ID Date Author Subject Text Attachments
  185   Tue Mar 9 20:04:20 2021 TDTuesday 9 March 21.04 DAQ continues OK - file R20_379

      ASIC settings 2019Dec19-16.19.51
 7x 
  184   Tue Mar 9 10:23:45 2021 TDAnalysis of R14 (w/ NewMerger with min info code 4 & 5 data items)
Per https://elog.ph.ed.ac.uk/DESPEC/183 R14
data files have been analysed
 R14_0R14_19 
  183   Tue Mar 9 06:58:14 2021 CA, LSMarch 9th 08:00-11:00 shift08:00 DAQ continues ok - writing to file R13_120

      Merger ok - 4.6M data items/s
 23x 
  182   Mon Mar 8 22:51:47 2021 OHTuesday 9th March18:00 ASIC settings 2019Dec19-16.19.51
      DSSSD#1 slow comparator 0xa
      DSSSD#2 slow comparator 0xa
 10x 
  181   Mon Mar 8 17:02:38 2021 CAMonday 8th March 18:00 - 00:0018:00 ASIC settings 2019Dec19-16.19.51
      DSSSD#1 slow comparator 0xa
      DSSSD#2 slow comparator 0xa
 12x 
  180   Mon Mar 8 09:45:20 2021 CA, TDAnalysis R7_20 (new version of NewMerger with min info code 4 & 5 data items)
An analysis of file R6_70 can be found at
https://elog.ph.ed.ac.uk/DESPEC/177 attachment
 R7_20R7_20_verbose 
  179   Mon Mar 8 07:02:17 2021 CA, LSMonday 8th March 08:00 - 17:0008:00 ASIC settings 2019Dec19-16.19.51
      DSSSD#1 slow comparator 0xa
      DSSSD#2 slow comparator 0xa
 24x 
  178   Sun Mar 7 23:13:50 2021 OHMonday 8th March00:00 ASIC settings 2019Dec19-16.19.51
      DSSSD#1 slow comparator 0xa
      DSSSD#2 slow comparator 0xa
 13x 
  177   Sun Mar 7 07:23:26 2021 CA, LSMarch 7th 08:00 ASIC settings 2019Dec19-16.19.51
      DSSSD#1 slow comparator 0xa
      DSSSD#2 slow comparator 0xa
 14x 
  176   Sat Mar 6 23:37:22 2021 TDSunday 7 March 00.00-08:00
00.30 UNILAC problem - no beam
 18x 
  175   Sat Mar 6 06:52:06 2021 OH, LSSaturday 6th March07:50 Pulser settings - attachment 1

07:52 System wide checks all ok
 30x 
  174   Fri Mar 5 23:45:41 2021 TDS452 information
aida-gsi Anydesk 897170655
 S452__Shifts_checkpoints_v1_(1).pdfS452_Shift_Plan.pdf 
  173   Fri Mar 5 23:21:59 2021 CA, OHMarch 6th 2021 00:00 - 08:00 shift00:23 206Hg setting - No beam in AIDA yet

      AIDA not writing to file
 18x 
  172   Fri Mar 5 22:53:05 2021 OHThursday 5th of MarchThere has been no beam for much of the day.
It was lost at 13:00 and not regained until
22:00 German time.
  
  171   Thu Mar 4 11:16:13 2021 OHFurther cases of possible database issuesDuring testing for the S452 experiment yesterday
we were running through the steps of a restart.
 ErrorMessage.PNGerrorMessage.txt 
  170   Thu Mar 4 11:03:04 2021 NHS452 Operating NotesPlease note the following "quirks" currently
present in S452 that are important
  
  169   Thu Mar 4 10:13:48 2021 OHAnyDesk connection instuction   Connecting_to_AnyDesk_at_GSI_for_AIDA.pdf 
  168   Wed Mar 3 15:02:19 2021 CAMBS command line startup/MIDAS/Linux/startup/datarelaymbs    
  167   Sat Feb 27 12:47:57 2021 NHAIDA Rates/Situation Updated figures as of 27 Feb 2021 - S4 is
now closed for experiments but may open on
Wednesday.
 10x 
  166   Mon Feb 22 18:18:47 2021 NHAIDA Rates/Situation The ground cable (LEMO00) in aida07 was disconnected,
it has been reinserted and the waveforms
now look good.
 8x 