current has gone up for the past two days in both DSSDs (combination
of high-Z and high-intensity beam and external high temperature).

Stats & Temperatures (VIRTEX,PSU, ASICs)  all ok.
Entry  Sun Jun 26 08:51:20 2022, OH, NH, Sunday 26 June 08:00-24:00 27x
09:51 Taken over from Tom following the night shift
      Experiment is still running smoothly
      Compression of the files is complete up to the start of R5.
Entry  Sat Jun 25 22:48:57 2022, TD, Sunday 26 June 00:00-08:00 30x
23.43 Check ASIC control
      Zero stats & all histograms
Entry  Sat Jun 25 17:06:42 2022, BA, AA, Saturday 25 June 2022 16:00-00:00 9x
Took over the night shift from Magda

 

18:00 : attachments 1-3
Entry  Sat Jun 25 06:55:07 2022, MS, Saturday 25 June 2022 8:00-16:00 15x
Took over the night shift from Tom.

7:00 The beam is back.

8:00 : attachments 1-3
Entry  Fri Jun 24 22:36:45 2022, TD, Saturday 25 June 00:00-08:00 31x

23:36 Check ASIC contorol
      Zero stats & all histograms
Entry  Fri Jun 24 15:04:06 2022, Marc, Friday 24th June - evening shift 11x
16:05 - Last checked was at 15:30. (see previous entry. All running smoothly.  

Next wide check will be in about an hour.

17:00
Entry  Fri Jun 24 06:56:06 2022, OH, Friday 24 June 008:00-16:00 16x
07:56 Took over from AM. No issues reported overnight
      Stats ok - attachment 1
      Temperature ok - attachment 2
Entry  Fri Jun 24 00:34:55 2022, AM, Friday 24 June 00:00-08:00 20x
01:30    Attachments 1-5, white rabbit and fpga timestamp failures, otherwise all good

03:30    Attachments 11-15, white rabbit and fpga timestamp failures, otherwise all good

05:30    Attachments 6-10, white rabbit and fpga timestamp failures, otherwise all good
Entry  Thu Jun 23 15:10:17 2022, Philippos Papadakis, Thursday 23 June 16:00-24:00 15x
16:20
System wide checks.
Clock status OK
Entry  Thu Jun 23 06:56:02 2022, OH, Thursday 23 June 08:00-16:00 11x
07:56 Taken over from AM
      Current White Rabbit Error status:
        Base  Current  Difference
Entry  Wed Jun 22 23:18:45 2022, AM, OH, TD, MA, Thursday 23 June 19x
00:00 TD Noticed on the last stats uploaded that AIDA08 had stopped sending signals.
      Attempted to recover restarting merger but this caused 01 to drop out.
Entry  Wed Jun 22 15:09:37 2022, MA, Wednesday 22 June 16:00-00:00 12x
16:00 Take over from Magda mrning shift

Beam was off of sometime for tunning to Mercurey setting.

17:00 attached 1-3
Entry  Wed Jun 22 10:09:12 2022, PJCS, INFO: FEE64 supply Voltages 
Study of the FEE64 power supply distribution has yielded the following :-

The most sensitive regulator, as regards the device voltage input, is the TPS51100 that supplies the DDR memory reference voltages. This
requires +4.75 to +5.25 volts. This is supplied from the Power input connector +5v input.
Entry  Wed Jun 22 07:12:46 2022, MS, Wednesday 22 June 8:00-16:00 16x
Took over the night shift from Tom.

8:10 : attachments 1-3

10:00 : attachments 4-6
Entry  Tue Jun 21 23:29:16 2022, TD, Wednesday 22 June 00:00-08:00 33x

00.28 all histograms & stats zero'd
      baseline counters
Entry  Tue Jun 21 10:19:05 2022, OH ML, Tuesday 21st June 08:00-00:00 12x
11:19 Stats ok 0xa on all FEE - attachment 1
      Current pulser settings - attachment 2
      FEE Temperatures ok - attachment 3
ELOG V3.1.4-unknown