ID |
Date |
Author |
Subject |
Text |
 |
515
|
Thu Oct 6 16:51:49 2022 |
NH | Oscilloscope analysis | Investigating AIDA noise with a TA041 differential
probe and oscilloscope
|
24x |
516
|
Fri Dec 16 14:02:12 2022 |
NH | AIDA System off for christmas break | The AIDA NIM crate, pis and workstation have
been powered off for the Christmas break
and will not be accessible |
|
519
|
Mon Aug 28 12:47:56 2023 |
NH | Power Failure 24.08.2023 | There was a power failure in the morning of
24.08.2023 in the Rhein-Main area affecting
GSI
|
|
520
|
Thu Aug 31 15:24:56 2023 |
NH | New AIDA MBS PC | The AIDA MBS FDR will be x86l-119 from now
on, not x86l-94
|
|
532
|
Sun Mar 10 17:08:12 2024 |
NH | AIDA FEE Layout + Cabling Plan for S100 | Proposed FEE numbering and wiring plan for
upcoming experiment S100 (2x Wide DSSSDs)
|
   |
539
|
Fri Mar 15 16:29:57 2024 |
NH | Leakage currents | The behaviour of the DSSSD leakage current
at low voltages and during biases is unusual
and varies depending on how the adapter boards |
|
540
|
Mon Mar 18 18:04:43 2024 |
NH | Preparation for pre-s100 dry run (and test beam???) | In preparation for the dry run the following
*temporary* changes to the FEE numbering
have been prepared
|
|
541
|
Tue Mar 19 10:17:30 2024 |
NH | Dry Run 2024 - 19th March 24 | AIDA has 8 FEEs and 1 DSSSD
Aida08 (HDMI#12) had no WR again, I moved |
    |
542
|
Wed Mar 20 12:22:27 2024 |
NH | Wed Mar 20 | Turn on AIDA for Dry Run demonstrations
and so on
All system wide checks, temp, bias |
9x |
543
|
Wed Mar 20 17:02:53 2024 |
NH | /dev/sdd | The following messages are in the system log
very often:
|
|
557
|
Wed Apr 3 12:09:47 2024 |
NH | Report - aida06 frequently fails to boot first time (PHY error) | When booting up AIDA aida06 usually crashes
the first time, it fails to get IP from DHCP
After 180 seconds it reboots and seems |
|
558
|
Wed Apr 3 12:42:57 2024 |
NH | Report aida02 WR errors | The WR error counter for aida02 seems to
consantly rise
Tried reseating cable on both ends, |
    |
559
|
Wed Apr 3 13:02:19 2024 |
NH | Merger for 16 FEEs | Changed /MIDAS/Linux/startup/NewMerger
Change parameters -i and -l in master64 to |
    |
638
|
Tue Jun 4 15:40:32 2024 |
NH | Tues 4 Jun | DEGAS Array over Snout again
Situation similar to yesterday, most p+n |
 |
312
|
Thu May 13 17:05:42 2021 |
Muneerah, MArc | Thu 13 May 04:00-00:00 | 19:08 System Check
Rates from ucesb below 1 kHz
Atachment 1 Stats |
  |
330
|
Wed May 19 09:12:52 2021 |
Muneerah, Betool, LS | 17th May 00:00-12:00 | Auther: Muneerah and Betool
02:00 The dead time have been checked every
30 min from the start of the shift, it seemes |
17x |
310
|
Thu May 13 00:51:40 2021 |
Muneerah and OH | Thu 13 May 00:00-08:00 | 01:50 Beam on
The leakage current and the voltages been
monitered every half an hour and logged in |
7x |
335
|
Thu May 20 01:00:30 2021 |
Muneerah | Thu May 20 00:00-08:00 | 02:00 System check
The ucesb has stopped around 00:26,
the team in the lab ask us to restart AIDA! |
13x |
338
|
Thu May 20 23:26:11 2021 |
Marc Labiche (ML) | system wide checks | System Wide check at begining of the night
shift:
----- |
9x |
497
|
Fri Jun 24 15:04:06 2022 |
Marc | Friday 24th June - evening shift | 16:05 - Last checked was at 15:30. (see
previous entry. All running smoothly.
Next wide check will be in about |
11x |