AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 18 of 36  ELOG logo
Entry  Sun May 15 07:40:52 2022, OH, Sunday 15th May 08:00-16:00 10x
08:40 FEE Temperatures ok - attachment 1
      FEE statistics - Attachment 2
      Bias and leakage currents ok - attachment 3
Entry  Tue May 17 06:58:51 2022, OH, Tuesday 17th May 6x
08:00 Still have beam for the time being.
      Currently on file R4_2049
Entry  Sun Jun 19 12:36:10 2022, OH, Sunday 19th June 1.jpg2.jpg3.jpg4.jpg220618_1753_stats_no_waveform.png
Yesterday the sum/inverter was found to be a considerable source of noise in the system.

Plugging it into an oscilloscope this morning it was clear there was a Vpp 17mv 60kHz sin wave in its signal - attachment 1 yellow trace
Entry  Thu Jun 23 06:56:02 2022, OH, Thursday 23 June 08:00-16:00 11x
07:56 Taken over from AM
      Current White Rabbit Error status:
        Base  Current  Difference
Entry  Fri Jun 24 06:56:06 2022, OH, Friday 24 June 008:00-16:00 16x
07:56 Took over from AM. No issues reported overnight
      Stats ok - attachment 1
      Temperature ok - attachment 2
Entry  Mon Jun 27 06:45:22 2022, OH, Monday 27th June 08:00-16:00 220626_0830_Stats.png220626_0830_Temp.png220626_0831_Bias.pngR5_770_analysis.txt
07:45 Spoke to David and the beam has been gone since about 05:30
      Reason for the loss of beam is a vacuum issue before the FRS
      They are waiting for the experts
Entry  Fri Jun 14 15:00:47 2024, Norah , Muneerah, 16:00-20:00 Friday 14 June  13x
Everything appears to be running smoothly. Attachments 1-4 were taken around 16:00

DSSSD Bias & Leakage Current - Check: OK (see attachment 1)
FEE64 Temperature - Check: OK (see attachment 2)
Entry  Fri Apr 26 07:01:26 2024, Norah, 08:00 - 16:00 Friday 26 April Screenshot_from_2024-04-26_10-00-39.pngScreenshot_from_2024-04-26_10-02-35.pngScreenshot_from_2024-04-26_10-04-40.pngScreenshot_from_2024-04-26_10-06-18.pngScreenshot_from_2024-04-26_10-09-52.png
10:00 Checks:

All seems smooth.

DSSD bias and  leakage current ( Attachment 1)
Entry  Sat Apr 27 15:13:06 2024, Norah, 16:00 - 00:00 Saturday 27 April  15x
14:50 Checks

Leakage current  is 20.021 and HV status is Max Voltages ! Is it normal ? - attachments 1

It is quite warm at GSI today and this may be a temperature effect. Hopefully will go down latter in the day (Marc). Any way let's kep an
    Reply  Fri Nov 1 14:17:15 2019, Nic, Patrick, Reply: WR Timestamps 
> > All 12 FEEs have valid WR Timestamps
> > Had to powercycle aida09 once as before raw readout was displaying upper 12 bits of WR timestamp as 0. Unsure of other method.
> > 
    Reply  Thu Nov 7 10:22:26 2019, Nic, Patrick, Reply: WR Timestamps 
> > > All 12 FEEs have valid WR Timestamps
> > > Had to powercycle aida09 once as before raw readout was displaying upper 12 bits of WR timestamp as 0. Unsure of other method.
> > > 
Entry  Tue Mar 26 14:58:09 2019, NH, VP, How to reset merger  
If the merger doesn't show "xfer Links => Merger" at the top, it is probably the merger setting has been corrupted somehow. This is
how to reset it

  If you go to the web page from which you started the Merge and TapeServer
Entry  Tue Mar 12 16:16:49 2024, NH, TD, JB, HA, Summary of DSSSD Biasing 12.03 
DSSD#1 undergoes a breakdown at 90V, two of the three wafers show this
- The adapter PCBs themselves have no breakdown at 100V, indicating the   issue is internal to the snout
Entry  Fri Dec 20 12:04:03 2019, NH, TD, Friday 20 December 2019 7x
Fig 1: DSSD Leakage currents ok

Fig 2: FEE Temps ok
Entry  Sat Apr 24 13:25:23 2021, NH, TD, AIDA FEE64 crash log for S460 

https://docs.google.com/spreadsheets/d/1CyL5L-WLsh9fsS7CN989GC3ktqiPQOkG8YIDJrrGxYA/edit#gid=0
Entry  Tue Aug 17 12:39:25 2021, NH, TD, AIDA Noise 16x
Investigate noise situation of AIDA (no DSSSDs connected)

Figs 1-6: Waves, Pulser Peaks + Widths *before* any changes
Entry  Mon Mar 7 12:20:26 2022, NH, TD, AIDA Grounding Checks Mon 7 Mar 14x
Remove all DSSD ribbon cable braid ground from FEE64s to check n+n ground loops

Removing all on n+n side only and test resistance to ground: 4, 6 and 8 show continuity to ground, 2 shows no connection (braid ring terminal to copper
Entry  Tue May 31 09:05:00 2022, NH, TD, Tuesday 31 May 
DSSD stack will be as follows

1      3208-7  1019       125              upstream
    Reply  Mon Jul 8 16:02:52 2019, NH, PJCS, Aida 28/6/2019 - WATER OFF 
It occurs to to wonder if there is now water inside the modules. If the metal of the cooling plates is damp on the outside then it is safe to assume
there is water on the inside too . Can I suggest that one  of the modules is dismounted, disassembled and checked?

Patrick
    Reply  Wed Feb 19 10:58:29 2020, NH, PJCS, Report: aida09 Kernel Panic & Lost WR  
> aida09 crashed over the weekend and automatically rebooted.
> After the reboot the WR timestamp sent to the merger is in the future and hence incorrect
ELOG V3.1.4-unknown