AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC, Page 27 of 35
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
691 Entries
Goto page
Previous
1
,
2
,
3
...
26
, 27,
28
...
33
,
34
,
35
Next
Selected entries:
ID
Date
Author
Subject
Text
176
Sat Mar 6 23:37:22 2021
TD
Sunday 7 March 00.00-08:00
00.30 UNILAC problem - no beam
18x
175
Sat Mar 6 06:52:06 2021
OH, LS
Saturday 6th March
07:50 Pulser settings - attachment 1
07:52 System wide checks all ok
30x
174
Fri Mar 5 23:45:41 2021
TD
S452 information
aida-gsi Anydesk 897170655
173
Fri Mar 5 23:21:59 2021
CA, OH
March 6th 2021 00:00 - 08:00 shift
00:23 206Hg setting - No beam in AIDA yet
AIDA not writing to file
18x
172
Fri Mar 5 22:53:05 2021
OH
Thursday 5th of March
There has been no beam for much of the day.
It was lost at 13:00 and not regained until
22:00 German time.
171
Thu Mar 4 11:16:13 2021
OH
Further cases of possible database issues
During testing for the S452 experiment yesterday
we were running through the steps of a restart.
170
Thu Mar 4 11:03:04 2021
NH
S452 Operating Notes
Please note the following "quirks" currently
present in S452 that are important
169
Thu Mar 4 10:13:48 2021
OH
AnyDesk connection instuction
168
Wed Mar 3 15:02:19 2021
CA
MBS command line startup
/MIDAS/Linux/startup/datarelaymbs
167
Sat Feb 27 12:47:57 2021
NH
AIDA Rates/Situation
Updated figures as of 27 Feb 2021 - S4 is
now closed for experiments but may open on
Wednesday.
10x
166
Mon Feb 22 18:18:47 2021
NH
AIDA Rates/Situation
The ground cable (LEMO00) in aida07 was disconnected,
it has been reinserted and the waveforms
now look good.
8x
165
Fri Feb 12 17:31:04 2021
NH
Background run
A background run has been started to check
the AIDA channels.
It is in /TapeData/BGFEB21
164
Sat Feb 6 10:45:55 2021
NH
AIDA Status Feb 2021
> 01.02.2021 - Four new sets of PSU, HDMI
& Ethernet cables were ran from the DESPEC
rack to the AIDA frame, in preparation for
163
Mon Feb 1 15:19:07 2021
NH
AIDA Status Feb 2021
01.02.2021 - Four new sets of PSU, HDMI &
Ethernet cables were ran from the DESPEC
rack to the AIDA frame, in preparation for
162
Tue Nov 24 13:10:42 2020
NH
Waveforms with frame grounded
AIDA Frame is now grounded to platform (will
add photo later)
161
Tue Oct 6 15:48:06 2020
NH
nnrpi kernel update
FYI:
The SD card on nnrpi2 was full again causing
160
Tue Jul 7 08:50:27 2020
NH
nnrpi2 does not boot
MIDAS was not working properly on nnrpi2 -
power cycled. Now system does not boot properly,
it gets stuck trying to login claiming "PAM
159
Tue Jul 7 08:04:57 2020
NH
Power failure in Messhuette
Last week there was a power failure in Messhuette
(FRS control room) - AIDA-3 and MBS were
affected.
157
Wed Mar 18 18:02:37 2020
PJCS
New Firmware loaded in all FEE64s
Loaded new frimware into all 12 FEE64s
in the system. IWR_Dec19_4.bin
Booted ok after power-cycle.
156
Mon Mar 16 07:25:24 2020
NH
End of Experiment
08:25 Beam Stopped, end of S480
Tape Server stopped at R12_2097
Started again in no storage mode