ID Date Authordown Subject
  485   Sun Jun 19 19:55:20 2022 NHaida03 and aida04
aida03 and aida04 seem to stop sending data  quickly

stopping DAQ + merger and restarting got them resending data, but quickly stopped again

both are showing large WR errors that increases approx every second.

Assume HDMI cables not well seated and causing all sorts of odd behaviour
  507   Tue Jun 28 09:37:19 2022 NHTues 28 June 08:00-
Experiment over

10:37 - Stop DAQ & Tape 

S4 enters controlled access and they uncable bPlas

Will dismount AIDA snout after
  511   Tue Aug 30 13:48:32 2022 NHAIDA Single Switch Configuration
The second switch was moved back to CARME so AIDA has been configured back to using a single switch

aida02/aida04/aida06/aida08 updated back to first switch as per https://elog.ph.ed.ac.uk/DESPEC/433

Additionally a ribbon cable is attached to aida01 and aida05 to introduce some noise into the system
  512   Thu Sep 8 12:31:25 2022 NHRetrying AIDA DataAcq v10
Startup AIDA with ribbon cable connected to aida03 and aida07 for noise

Setup and run with waveforms enabled. Discriminators ADC power etc as default

Try to push above 200k as this is where we saw issues before... lowering threshold to 0x3 pushes rates to

aida03 - 320k
aida07 - 254k

Startup merger and observe rates

aida03 - 224k
aida07 - 213k

Rate drop observed as before.

Now update aidacommon to point to AidaExecV10 and powercycle FEEs

Rates again with 0x3 

aida03 - 315k
aida07 - 252k

Restart with data transfer ON

aida03 - 317k
aida07 - 262k

No errors in merger terminal or "Merge time errors" statistic

Will keep running 
  513   Thu Sep 8 12:37:18 2022 NHProxy Port Changed
The proxy in Firefox, Yum and AnyDesk has been changed as the old wasn't working

proxy.gsi.de port 3128 is now in use
  515   Thu Oct 6 16:51:49 2022 NHOscilloscope analysis
Investigating AIDA noise with a TA041 differential probe and oscilloscope 

AC Mains (DESPEC platform AC, L-N)
Probe attentuation = 1:100

Fig 1: Main AC waveform [X: 5ms/div, Y: 100 V/div]
Fig 2: Zoomed in at peak (20 V FSR, any less and the waveform clipped) [X: 10us/div, Y: 20V/div]
Fig 3: Longer time base and FFT of 0-5 MHz. No significant frequency harmonics noticed [X: 5ms/div, Y:20 V, FFT X: 500 kHz/div, Y: 10 dBm/div]

No significant noise or distortion present, fully within any AC specification. 
Note that at the moment there is almost no load on AC
Equipment on on DESPEC rack: AIDA NIM, AIDA Raspberry Pis, bPlas PC (+ WR) + 2x DESPEC NIM crates
 No autofill, VME crate or detectors
All big machines at GSI (SIS, FRS) off (suspect pumps are on)

Ion catcher not on (I think under repair)

-

FEE PSU studies
Probe connected to 5V exposed power pin on FEE64 (+v) and to grounding crimp on FEE64 (-v)
No adapter board connected
Attentuation = 1:10


Fig 4: FFT when FEEs are *off* - essentially probe+scope noise [X: 5ms/div, Y: 100 mV/div, FFT: X: 500 kHz/div, Y: 10 dBm/div]
Fig 5: FFT when FEEs are *on* - notice 1.4 MHz peak in FFT, also seen on ADC waveform readout before (fig 6) [X: 5ms/div, Y: 100 mV/div, FFT: X: 500 kHz/div, Y: 10 dBm/div]

Fig 7: 500 ns/div 5V output on FEE, single FEE on the PSU [X: 500 ns/div, Y: 100 mV/div]

Note average max voltage is 5.31 V (power on) and ~ 70 mV "peak to peak" -might be from probe/scope?

Also see voltage changes with FEE power draw:

Power on  : 5.45 V (different scale to above)
SETUP ran : 5.51 V 
FADCs off : 5.86 V
ACQ Go:   : Unchanged; ASIC threshold 0xa: Unchanged

Also check situation on a fully loaded PSU (8 fees connected and powered on)

Power on:   5.29 V (fig 8)
SETUP ran:  5.36 V (fig 9)
FADCs off:  5.64 V (fig 10)

All X: 500 ns/div, Y: 100 mV/div

Both cases observe voltage rises as current draw drops (as expected for voltage drop along a cable)

Noise on 'scope seems to get slightly worse with reduced current (and higher voltage)

No sign of strong 100 kHz noise as seen in ADC traces beforehand

Todo:

- Check -6V and 7V rails
- Check 5V and noise when front-end card is added and pulser/HV connected
- Check between two FEE64 grounds 
- Check direct out of PSU vs ground to see if 1.4 MHz appears on PSU side or FEE64 side

-
11.10.22 Updates

Attachement 11 - 5V PSU on upper PSU with no FEEs attached whatsoever. No 1.4 MHz (on FFT) but clear low frequency beats from switching - presumably low/no load behaviour

Attachement 12 - 5V PSU on aida12 with 8 FEEs on PSU. Longer time base to allow lower frequencies in FFT. 1.4 MHz switching spikes visible but nothing around 100 kHz region

Attachments 13-16: 5V PSU on aida12 at 20 mV/div vertical and 1, 0.5, 2, 5 us/div horizontal respectively

12.10.22 Updates

Attachment 17: -6V PSU on aida12 with 8 FEEs on PSU. 2 us/div timebase. 20 mV/div amplitude
Attachment 18: 10 ms timebase and FFT
Average voltage: -6.21 V

Attachment 19: 7V PSU on aida12 with 8 FEEs on PSU. 2 us/div timebase. 20 mV/div amplitude
Attachment 18: 10 ms timebase and FFT
Average voltage: 7.46V

Measurement between AIDA12 ground and Reference ground/copper bar
+ve (red probe) attached to copper bar at ground point (not strong connection at present)
-ve (black probe) attached to ground crimp on aida12 (connected to cooling plate)
aida12 no adapter board connected: connections are PSU, Ethernet, HDMI and TTY only

Attachment 21: 5 us/div 100 mv/div waveform, big oscillations present. Not seen before FEEs turned on (8 FEES, 1-7+12)
Attachment 22: 10 ms/div for FFT, sharp peak at exactly 100 kHz observed...


Attachment 23: Between 5V PSU (+ve) and 19" rack (-ve) with  no FEEs connected to PSU
 See strong 100 kHz oscillations too, note that voltage isn't 5V as PSU is floating w.r.t. ground
 Looks to be common mode noise (on both 5V and Return of PSU)

Attachment 24: Same as 21 but using thick crocodile clips on probe to ground and aida12. Noise is attenuated but still present
  516   Fri Dec 16 14:02:12 2022 NHAIDA System off for christmas break
The AIDA NIM crate, pis and workstation have been powered off for the Christmas break and will not be accessible
  519   Mon Aug 28 12:47:56 2023 NHPower Failure 24.08.2023
There was a power failure in the morning of 24.08.2023 in the Rhein-Main area affecting GSI

The Aida workstation (aida-3) has been restarted, it is unknown if the Pis in S4 rebooted as well (there is a UPS)

29.8.23 TD Both RPi systems rebooted four days ago.
  520   Thu Aug 31 15:24:56 2023 NHNew AIDA MBS PC
The AIDA MBS FDR will be x86l-119 from now on, not x86l-94

the MBS relay and startup scripts will be changed for this
  532   Sun Mar 10 17:08:12 2024 NHAIDA FEE Layout + Cabling Plan for S100
Proposed FEE numbering and wiring plan for upcoming experiment S100 (2x Wide DSSSDs)

Image designed in draw.io, source attached 

FEE numbering is as S450, minimises cable movement from S505/Narrow AIDA
But means merger is not working with 1 DSSD (until all FEEs installed)

Wiring of adapter boards as from noise tests and what should work for DSSD bias
LK3 on middle bottom adapter to ground DSSD
LK1 on one n+n adapter to ground n+n side bias 
p+n has -ve voltage (w.r.t. ground) bias applied via lower adapter boards
ground loop grounds all adapter boards, except 2 p+n adapter boards which are grounded by the bias lemo shield instead

MACB layout also included, with expected NIM logic signals for the aida scalers:

1: Pulser/Sync clock (send to all subsystems, "trigger 3")0

3/4: Time Machine 
5/6: SC41L/R 

All other FEEs have their scaler available
(Scaler should be in left LEMO on MACB, right is output (AIDA->NIM/unused), bottom 4 are triggers from AIDA (unused)

Test circuit will not be used in experiment due to noise, but can be temporarily set up for pulser walkthrough

Revision 2 correct as of 27 March 2023
  539   Fri Mar 15 16:29:57 2024 NHLeakage currents
The behaviour of the DSSSD leakage current at low voltages and during biases is unusual and varies depending on how the adapter boards are connected
To summarise the behaviour I have observed

Minimum bias configuration:
 4 adapter boards, one n+n (LK1), three p+n (-ve bias), ground from n+n to one p+n
 Voltage (and leakage current) unstable at low voltages, seems to settle at around -60 V
 Drops can include 0 leakage current

Full adapter configuration:
 8 adapter boards, ground ring complete
 Same as minimum, but the drops seem to be much smaller (and not to 0 leakage current)
 -60V again seems to be the turnover to a stable leakage current 

In both cases the leakage current during ramping appears basically the same as when settled

Full into FEEs
 8 adapter boards, fully connected to 8 FEEs
 The leakage current is *much* higher during ramp,up to 17 uA near the end. No fluctuations
 Once ramping has finished the current quickly drops back down and settles at the nominal leakage current
 This has been observed in October/December too, it is not new (https://elog.ph.ed.ac.uk/AIDA/910)
 During power up of the FEEs the current sometimes drops briefly (when the ASICs get programmed, I believe)


I think it is related to the ground (more or less current flowing through the HV supply instead of alternate paths?)
It should be kept in mind when testing new detectors to not worry about the detector at low voltages
  540   Mon Mar 18 18:04:43 2024 NHPreparation for pre-s100 dry run (and test beam???)
In preparation for the dry run the following *temporary* changes to the FEE numbering have been prepared
These should be reverted after the dry run to ensure cable->fee agreement again

AIDA09 => AIDA06
AIDA11 => AIDA07
AIDA12 => AIDA08

This will allow the merger to run with 8 FEEs for 1 DSSD

dhcpd.conf updated

The 2023Oct19-13.46.30 should work with this numbering (check tomorrow)

As should layout GSI_triple_test_renumber 

AFTER dry run:

Revert DHCP and prepare for full 16 FEEs 

Make new ASIC settings key for 16 FEEs and prepare the aidaXX folders

Prepare a new Layout.mlf set
  541   Tue Mar 19 10:17:30 2024 NHDry Run 2024 - 19th March 24
AIDA has 8 FEEs and 1 DSSSD 

Aida08 (HDMI#12) had no WR again, I moved it to a different MACB and now it gets WR
The MACB (currently with jsut HDMI#10) seems issues, check/replace the upstream HDMI and thent eh MACB (after dry run!)
 
DSSSD#1 biased to -120 V, leakage current 5.6 uA (fig 1)
 (also on Grafana)

Temps OK fig2

System Checks (fig3-5)
 Clocks OK
 aida07 fails calibration, others OK
 WR OK (aida04 0x10, seems OK)
 FPGA OK

Did "Synchronise ASIC clocks" to align ASIC clocks

(Notes for scalers: SC41L HDMI 5, SCI41R HDMI 9)

18:12 FRS is taking beam, AIDA is powered off and unbiased
  542   Wed Mar 20 12:22:27 2024 NHWed Mar 20

Turn on AIDA for Dry Run demonstrations and so on

All system wide checks, temp, bias OK

Noise situation is dreadful (but has not been optimised). Deterioriation since first mounted, suspect cabling issues with bPlast and BB7.

 Note thresholds at 0x32 (!!!) to not brutalise the DAQs during testing

 aida08 seems OK

Server running to MBS totally fine

18:00

Carole grounded some of the Bplast and this reduced the rates in AIDA, although they are a bit fluctuatey. Due to position constraints she couldn't ground it all
Also AIDA ribbon cables are not grounded yet
The indication is these fixes should make a lot of difference to the situation

AIDA is now powered off for the end of day

  543   Wed Mar 20 17:02:53 2024 NH/dev/sdd
The following messages are in the system log very often:

Mar 20 18:00:56 aidas-gsi smartd[1076]: Device: /dev/sdd [SAT], 2224 Currently unreadable (pending) sectors
Mar 20 18:00:56 aidas-gsi smartd[1076]: Device: /dev/sdd [SAT], 257 Offline uncorrectable sectors

This (to me) suggests /dev/sdd may be failing. It should be backed up and later replaced (it is not used at the moment for /TapeData, older disk)
  557   Wed Apr 3 12:09:47 2024 NHReport - aida06 frequently fails to boot first time (PHY error)

When booting up AIDA aida06 usually crashes the first time, it fails to get IP from DHCP
After 180 seconds it reboots and seems to connect fine

Log file attached, key part (to me) is this:

27:03:24/14:13:19|Sending DHCP requests .
27:03:24/14:13:21|eth0: XLlTemac: PHY Link carrier lost.
27:03:24/14:13:21|..... timed out!
27:03:24/14:14:33|IP-Config: Reopening network devices...
27:03:24/14:14:33|eth0: XLlTemac: Options: 0x3fa
27:03:24/14:14:34|eth0: XLlTemac: allocating interrupt 19 for dma mode tx.
27:03:24/14:14:34|eth0: XLlTemac: allocating interrupt 18 for dma mode rx.
27:03:24/14:14:34|eth0: XLlTemac: speed set to 1000Mb/s
27:03:24/14:14:36|eth0: XLlTemac: Send Threshold = 24, Receive Threshold = 4
27:03:24/14:14:36|eth0: XLlTemac: Send Wait bound = 254, Receive Wait bound = 254
27:03:24/14:14:36|Sending DHCP requests ......
27:03:24/14:26:16|
  558   Wed Apr 3 12:42:57 2024 NHReport aida02 WR errors

The WR error counter for aida02 seems to consantly rise

Tried reseating cable on both ends, no change

However clock status passed, aida02 has a correct WR timestamp and no FIFO/PLL errors seen

Edit to add: aida02 has the faulty ASIC temperature readout as well, related or coincidence?

  559   Wed Apr 3 13:02:19 2024 NHMerger for 16 FEEs
Changed /MIDAS/Linux/startup/NewMerger

Change parameters -i and -l in master64 to 16 for 16 FEEs
Update NewMerger Options LinksAvailable to 16, LinksInUse to 1%1%1%1%1%1%1%1%1%1%1%1%1%1%1%1%
Fix NetVar RunOptions 1 (was 0)

Restart Merger HTTPd, Tape, Merger, MBS Spy

Reset/Setup/Go 

16 Links green and status going, all good?

Bias DSSSDs and turn data transfer on

Merger connected, shows rate and updates... no rate in Tape Server?

.. Oops forget to turn on Output to data storage in merger!

Rate in tape server and to MBS: 7 MB/s

Merger, Tape and MBS working with 16 FEEs
  638   Tue Jun 4 15:40:32 2024 NHTues 4 Jun
DEGAS Array over Snout again

Situation similar to yesterday, most p+n rates good
  732   Wed Oct 29 13:01:08 2025 NHUpdate of AnyDesk
AnyDesk was updated to the latest version that supports CentOS 7 (EOL OS)

First the YUM repositories were migrated, as the original address was offline due to EOL

# mv yum.repos.d yum.repos.d_old
# git clone https://github.com/tkne/centos-7-repo.git yum.repos.d

The OS was updated and a needed package was installed:

# yum update-minimal
# yum install gtkglext-libs

Finally AnyDesk was downloaded:

# https_proxy=http://proxy.gsi.de:3128 wget https://download.anydesk.com/linux/anydesk-6.3.3-1.el7.x86_64.rpm
# yum install anydesk-6.3.3-1.el7.x86_64.rpm

Note that later versions (such anydesk 6.4 or 7.0) refuse to install as CentOS 7 has too old a GLIBC
The only "fix" I observe is upgrading to a supported edition such as AlmaLinux (as used by CERN)
This would need to be coordinated with STFC 