AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 13 of 37  ELOG logo
  ID Date Authordown Subject Text Attachments
  154   Mon Mar 16 01:07:29 2020 TA, AM, ESRegular entry
02:14 all system wide checks okay 

     FEE temperatures okay 
      leakage
currents okay and recorded to spreadsheet
 13x 
  155   Mon Mar 16 05:08:12 2020 TA, AM, ESRegular entry
02:14 all system wide checks okay 

     FEE temperatures okay 
      leakage
currents okay and recorded to spreadsheet
 6x 
  660   Thu Jun 13 21:06:44 2024 Robert Page16:00 to 00:00 shift on 13/6/2024Elog went down around the end of the last
shift, so final screenshots were not uploaded
at that point.
 26x 
  461   Mon May 16 15:12:50 2022 RDP, MAMonday 16th May 16:00-00:0016:00 Took over the shift from Magda.

17:30 Updates: Attached (1-3)

19:30 Updates: Attached (4-6)
 12x 
  246   Mon Apr 19 13:27:08 2021 RDPMonday 19th April 12 noon shift
12.30 There appear to be fewer HEC events
in aida09 cf. aida11 and upstream DSSSDs
 61.pngScreenshot_2021-04-19_Temperature_and_status_scan_aidas-gsi(2).pngScreenshot_2021-04-19_Statistics_aidas-gsi(2).png 
  331   Wed May 19 11:24:55 2021 RDPMonday 19 April 12 noon shiftSystem checks gave 11 passed/1 failed, except
for ADC timimgs: 10 passed/2 failed.
 Screenshot_2021-04-19_Temperature_and_status_scan_aidas-gsi(3).pngScreenshot_2021-04-19_Tape_Service_(Expert)_aidas-gsi.png62.png 
  610   Fri Apr 26 15:34:00 2024 RDP16:00 - 00:00 Friday 26 AprilThis appeared in the system log:

Apr 26 16:30:51 aidas-gsi smartd[1076]:
Device: /dev/sda [SAT], 1 Currently unreadable
 6x 
  313   Thu May 13 19:52:36 2021 Philippos and MarcConnection problemAt 20:15, We lost connection with AnyDesk.

Liliana restarted Anydesk on the
AIDA DAQ PC. All seemed fine on AIDA DAQ
 2021-05-13_ucesb_scalers.png 
  314   Thu May 13 21:21:25 2021 Philippos and Marcsystem wide checksWide checks at Time 22:22 CET

Clock status test result: Passed
16, Failed 0
 13x 
  494   Thu Jun 23 15:10:17 2022 Philippos PapadakisThursday 23 June 16:00-24:0016:20
System wide checks.
Clock status OK
 15x 
  78   Thu Oct 31 19:02:42 2019 PatrickWR Timestamps> All 12 FEEs have valid WR Timestamps
> Had to powercycle aida09 once as before
raw readout was displaying upper 12 bits
  
  651   Tue Jun 11 15:01:07 2024 PP TD16:00-00:00 shift Tuesday 11/06/24All seems OK

Screenshots attached.
 13x 
  446   Sat May 14 03:14:00 2022 PPShift Checks4:13

AIDA stats OK

Leakage current OK
 8x 
  590   Tue Apr 23 07:27:18 2024 PP08:00-16:00 Tuesday 24 April shiftChecks 08:00-08:30

Screenshots are attached and everything
looks OK.
 8x 
  591   Tue Apr 23 09:21:01 2024 PP10:20 checks - aida02 is downAida02 is down. Contacted Nick.

The rest looks stable, see screenshots.

10:53 CEST (NH): Rebooted aida02
 8x 
  592   Tue Apr 23 10:10:31 2024 PPaida02 is backNick rebooted AIDA and aida02 came back
at around 10:55.

AIDA was out of the DAQ from about
  
  593   Tue Apr 23 10:52:39 2024 PPAida02 down and backWe lost aida02 at about 11:25 again. Nick
fixed it about 11:50.

It is now back in the DAQ.
  
  594   Tue Apr 23 11:09:00 2024 PP12:00 checksEverything is OK now.

Screenshots attached.
 8x 
  597   Tue Apr 23 13:15:43 2024 PP14:00 checksAll looks good.

Screenshots attached
 8x 
  599   Tue Apr 23 19:23:42 2024 PP20:30 checksAll looks good.

Screenshots attached.
 8x 
ELOG V3.1.3-7933898