ID |
Date |
Author |
Subject |
Text |
 |
|
433
|
Thu May 12 16:30:47 2022 |
NH, OH, TD | Notes for mounting a second switch | Update DHCPD as expected
Make sure new ethernet device is trusted
in firewall
|
|
|
93
|
Tue Nov 12 13:59:07 2019 |
NH, OH, CA | Awfully noisy waveforms | Rates in all FEEs much higher than before
- waveform shows very noisy in all systems.
- attachment 1
|
8x |
|
94
|
Tue Nov 12 14:10:18 2019 |
NH, OH, CA | Aida10 Unusual Pulser Peak | aida10 (no alpha rate recorded) has a strange
pulser peak - looks like double peak?
Pulser terminator checked and OK... |
  |
|
385
|
Wed Oct 20 13:26:08 2021 |
NH, OH | AIDA Noise + Filtering | Turn on AIDA (SL6) to investigate noise situation
and impact of new RC filters on bias input
|
6x |
|
509
|
Wed Jun 29 10:48:26 2022 |
NH, OH | AIDA Dismounted | All detectors removed from single and triple
AIDA snouts
|
|
|
545
|
Fri Mar 22 07:34:54 2024 |
NH, JB | Au Beam | |
|
|
550
|
Tue Mar 26 10:32:05 2024 |
NH, JB | Tue 26 March | Taken 4 FEE64s from CRYRING (the 4 easiest
to access)
41:d8:2b
|
9x |
|
213
|
Fri Apr 9 16:45:29 2021 |
NH, HA. GA, GZ, OH, TD | AIDA Noise | AIDA snout was reconnected and we saw originally
a very good reduction in noise from S452
(fig 1)
|
6x |
|
415
|
Wed Apr 27 15:47:46 2022 |
NH, HA, SA, CJ | AIDA 27 Apr 22 | Remount snout in S4 (photos to come)
Alignment with DEGAS OK but a bit short...
DEGAS platform will be brought 31 mm closer |
7x |
|
674
|
Mon Dec 9 12:28:01 2024 |
NH, CC, MP | Test of BB7 on AIDA Electronics | BB7 connected to aida07, sitting in a cardboard
box
|
|
|
632
|
Wed May 22 20:10:19 2024 |
NH, CC, HMA, MV, ZC, KZ | AIDA Snout Remounted | AIDA and the Snout have been remounted in
S4
|
9x |
|
30
|
Thu Mar 21 15:45:48 2019 |
NH, AS, SA, MP | Snout Mounting & DSSD Bias | The AIDA snout (with single DSSD and plastic)
has been mounted in S4 cave again. DSSD was
connected to the outer 4 FEEs again. |
|
|
544
|
Thu Mar 21 15:41:49 2024 |
NH, AM, MP, CC | Thu Mar 21 | Fig 1-3: Noise situation at real thresholds
(0xa p+n, 0xf n+n)
|
6x |
|
546
|
Fri Mar 22 08:22:43 2024 |
NH, AM, MP, CC | Thu Mar 21 | > Fig 1-3: Noise situation at real thresholds
(0xa p+n, 0xf n+n)
>
|
|
|
47
|
Wed Apr 10 12:33:58 2019 |
NH VP | AIDA Firmware Update | All AIDA modules have been updated to a
new firmware 0xd330701 which should fix the
merger issues. |
 |
|
107
|
Mon Dec 16 14:48:02 2019 |
NH TD | AIDA 16.12.19 | DSSD Snout was reassembled to install the
second bPlast (downstream)
(fig 1)
|
    |
|
406
|
Wed Mar 9 10:15:56 2022 |
NH TD | Wednesday 9 March - noise tests contd. | 11.15 - S4 is currently closed no access
If access possible (should be) plan is
|
38x |
|
427
|
Tue May 10 07:41:28 2022 |
NH TD | Tuesday 10 May | 8:15am S4 CONTROLLED ACCESS to remove beam
plug and check bPlas/AIDA response to beam
|
29x |
|
87
|
Tue Nov 5 10:02:45 2019 |
NH PJCS | Report: aida10 database corruption | This looks like the Options not the ASIC
data. That will be in the CONTENTS file of
the FEE64 named directory within the dated |
|
|
88
|
Tue Nov 5 10:32:21 2019 |
NH PJCS | Report: aida10 database corruption | Hi, see the attached files in the original
comment. I think the BACKUPCorrupt is quite
old now. |
|
|