AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 12 of 36  ELOG logo
  ID Date Author Subjectdown Text Attachments
  19   Thu Jan 24 10:26:09 2019 VP, TD, CA, NHStart up Merger1) Click on item "Merger MK2" in top panel
   This kills any existing Merger existence
and loads a new copy.
 merger_screenshot.png 
  274   Sat Apr 24 04:50:01 2021 MLSpectraSome screenshot of spectra attached  8x 
  30   Thu Mar 21 15:45:48 2019 NH, AS, SA, MPSnout Mounting & DSSD BiasThe AIDA snout (with single DSSD and plastic)
has been mounted in S4 cave again. DSSD was
connected to the outer 4 FEEs again.
 LeakageBias.png 
  5   Wed Sep 19 12:40:41 2018 OH, TDSingle DSSD Installation and TestsOn the 18th of September we installed DSSD
3208-14
 21x 
  417   Mon May 2 09:52:20 2022 OHShifter checklist 2022Every 30 minutes:

- Reload statistics (Web browser tab screen
  
  230   Fri Apr 16 11:42:45 2021 OHShifter checklistEvery 30 minutes:

- Reload statistics (Web browser tab screen
  
  446   Sat May 14 03:14:00 2022 PPShift Checks4:13

AIDA stats OK

Leakage current OK
 8x 
  712   Wed Jul 23 13:59:37 2025 CC, NKShielding of the snoutAttachment1: AIDA05.1.8L when AIDA05 connected,
biased at 100 V with not-shielded cables,
CAEN HT,  after the base of the
 Screenshot_from_2025-07-23_15-07-42.png 
  14   Mon Dec 10 11:09:53 2018 CA, TDScintillator pictures/system checks for 07.12.1811.12 System wide checks ok (attachment 1)
      FEE temperatures ok (attachment 2)
      bias/leakage currents ok (attachment
 14x 
  194   Fri Mar 12 23:56:00 2021 OHSaturday March 13th 00:00-08:0024:00 Joined in with TD to debug the dropout
of AIDA05 - See https://elog.ph.ed.ac.uk/DESPEC/193
      After both powercycles and telnet reboots
 11x 
  301   Sat May 8 09:05:04 2021 TDSaturday 8 May
09.54 FEE64 temperatures OK - attachment
1
 27x 
  642   Sat Jun 8 13:22:36 2024 TDSaturday 8 June
14.09 aida02 WR stall
      DAQ STOP
 24x 
  422   Sat May 7 09:55:53 2022 TDSaturday 7 May
Attachments 1 & 2 per FEE64 1.8.L spectra
 15x 
  175   Sat Mar 6 06:52:06 2021 OH, LSSaturday 6th March07:50 Pulser settings - attachment 1

07:52 System wide checks all ok
 30x 
  357   Sat Jun 5 11:20:15 2021 TDSaturday 5 June
12.25 DAQ continues OK - file S496/R32_48
      alpha background
 9x 
  627   Sat May 4 07:36:07 2024 TDSaturday 4 May
08.32 DSSSD bias & leakage currents - Grafana
- attachments 1-2
 11x 
  351   Sat May 29 13:13:45 2021 TDSaturday 29 May14.10 DAQ continues - file S496/R18_539
      alpha background
 9x 
  499   Sat Jun 25 06:55:07 2022 MSSaturday 25 June 2022 8:00-16:00Took over the night shift from Tom.

7:00 The beam is back.

8:00 : attachments 1-3
 15x 
  500   Sat Jun 25 17:06:42 2022 BA, AASaturday 25 June 2022 16:00-00:00Took over the night shift from Magda

 

18:00 : attachments 1-3
 9x 
  498   Fri Jun 24 22:36:45 2022 TDSaturday 25 June 00:00-08:00
23:36 Check ASIC contorol
      Zero stats & all histograms
 31x 
ELOG V3.1.4-unknown