Mon Jun 20 09:26:23 2022, OH, TD, Monday 20 June 11x
|
10:26 MACB HDMI for AIDA03 and AIDA04 reseated.
Merger and DAQ restarted - All happily sending data
Has been running for 10 minutes with no WR errors.
Rates from yesterday achieved again.
DTAS will move back into position at some point.
Once this is done, will perform pulser walkthrough.
11:14 DTAS now back in position for experiment
Slight increase in noise noticed across a few FEEs
Over time this has decreased on all but AIDA07 which is now running at ~80k - attachment 1
AIDA03 is now however gaining white rabbit errors at a rate of 1 every few minutes.
Less frequently gaining FPGA errors
12:20 AIDA power cycle to reseat the HDMI for AIDA03 - It would eventually crash if not done
Upon powering up again rates in AIDA08 slightly worse - attachment 2
13:26 No WR errors since the last power cycle.
21:16 Baseline system wide checks, zero histograms & stats
All system wide checks OK
per p+n FEE64 1.8.L spectra - attachment 3
aida01 pulser peak width 82 channels FWHM
per FEE64 rate spectra - attachment 4
adc, pause, resume and correlation scaler data item stats - attachments 5-8
FEE64 temps OK - attachment 9
DSSSD bias & leakage currents OK - attachments 10 & 11 |
Sun Jun 19 19:55:20 2022, NH, aida03 and aida04 
|
aida03 and aida04 seem to stop sending data quickly
stopping DAQ + merger and restarting got them resending data, but quickly stopped again
both are showing large WR errors that increases approx every second.
Assume HDMI cables not well seated and causing all sorts of odd behaviour |
Sun Jun 19 12:36:10 2022, OH, Sunday 19th June    
|
Yesterday the sum/inverter was found to be a considerable source of noise in the system.
Plugging it into an oscilloscope this morning it was clear there was a Vpp 17mv 60kHz sin wave in its signal - attachment 1 yellow trace
Moved the inverter to a crate in the messheute and did not see same behaviour. This time see Vpp 5mV and a ~265Hz wave that looks much less clean. - attachment 2 yellow
Put inverter back in CAEN crate in S4 and confirm similar behavior.
Move CAEN crate to new mains port, same behaviour
Move CAEN crate to AC voltage stabiliser, same behaviour
Remove module one by one from CAEN crate.
Removing BIAS supply - No change
Remove Pulser - No change
Remove right most MACB - No change
Remove second right most MACB - Signal disappears - attachment 3 blue trace
Remove second right most MACB from the rack entirely
Put right most MACB back - Signal comes back - attachment 4 blue trace
Test MACB with and without HDMI connectors connected signal remains
Remove rightmost MACB from the rack - Signal disappears
Put pulser and bias back - Signal does not return
Signal also doesn't return when ramping up bias or running the pulser
Power DAQ up - No change in performance from yesterday with inverter removed.
MACB and Inverter don't share any voltages on NIM:
MACB +-6V and Gnd
Inverter +-24V and Gnd
CAEN Crate does not have any easily accessible monitoring points. Anyone have any ideas?
MACBs and inverter checked on another crate - no signal
Inverter put back in CAEN crate and no noise observed on scope.
With waveforms disabled am able to get <100kHz on all FEEs with the pulser connected
Tested adding bias filters - No change
15:30 Nic realised that one of the mains boxes is labelled measurement network so we connect the AIDA PSU to this via the ac stabiliser
We get ok stats even with waveforms on at 0xa- attachment 5
Waveforms still have the 100kHz oscillation in them though attachments 6 and 7
Without waveforms we get similar performance to before the switch to the new mains - attachment 8
15:56 Move CAEN NIM crate across to this mains network
300+kHz on all FEEs with waveforms on. Can recover waveform off performance though
16:01 Place CAEN NIM crate back onto platform mains but don't recover the ealier rates with waveform. Everything still around 300kHz.
17:43 Current best settings are waveforms off and we can run at 0xa on all FEEs - attachment 9 |
Sun Jun 19 00:22:24 2022, TD, Sunday 19 June 14x
|
01.20
ASIC settings 2021Apr29-13-16-00
*except* slow comparator 0x64 -> 0xa
All waveform ADCs disabled
BNC PB-5 pulser
to p+n FEE64s only
all system wide checks OK *except* ADC calibration, WR decoder & FPGA timestamp errors - see attachments 1 & 2
DSSSD bias & leakage current OK - see attachments 3 & 4
FEE64 temps OK - see attachment 5
statistics OK - ADC data, pause, resume & correlation scaler data items
data push, data flush, aida01, aida02 - see attachments 6-13
per FEE64 1.8.L spectra - see attachment 14
aida01 pulser peak width 73 ch FWHM |
Sat Jun 18 09:46:57 2022, OH, NH, Friday 17th June 23x
|
Summary of the day:
Small improvements were made throughout the day but by far the biggest change to the rate in the FEEs came from disabling the waveforms
This was done by setting ADC con
Initial jumper configuration:
FEE LK
1 2 4
2 1 2 4
3 2 3 4
4 2 4
5 2 4
6 1 2 4
7 2 3 4
8 1 2 4
13:22 LK2, 3 and 4 on all p+n - attachment 1
14:20 AC mains relay connected to AC voltage stabilisers + on separate mains socket from DESPEC - attachment 2
Same configuration but waveforms disabled (p+n improvment) - attachment 3
Layout 1 - attachment 4
14:32 all FEE power cables moved to PSU 2 (Lower one in rack, upper one was slow to start for 1 FEE pair, likely the 5V slow to start)
Previously all FEEs on their own pair within a psu
New order 1,3 2,4 5,7 6,8
Waveforms on - all bad - attachment 5
Waveforms off - all p+n better - attachment 6
14:54 interlock removed from AC mains relay
Also noticed adaptor board on 2 not in fully -> Now in
p+n generally better - attachment 7
Without waveforms - p+n better again - attachment 8
16:04 Platform moved into position
Interlock power cable removed from extension lead
w/ waveform - p+n slightly worse
w/o waveform - p+n same as beffore
16:14 LK3 removed from 1 and 5
w/ waveform -> p+n slightly worse - attachment 9
w/o waveform -> p+n best yet - attachment 10
16:33 LK1 wasn't on all n+n was only on 2, 6 and 8
Removed from 6 -> only one LK1 per DSSD
w/ waveforms - all bad - attachment 11
w/o waveforms - no change - attachment 12
16:59 LK1 removed from 2->4 This is the FEE with the BIAS braid
w/ waveform p+n better - attachment 13
w/0 waveform p+n better, n+n worse? - attachment 14
17:21 Bias filters added to n+n
w/ waveform - no change - attachment 15
w/o wwaveofrm - P=n worse - attachment 16
Stats 0x21 - attachment 17
Stats 0x14 - attachment 18
Stats 0x12 - attachment 19
17:42 Bias filter removed and bias floated (LK1 removed)
w/ waveform all worse - attachment 20
w/o waveform -> p+n worse, n+n similar
18:29 LK1 back on 4+8
w/ waveform -> poor
w/0 waveform - recovered previous - attachment 20
18:32 LK 2 and 4 removed from 2 +6
Also noticed ground lemo on aida02 not fully inserted which has been corrected
w/ waveform poor - attachment 21
Threshold 0xF - attachment 22
w/o waveform - attachment 23 |
Tue Jun 14 12:15:33 2022, NH, S450 Archived
|
All MIDAS files for S450 (/TapeData/S450) have been copied to lustre and archived |
Mon Jun 13 16:38:37 2022, NH, Mon 13 Jun
|
Remove Caen HV Supply
Open up, C23 was grounded (HV grounded in NIM)
Remove C23 (HV floating at NIM) and reinstall
Rebias HV... No Change
Reboot AIDA... No change |
Fri Jun 10 10:32:46 2022, NH, Fri 10 Jun 8x
|
Probe PSU output with 'scope again and 10X probe
Use a AC mains scope as was available, means referenced to ground of AC, but should be ground of platform (and hence Fee64)
Figs 1-3: Traces of PSU outputs (5V, -6V, 5V Return) with 10X probe, 1 MOhm impedance AC coupled
Lots of fluctuation and jitter
Figs 4-6: DC 1MOhm output from all 3 power rails
Fig 7-8: Small "loop" using probe and observed scope spectra.
After lunch ideas:
- Try again with 1X probe attenuation, maybe record output to USB
- Remove unconnected MACBs from master
- |
Wed Jun 8 09:55:28 2022, NH, Weds 8 May 
|
10.30 : Turn off AIDA FEE64s
Prepare a ground cable for snout - M10 terminal on one end for copper bar. Will affix with Cu tape for now (no free screws)
Plan for today:
Remove extraneous ground cables
Check ground of all FEE64s esp. 05 and 07 - include on FEE64 side.
14:42 - Done all grounds seem snug, extra ground cables removed. Try power on and check
Try powering just DSSD1 FEE64s
- No change (aida01 125k, aida02,03,04 - 400k)
Try grounding snout
14:59 Connection to snout very bad as tape does not fix well to thick copper in braid. nO difference either way.
Probe PSU output with Battery DSO if available
- See figure 2
Try shuffling FEE64 power allocation
- 15:32 - Now as 1 X 3 X 2 X 4 X
5 X 7 X 6 X 8 X
(Also FEEs on own pair)
No difference to rates
Multimeter voltages for last socket of PSU1 (paired with aida04):
1 : 6.02 V
2: 6.02 V
3: 6.02 V
4: -6.44 V
5: 7.74 V
Similar on PSU2
Voltage between right (GND) pin 5 and 1 (pin 5 is COM) is -0.4 V, similar if pin 4 is COM. Pin1-3 are 0 V when paired
|
Wed Jun 1 08:00:18 2022, TD, 2xDSSSDs spectra layouts
|
Spectra layouts for 2x DSSSDs can be found in directory ~/LayOut/2xDSSSDs |
Wed Jun 1 07:35:13 2022, TD, Wednesday 1 June 15x
|
Attachment 1 - DSSSD bias & leakage current - OK
Attachment 2 - ADC data item stats
Attachment 3 - FEE64 temps - OK
Attachments 4-7 - aida01, 02, 03 & 04 2.*.W spectra
Noise observed for asics #1 & #2 of aida02 consistent with no cable attached - confirmed by visual inspection - ribbon cable disconnected from Samtec header of adaptor PCB
To Do list
1) re-connect ribbon cable to aida02 adaptor PCB
2) good quality ground to snout - use screws at inter-stage
3) install heavy duty grounds
4) ...
Attachment 8 - adc data item stats - slow comparator 0x64
Attachment 9 - per FEE64 rate spectra - slow comparator 0x64
Attachment 10 - per FEE64 rate spectra - slow comparator 0xa
-
13:30 - Attach heavy duty ground to AIDA
Attachment 11 - per FEE64 rate spectra - slow comparator 0xa
Try power cycle as system ground changed significantly now
Try to reattach aida04 TTY connector - still wrong
Archive old tty logs (ttyUSB*) to zip and delete them, makes easier to track startup
Attachment 12 - per FEE64 rate spectra - slow comparator 0xa
No major difference, aida01 quieter than before
aida05 has some missing channels - loose ERNI?
Attachements 13 & 14 - Waveforms
Temporarily raise to 0x64 and test merger for DTAS synchro test later... all works good to MBS
Change NETVAR MERGE.LinksAvailable to 8
Notice one copper screw touching aluminium, add some kapton tape behind it to isolate it. No difference
Voltage diff between aida02,aida06 < 1 mV
Voltage diff between copper bars < 0.5 mV (but not 0)
A comment from DTAS people that they observed a large increase in noise recently - perhaps from accelerator
May indicate current power/gronud oddities?
Attachment 15 - Rates at 0x1f (= 310 keV)
DSSSD#1 reasonable (aida04 a bit bad), but mostly just pulser (25 Hz)
DSSSD#2 much worse esp. p+n sides (aida05, aida07)
ERNI connectors pushed in and feel fully in |
Tue May 31 17:09:35 2022, TD, Tuesday 31 May 20x
|
2x MSL type BB18(DS)-1000 installed
Adaptor PCB LK config
all FEE64s LK2, LK4 fitted
n+n FEE64s LK1 fitted
bottom p+n FEE64s LK3 fitted
AIDA PSU config
top 1-3 2-4
bottom 5-7 6-8
DSSSD bias -> p+n FEE64 core, n+n FEE64 braid
Heavy duty grounds not connected to FEE64 adaptor PCBs
ASIC settings 2021Apr29-13-16-00
slow comparator 0xa
BNC PB-5 settings
amplitude 1.000V
attenuation x1
tau_d 1ms
frequency 25Hz
polarity +
Attachment 1 - DSSSD bias & Leakage current - OK
Attachment 2 - FEE64 temps OK
Attachment 3 - adc data item stats
Attachments 4-9 - system wide checks OK *except* aida07 fails ADC calibration
Attachments 10 & 11 - 1.8.W spectra 20us FSR
Attachments 12 & 13 - 1.8.L spectra - aida03 pulser peak width 155 ch FWHM
Attachment 14 - per FEE64 rate spectra
19.15 Attachments 15-18 - 2*W spectra for aida01, 02, 03 &04
Attachment 19 - per FEE64 rate spectra
Attachment 20 - adc data item stats |
Tue May 31 09:05:00 2022, NH, TD, Tuesday 31 May
|
DSSD stack will be as follows
1 3208-7 1019 125 upstream
2 3208-13 1020 120 downstream
First start checking bias pins on both detectors
These are pins on the *bottom right* of each 68 pin connector (C-2299)
Expect finite resistance
3208-7:
Top and bottom: 22 Ohm
Left and right: 22 Ohm
3208-13:
Top and bottom: 22 Ohm
Left and right: 22 Ohm
Conclusion: All bias bond wires are intact on both DSSDs
Visual inspection is both DSSDs look good with no damage or bond wire issues
Installed in snout: full stack
3 mm bPlas 1
17 mm Air
1 mm AIDA 1 (645 mm from base of snout)
9 mm Air
1 mm AIDA 2 (655 mm from base of snout)
12 mm Air
3 mm bPlas 2 |
Wed May 25 14:28:26 2022, NH, Wed 25 May
|
The n+n FEEs were all removed to adjust the platform back to the single configuration
After some confusion we found the orientation of the frame to position the single detectors and moved back
Faulty AIDA cards aida05 and aida14 were removed to be returned backi (ASIC damage)
The cables for aida10 and aida12 were moved back to the left-right side and the n+n cards were installed and reocnnected
p+n cards moved to bring aida11 and aida09 above aida03/aida07 and aida01/aida05. Also move a different card to replace old aida05
While doing this it was noticed the HDMI for aida13 was very loose and actually fell off (I guess the cable was pulled incorrectly)
It has been removed and will eb sent back to be resoldered
The copper grounding bars and ITEM frame were removed due to conflicting with the single snout layout
The bolts are slightly too short to hold the frame where it won't conflict so we loko for longer bolts to reattach the system
Some new ground cables will be made to reach the extra n+n FEEs
Aida13-Aida16 removed from the PSU
fig1: layout of snout frame in "single" mode (alu block configuration)
MAC Addresses
aida01 - ba-8a
aida05 - 0d:15
aida09 - ee-01
aida04 - f6-b7
aida08 - ba-2b
aida12 - ba:89
aida03 - d8-21
aida07 - 41:b4:0c
aida11 - f6-5a
aida02 - ba:22
aida06 - ee:72
aida10 - cf-ac [mistakenly swapped with aida12]
Second switch will stay in S4 and has now been screwed in properly below the switch 1 and the hdmi cables entrance
DHCP *not* updated
Relay is powered *off* so FEEs cannot be turned on, alL HV channels disabled
Tomorrow is a holiday so no work will be happening @ GSI |
Tue May 24 08:35:00 2022, NH, Tue 24 May
|
09:00 - Remove bias of DSSDs and pwoer of FEEs
Remove snout from S4 so DEGAS frame can be mechnically removed
Snout now in FRS Messhuette |
Mon May 23 16:41:45 2022, TD, Monday 23 May  
|
17.40 DAQ stopped
Attachment 1 - DSSSD bias & leakage current
Attachment 2 - grafana DSSSD bias, leakage current - OK, temp data has ceased
Attachment 3 - FEE64 temps - OK |
Sun May 22 14:12:55 2022, TD, Sunday 22 May  
|
15.11 DAQ stopped
Attachment 1 - DSSSD bias & leakage current
Attachment 2 - grafana DSSSD bias, leakage current - OK, temp data has ceased
Attachment 3 - FEE64 temps - OK |
Sat May 21 15:30:45 2022, TD, Saturday 21 May  
|
16.31 DAQ stopped
Attachment 1 - DSSSD bias & leakage current
Attachment 2 - grafana DSSSD bias, leakage current - OK, temp data has ceased
Attachment 3 - FEE64 temps - OK |
Fri May 20 16:22:01 2022, TD, Friday 20 May  
|
17.20 DAQ stopped
Attachment 1 - DSSSD bias & leakage current
Attachment 2 - grafana DSSSD bias, leakage current & temp - OK
Attachment 3 - FEE64 temps - OK |
Thu May 19 17:00:46 2022, TD, Thursday 19 May   
|
18.01 DAQ stopped
Attachment 1 - grafana DSSSD bias, leakage current & temp - OK
Attachment 2 - DSSSD bias & leakage current
Attachment 3 - FEE64 temps - OK
Attachment 4 - ADC data item stats |