|
ID |
Date |
Author |
Subject |
Text |
 |
|
19
|
Thu Jan 24 10:26:09 2019 |
VP, TD, CA, NH | Start up Merger | 1) Click on item "Merger MK2" in top panel
This kills any existing Merger existence
and loads a new copy.
|
|
|
274
|
Sat Apr 24 04:50:01 2021 |
ML | Spectra | Some screenshot of spectra attached |
8x |
|
30
|
Thu Mar 21 15:45:48 2019 |
NH, AS, SA, MP | Snout Mounting & DSSD Bias | The AIDA snout (with single DSSD and plastic)
has been mounted in S4 cave again. DSSD was
connected to the outer 4 FEEs again. |
|
|
5
|
Wed Sep 19 12:40:41 2018 |
OH, TD | Single DSSD Installation and Tests | On the 18th of September we installed DSSD
3208-14
|
21x |
|
417
|
Mon May 2 09:52:20 2022 |
OH | Shifter checklist 2022 | Every 30 minutes:
- Reload statistics (Web browser tab screen |
|
|
230
|
Fri Apr 16 11:42:45 2021 |
OH | Shifter checklist | Every 30 minutes:
- Reload statistics (Web browser tab screen |
|
|
446
|
Sat May 14 03:14:00 2022 |
PP | Shift Checks | 4:13
AIDA stats OK
Leakage current OK |
8x |
|
712
|
Wed Jul 23 13:59:37 2025 |
CC, NK | Shielding of the snout | Attachment1: AIDA05.1.8L when AIDA05 connected,
biased at 100 V with not-shielded cables,
CAEN HT, after the base of the |
|
|
14
|
Mon Dec 10 11:09:53 2018 |
CA, TD | Scintillator pictures/system checks for 07.12.18 | 11.12 System wide checks ok (attachment 1)
FEE temperatures ok (attachment 2)
bias/leakage currents ok (attachment |
14x |
|
194
|
Fri Mar 12 23:56:00 2021 |
OH | Saturday March 13th 00:00-08:00 | 24:00 Joined in with TD to debug the dropout
of AIDA05 - See https://elog.ph.ed.ac.uk/DESPEC/193
After both powercycles and telnet reboots |
11x |
|
301
|
Sat May 8 09:05:04 2021 |
TD | Saturday 8 May |
09.54 FEE64 temperatures OK - attachment
1
|
27x |
|
642
|
Sat Jun 8 13:22:36 2024 |
TD | Saturday 8 June |
14.09 aida02 WR stall
DAQ STOP
|
24x |
|
422
|
Sat May 7 09:55:53 2022 |
TD | Saturday 7 May |
Attachments 1 & 2 per FEE64 1.8.L spectra
|
15x |
|
175
|
Sat Mar 6 06:52:06 2021 |
OH, LS | Saturday 6th March | 07:50 Pulser settings - attachment 1
07:52 System wide checks all ok
|
30x |
|
357
|
Sat Jun 5 11:20:15 2021 |
TD | Saturday 5 June |
12.25 DAQ continues OK - file S496/R32_48
alpha background
|
9x |
|
627
|
Sat May 4 07:36:07 2024 |
TD | Saturday 4 May |
08.32 DSSSD bias & leakage currents - Grafana
- attachments 1-2
|
11x |
|
351
|
Sat May 29 13:13:45 2021 |
TD | Saturday 29 May | 14.10 DAQ continues - file S496/R18_539
alpha background
|
9x |
|
499
|
Sat Jun 25 06:55:07 2022 |
MS | Saturday 25 June 2022 8:00-16:00 | Took over the night shift from Tom.
7:00 The beam is back.
8:00 : attachments 1-3 |
15x |
|
500
|
Sat Jun 25 17:06:42 2022 |
BA, AA | Saturday 25 June 2022 16:00-00:00 | Took over the night shift from Magda
18:00 : attachments 1-3 |
9x |
|
498
|
Fri Jun 24 22:36:45 2022 |
TD | Saturday 25 June 00:00-08:00 |
23:36 Check ASIC contorol
Zero stats & all histograms
|
31x |