  474   Tue May 31 09:05:00 2022 NH, TDTuesday 31 May
DSSD stack will be as follows

1      3208-7  1019       125              upstream
2      3208-13 1020       120              downstream

First start checking bias pins on both detectors
These are pins on the *bottom right* of each 68 pin connector (C-2299)
Expect finite resistance

3208-7: 
  Top and bottom: 22 Ohm
  Left and right: 22 Ohm

3208-13:
  Top and bottom: 22 Ohm
  Left and right: 22 Ohm

Conclusion: All bias bond wires are intact on both DSSDs

Visual inspection is both DSSDs look good with no damage or bond wire issues

Installed in snout: full stack

3 mm bPlas 1
17 mm Air
1 mm AIDA 1  (645 mm from base of snout)
9 mm Air
1 mm AIDA 2 (655 mm from base of snout)
12 mm Air
3 mm bPlas 2
  473   Wed May 25 14:28:26 2022 NHWed 25 May
The n+n FEEs were all removed to adjust the platform back to the single configuration

After some confusion we found the orientation of the frame to position the single detectors and moved back

Faulty AIDA cards aida05 and aida14 were removed to be returned backi (ASIC damage)

The cables for aida10 and aida12 were moved back to the left-right side and the n+n cards were installed and reocnnected

p+n cards moved to bring aida11 and aida09 above aida03/aida07 and aida01/aida05. Also move a different card to replace old aida05

While doing this it was noticed the HDMI for aida13 was very loose and actually fell off (I guess the cable was pulled incorrectly)
It has been removed and will eb sent back to be resoldered 

The copper grounding bars and ITEM frame were removed due to conflicting with the single snout layout
The bolts are slightly too short to hold the frame where it won't conflict so we loko for longer bolts to reattach the system
Some new ground cables will be made to reach the extra n+n FEEs

Aida13-Aida16 removed from the PSU 

fig1: layout of snout frame in "single" mode (alu block configuration)


MAC Addresses

aida01 - ba-8a
aida05 - 0d:15
aida09 - ee-01

aida04 - f6-b7
aida08 - ba-2b
aida12 - ba:89 

aida03 - d8-21
aida07 - 41:b4:0c
aida11 - f6-5a

aida02 - ba:22
aida06 - ee:72
aida10 - cf-ac [mistakenly swapped with aida12]

Second switch will stay in S4 and has now been screwed in properly below the switch 1 and the hdmi cables entrance

DHCP *not* updated

Relay is powered *off* so FEEs cannot be turned on, alL HV channels disabled

Tomorrow is a holiday so no work will be happening @ GSI
  472   Tue May 24 08:35:00 2022 NHTue 24 May
09:00 - Remove bias of DSSDs  and pwoer of FEEs

Remove snout from S4 so DEGAS frame can be mechnically removed

Snout now in FRS Messhuette 
  471   Mon May 23 16:41:45 2022 TDMonday 23 May
17.40 DAQ stopped

Attachment 1 - DSSSD bias & leakage current

Attachment 2 - grafana DSSSD bias, leakage current - OK, temp data has ceased

Attachment 3 - FEE64 temps - OK
  470   Sun May 22 14:12:55 2022 TDSunday 22 May
15.11 DAQ stopped

Attachment 1 - DSSSD bias & leakage current

Attachment 2 - grafana DSSSD bias, leakage current - OK, temp data has ceased

Attachment 3 - FEE64 temps - OK
  469   Sat May 21 15:30:45 2022 TDSaturday 21 May
16.31 DAQ stopped

Attachment 1 - DSSSD bias & leakage current

Attachment 2 - grafana DSSSD bias, leakage current - OK, temp data has ceased

Attachment 3 - FEE64 temps - OK
  468   Fri May 20 16:22:01 2022 TDFriday 20 May
17.20 DAQ stopped

Attachment 1 - DSSSD bias & leakage current

Attachment 2 - grafana DSSSD bias, leakage current & temp - OK

Attachment 3 - FEE64 temps - OK
  467   Thu May 19 17:00:46 2022 TDThursday 19 May
18.01 DAQ stopped

Attachment 1 - grafana DSSSD bias, leakage current & temp - OK

Attachment 2 - DSSSD bias & leakage current

Attachment 3 - FEE64 temps - OK

Attachment 4 - ADC data item stats
  466   Wed May 18 15:29:50 2022 TDWednesday 18 May
      file no storage mode, no MBS data transfer

      ADC control register 0x0 

      std disc outputs disabled

      ASIC settings 2021Apr29-13-16-00
       slow comparator 0xa

      BNC PB-5 settings
      amplitude 1.000V
      attenuation x1
      tau_d 1ms
      frequency 2Hz
      polarity +

Attachment 1 - DSSSD bias & leakage current

Attachment 2 - grafana DSSSD bias, leakage current & temp - OK

Attachment 3 - ADC data item stats

Attachment 4 - FEE64 temps - OK

16.35 zero all histograms
      zero statistics
      zero NewMerger statistics

      ASIC check control - all FEE64s, all ASICs

      baseline counters
      system wide checks - all OK *except* aida07 WR error 0x10

Attachment 5 - per FEE64 rate spectra

Attachmnents 6 & 7 - per FEE64 1.8.W spectra 20us FSR
  465   Tue May 17 16:53:20 2022 TDTuesday 17 May 16.00-00.00
17.35 zero all histograms
      zero statistics
      zero NewMerger statistics

      ASIC check control - all FEE64s, all ASICs

      file no storage mode, no MBS data transfer

      ADC control register 0xff

      all disc outputs disabled

      ASIC settings 2021Apr29-13-16-00
       slow comparator 0x80

      BNC PB-5 settings
      amplitude 1.000V
      attenuation x1
      tau_d 1ms
      frequency 2Hz
      polarity +

Attachment 1 - grafana DSSSD bias, leakage current & temp - OK

Attachments 2-10 - NewMerger stats

Attachments 11-13 - iptraf, TapeServer, NewMerger

Attachment 14 - per Fee64 rate spectra

Attachment 15 - lost activity  monitor

Attachment 16 - ASIC settings aida01

Attachments 17-22 - adc, pause, resume & correlation scaler data items, push, flush, aida01 & aida06 stats

Attachment 23 - FEE64 temperatures OK

Attachment 24 - DSSSD bias & leakage current
  464   Tue May 17 06:58:51 2022 OHTuesday 17th May
08:00 Still have beam for the time being.
      Currently on file R4_2049

      FEE Stats - attachment 1
      FEE Temps ok - attachment 2
      Bias and leakage currents - attachment 3
      System wide checks all ok *except aida09 fails clock check with value 6 which is ok*

      Plan for the morning is once beam is lost is Ge group will enter and place source on the snout to perform efficiency measurement.
      Once they have left the area and are taking data a pulser walkthrough will be performed.
      Patrick can then have access to the system

08:16 Beam taken away
      Data taken stopped on file R4_2055
      Will perform a pulser walkthrough now

      Pulser walkthrough started on R5
      1V->0.1V in 0.1V steps
      Pulser setting - attachment 4
      p+n pulser peaks - attachment 5
      n+n pulser "peaks" - attachment 6
  463   Mon May 16 23:02:54 2022 AMTuesday 17th May 00:00-08:00

01:00:     Attachments 1-3, System checks good

03:00:     Attachments 4-6, System checks good

05:00:     Attachments 7-9, System checks good

07:00:     Attachments 10-12, System checks good

  462   Mon May 16 17:23:27 2022 TDNewMerger stats
  461   Mon May 16 15:12:50 2022 RDP, MAMonday 16th May 16:00-00:00

16:00 Took over the shift from Magda.

17:30 Updates: Attached (1-3)

19:30 Updates: Attached (4-6)

21:30 Updates: Attached (7-9)

23:00 Updates: Attached (10-12)

 

 

 

  460   Mon May 16 14:07:06 2022 TDLost activity monitor
  459   Mon May 16 07:03:16 2022 MS, OHMonday 16th May 08:00-16:00

08:00 Took over the night shift from Tom (Attachments 1-3)

10:00: Attachement 4-6

around 10:30: Beam went off (Attachment 7)

11:00: Beam is back

12:00 Attachments 8-10

14:00 Attachements 11-13

15:50 Attachments 14-17

  458   Sun May 15 23:00:08 2022 & TDMonday 16 May 00:00-08:00
00.01 DAQ continues
      file S450/R4_1319

      ADC control register 0xff

      all disc outputs disabled

      ASIC settings 2021Apr29-13-16-00
       slow comparator aida02 & aida04 0x16, aida06 & aida08 0x23, aida12 0xd, all others 0xc

      BNC PB-5 settings
      amplitude 1.000V
      attenuation x1
      tau_d 1ms
      frequency 2Hz
      polarity +

Disk space OK - /media/SecondDrive

[npg@aidas-gsi S450]$ df -h
Filesystem               Size  Used Avail Use% Mounted on
devtmpfs                 7.8G     0  7.8G   0% /dev
tmpfs                    7.8G  389M  7.4G   5% /dev/shm
tmpfs                    7.8G   19M  7.7G   1% /run
tmpfs                    7.8G     0  7.8G   0% /sys/fs/cgroup
/dev/mapper/centos-root   50G   16G   35G  31% /
/dev/sda2               1014M  226M  789M  23% /boot
/dev/sda1                200M   12M  189M   6% /boot/efi
/dev/sde1                7.2T  4.1T  2.8T  61% /media/SecondDrive
/dev/mapper/centos-home  407G   91G  316G  23% /home
tmpfs                    1.6G   52K  1.6G   1% /run/user/1000
/dev/sdd1                7.2T  6.5T  310G  96% /run/media/npg/ThirdDrive

00.03 all histograms zero'd
      system wide checks counter baseline


00.08 check ASIC control - all FEE64s all ASICs

Attachments 1 & 2 - DSSSD bias & Leakage current - OK
                    grafana DSSSD bias, leakage current & temp - OK

Attachment 3 - FEE64 temps OK

Attachments 4-9 - adc, pause, resume & correlation scaler data items, push, flush stats

Attachments 10-16 - TapeServer, NewMerger, NewMerger stats

Attachment 17 - ucesb

04.08

Attachment 18 - DSSSD bias & Leakage current - OK

Attachment 19 - FEE64 temps OK

Attachment 20 - adc data item stats

Attachments 21 - ucesb

system wide checks - all OK *except* aida09 clock fail status 6

06.36

Attachment 22 - DSSSD bias & Leakage current - OK

Attachment 23 - FEE64 temps OK

Attachment 24 - adc data item stats

Attachments 25 - ucesb

system wide checks - all OK *except* aida09 clock fail status 6
  457   Sun May 15 15:51:49 2022 MLSunday 15th May 16:00-0:00

Status at 16:45 (CET)

The expreiment continues to run smoothly.

AIDA Stats look ok - Attachment 1

AIDA Temperature ok - Attachment 2

AIDA Leakage current: ok - Attachment 3

System wide check:

Clock: 13 passed, 1 failed (aida09)

ADC Calibration: 9 passed, 5 fialed (aida2,6,9,10,13)

White rabbit decoder: 14 passed, 0 failed.

FPGA timestamp: 14 passed, 0 failed.

 

Status at 18:45 (CET):

All rates ok on ucesb.

AIDA Stats ok - Attachment 4

AIDA Temperature ok - Attachment 5

AIDA Leakage current: increase slightly - Attachment 6

System wide check: No changes, same as above

 

Status at 20:45 (CET):

All rates ok on ucesb.

AIDA Stats ok - Attachment 7

AIDA Temperature ok - Attachment 8

AIDA Leakage current: increase slightly - Attachment 9

System wide check: No changes, same as above

 

Status at 22:45 (CET):

All rates ok on ucesb.

AIDA Stats ok - Attachment 10

AIDA Temperature ok - Attachment 11

AIDA Leakage current: increase slightly - Attachment 12

System wide check: No changes, same as above

  456   Sun May 15 07:40:52 2022 OHSunday 15th May 08:00-16:00
08:40 FEE Temperatures ok - attachment 1
      FEE statistics - Attachment 2
      Bias and leakage currents ok - attachment 3
      ASIC check ok
      All system wide checks ok - Except aida09 fails clock check with bit 6

11:00 FEE statistics - attachment 4
      FEE temperatures all ok - attachment 5
      BIAS and leakage currents - attachment 6
      ASIC check ok
      All system wide checks as before
      Currently on file R4_1030
      13.1 MB/s to disk
      4.8 million items per second
      
13:13 FEE statistics - attachment 7
      FEE Temperatures all ok - attahcment 8
      Bias and leakage currents ok - attachment 9
      ASIC check ok
      All system wide checks as before
      Currently on file R4_1078
      13.1 MB/s to disk
      4.8 million items per second

15:35 Analysis of R4_1128 - attachment 10
  455   Sat May 14 23:02:33 2022 TDSunday 15 May 00:00-08:00
Pb beam c. 1e+9/spill

00.02 zero all histograms
      system wide checks - baseline counters

00.08 ASIC check control - all FEE64s, all ASICs

Attachment 1 - grafana DSSSD bias, leakage current & temp - OK

Attachments 2 & 3 - ucesb - AIDA DSSSD #1 c. 10-20Hz peak rate on spill, c. 0Hz off spill

Attachment 4 - DSSSD bias & Leakage current - OK

Attachment 5 - FEE64 temps OK

Attachment 6-13 - adc, pause, resume & correlation scaler data items, push, flush, aida01, aida06

Attachments 14-18 - system wide checks - all OK *except* aida09 clock fail status 6

Attachments 19-25 - iptraf, TapeServer, NewMerger, NewMerger stats



00.44 file S450/R4_792

      ADC control register 0xff

      all disc outputs disabled

      ASIC settings 2021Apr29-13-16-00
       slow comparator aida02 & aida04 0x16, aida06 & aida08 0x23, aida12 0xd, all others 0xc

      BNC PB-5 settings
      amplitude 1.000V
      attenuation x1
      tau_d 1ms
      frequency 2Hz
      polarity +

00.51 disk space OK - c. 3' per data file

[npg@aidas-gsi S450]$ ls -l /
total 40
lrwxrwxrwx.   1 root root     7 Oct 18  2021 bin -> usr/bin
dr-xr-xr-x.   5 root root  4096 May 12 18:31 boot
drwxr-xr-x.  23 root root  4100 May 12 18:31 dev
drwxr-xr-x. 145 root root  8192 May 12 18:31 etc
drwxr-xr-x.   4 root root    56 Jan 28 14:56 home
lrwxrwxrwx.   1 root root     7 Oct 18  2021 lib -> usr/lib
lrwxrwxrwx.   1 root root     9 Oct 18  2021 lib64 -> usr/lib64
drwxr-xr-x.   5 root root   113 Apr 28 11:58 media
lrwxrwxrwx.   1 root root    45 Oct 18  2021 MIDAS -> /home/npg/MIDAS_Releases/23Jan19/MIDAS_200119
drwxr-xr-x.   2 root root     6 Apr 11  2018 mnt
drwxr-xr-x.   3 root root    16 Oct 18  2021 opt
dr-xr-xr-x. 464 root root     0 May 12 18:30 proc
dr-xr-x---.  10 root root  4096 May 13 11:47 root
drwxr-xr-x.  44 root root  1360 May 14 06:34 run
lrwxrwxrwx.   1 root root     8 Oct 18  2021 sbin -> usr/sbin
drwxr-xr-x.   2 root root     6 Apr 11  2018 srv
dr-xr-xr-x.  13 root root     0 May 12 18:31 sys
lrwxrwxrwx.   1 root root    28 Apr 28 14:19 TapeData -> /media/SecondDrive/TapeData/
drwxrwxrwt.  40 root root 12288 May 15 00:49 tmp
drwxr-xr-x.  13 root root   155 Oct 18  2021 usr
drwxr-xr-x.  21 root root  4096 Oct 18  2021 var
[npg@aidas-gsi S450]$ df -h
Filesystem               Size  Used Avail Use% Mounted on
devtmpfs                 7.8G     0  7.8G   0% /dev
tmpfs                    7.8G  373M  7.4G   5% /dev/shm
tmpfs                    7.8G   19M  7.7G   1% /run
tmpfs                    7.8G     0  7.8G   0% /sys/fs/cgroup
/dev/mapper/centos-root   50G   16G   35G  31% /
/dev/sda2               1014M  226M  789M  23% /boot
/dev/sda1                200M   12M  189M   6% /boot/efi
/dev/sde1                7.2T  3.1T  3.8T  46% /media/SecondDrive
/dev/mapper/centos-home  407G   91G  316G  23% /home
tmpfs                    1.6G   52K  1.6G   1% /run/user/1000
/dev/sdd1                7.2T  6.5T  310G  96% /run/media/npg/ThirdDrive

Attachment 26 - analysis data file R4_792

Attachments 27-28 - per FEE64 rate & stat spectra - shows distro HEC events

Attachments 29-30 - per FEE64 1.8.L spectra 
 pulser peak widths aida01 134 ch FWHM, aida04 393 ch FWHM

Attachments 31-32 - per FEE64 1.8.H spectra

Attachments 33-34 - aida02 & aida04 1.*.H spectra

04.13

Attachment 35 - DSSSD bias & Leakage current - OK

Attachment 36 - FEE64 temps OK

Attachment 37 - adc data item stats

Attachments 38 - ucesb

system wide checks - all OK *except* aida09 clock fail status 6


07.05

Attachment 39 - DSSSD bias & Leakage current - OK

Attachment 40 - FEE64 temps OK

Attachment 41 - adc data item stats

Attachments 42 - ucesb

system wide checks - all OK *except* aida09 clock fail status 6

Attachments 43-48 - aida02 & aida04 & aida06 & aida08 & 1.*.H spectra
ELOG V3.1.4-unknown