Entry  Wed Jun 12 11:06:55 2024, PP, Mid-shift checks, 12:00 8x
All seems normal.

Screenshots attached.
Entry  Wed Jun 2 14:53:05 2021, OH, TD, Merger/Tapeserver issues after reboot of aida-3 6x
On 01/06/21 aida-3 was rebooted as the graphical user interface had frozen.
We were also unable to connected to MIDAS via ssh port forwarding.
Entry  Mon Mar 25 14:44:33 2019, NH, Merger issues Temps.pngAIDARUNv2.pngMergerv2.pngTapev2.pngMergerConsolev2.png
Plastic electronics have now been installed.

Water is not leaking still.

FEE64s powered on at 15:00 to test MBS connection (fig1: temperatures)
Entry  Wed Apr 3 13:02:19 2024, NH, Merger for 16 FEEs Screenshot_from_2024-04-03_14-15-02.pngScreenshot_from_2024-04-03_14-15-25.pngScreenshot_from_2024-04-03_14-15-36.pngScreenshot_from_2024-04-03_14-15-45.pngScreenshot_from_2024-04-03_14-15-52.png
Changed /MIDAS/Linux/startup/NewMerger

Change parameters -i and -l in master64 to 16 for 16 FEEs
Entry  Thu Oct 31 16:43:03 2019, NH CA TD, Merger & MBS Performance MergerStats.pngMBSRates.pngMergernetworking.pngMergerStatistics.png
Testing merger with 3 DSSDs connected, with thresholds of 10 (slow comparator), 2 (HEC) and 255 (fast discriminator)

Merger handling rate of 1.6 million events per second comfortably. Forwarding to MBS fine.
Entry  Wed May 19 09:06:58 2021, CA, May 16th 00:00 - 08:00 16x
16th May 2021 - 00:00 - 08:00 Shift
Author: CA
Entry  Wed May 19 09:09:27 2021, MS, JS, OH, May 16 08:00-24:00 21x
16th May 08:00 - 12:00 shift
Author: MS
Entry  Thu May 13 07:10:17 2021, CA, TD, May 13th 08:00 - 16:00 shift 34x
08:10 all system wide checks ok *except*

      all FEE64 modules fail ADC calibration
Entry  Tue Mar 9 06:58:14 2021, CA, LS, March 9th 08:00-11:00 shift 23x
08:00 DAQ continues ok - writing to file R13_120

      Merger ok - 4.6M data items/s
Entry  Sun Mar 7 07:23:26 2021, CA, LS, March 7th  14x
08:00 ASIC settings 2019Dec19-16.19.51
      DSSSD#1 slow comparator 0xa
      DSSSD#2 slow comparator 0xa
Entry  Fri Mar 5 23:21:59 2021, CA, OH, March 6th 2021 00:00 - 08:00 shift 18x
00:23 206Hg setting - No beam in AIDA yet

      AIDA not writing to file
Entry  Sat Mar 13 07:08:52 2021, CA, TD, LS, March 13th 08:00 - 17:00 20x
ASIC settings 2019Dec19-16.19.51
      DSSSD#1 slow comparator 0xa
      DSSSD#2 slow comparator 0xa
Entry  Thu Mar 11 23:07:23 2021, CA, March 12th 00:00 - 08:00 shift 15x
00:10 DAQ continues OK - file R30_372

      ASIC settings 2019Dec19-16.19.51
Entry  Tue Mar 9 23:12:17 2021, CA, March 10th 00:00 - 08:00 20x
00:13 beam back, but some spills 'missing'

      DESPEC keeping beam as is, but may stop later if it worsens
Entry  Tue Apr 5 12:46:52 2022, TD, MSL type BB18(DS)-1000 triple - cable lengths 

OH/NH disassembling current AIDA triple snout and DSSSD stack.
Entry  Thu Mar 25 18:04:51 2021, TD, MSL type BB18(DS) 24cm x 8cm cabling & bias configuration MSL_type_BB18(DS)_24cm_x_8cm_configuration.pdf
 
Entry  Thu Oct 12 14:01:43 2023, TD, MSL type BB18 24cm x 8cm DSSSD test - update Screenshot_from_2023-10-12_15-13-30.pngScreenshot_from_2023-10-12_15-17-05.png

DSSSD MSL type BB18 24cm x 8cm 3208-3/3208-21/3208-22
Entry  Thu Oct 21 09:08:41 2021, OH, MIDAS start up messages 8015Startup.txt8115startuptapestart.txtmergerstart.txtdatarelay.txt
 
Entry  Thu Aug 19 10:47:13 2021, TD, MIDAS spectra AIDA_spectra_190821.tar.gz
 
Entry  Thu Dec 19 13:09:32 2019, TD, MIDAS app launcher command lines 

App                          Path
ELOG V3.1.3-7933898