Fri Mar 13 23:06:39 2020 |
CA, OH | Saturday 14th March 00:00 - 08:00 | ASIC settings 2019Oct31-13.24.23
slow comparator 0xa
BNC PB-5 pulser
amplitude 1.0V , attenuator x1
frequency 2Hz
decay time 1ms
00.00 DAQ momentarily set to NoStorage
OH changes symbolic link such that AIDA is writing directly to mounted hard-drives ("SecondDrive" and "ThirdDrive")
00.02 DAQ now writing to file again - /media/SecondDrive/TapeData/S480/R12_0
00.30 all system wide checks ok
FEE64 temperatures ok - attachment 1
good event statistics ok - attachment 2
detector bias and leakage currents ok - attachment 3
00:43 merger ok - writing at ~ 3 million items/s
TapeServer ok - writing at ~ 27 Mb/s
Data forwarding to MBS ok
02:14 all system wide checks ok
FEE64 temperatures ok - attachment 4
good event statistics ok - attachment 5
detector bias and leakage currents ok - attachment 6
02:17 Merger ok ~ 2.7 million items/s
TapeServer ok ~ 27 Mb/s
Data forwarding to MBS ok
02:18 currently writing to file /media/SecondDrive/TapeData/S480/R12_110
02:57 attachments 7 & 8 - high energy channel spectra
attachment 9 - hit rate spectra
04:21 FEE64 temperatures ok - attachment 10
good event statistics ok - attachment 11
detector bias and leakage currents ok - attachment 12
system wide checks ok - except WR decoder status (see attachment 13)
04:26 check ASIC control
04:30 system functions -> select required function -> collect all WhiteRabbit status error counters for baseline
WR decoder status check now ok
04:50 Merger ok ~ 3 million items/s
TapeServer ok ~ 25 Mb/s
Data forwarding to MBS ok
04:52 currently writing to file /media/SecondDrive/TapeData/S480/R12_231
06:11 all system wide checks ok
FEE64 temperatures ok - attachment 14
good event statistics ok - attachment 15
detector bias and leakage currents ok - attachment 16
06:41 Merger ok ~ 3.3 million items/s
TapeServer ok ~ 25 Mb/s
Data forwarding to MBS ok
06:42 currently writing to file /media/SecondDrive/TapeData/S480/R12_315
07:25 hit-rate spectra - attachment 17
07:36 low energy channel spectra (1.8.L) - attachments 18 & 19
|
149
|
Fri Mar 13 15:48:11 2020 |
Friday 13th 16:00 - 24:00 | OH, TD | ASIC settings 2019Oct31-13.24.23
slow comparator 0xa
BNC PB-5 pulser
amplitude 1.0V , attenuator x1
frequency 2Hz
decay time 1ms
16:51 Bias and leakage currents ok but starting to increase in DSSD 1 predominantly - attachment 1
Statistics ok - attachment 2
FEE temp ok - attachment 3
System wide checks all ok
16:57 Histograms zeroed
17:17 ASIC control check done
17:40 Layout 1 - attachment 4
Layouts 3 and 4 - attachments 4 and 5
Layouts 5 and 6 - attachments 6 and 7
19:06 Earlier in the shift two extra 8TB drives were formatted and mounted
Named SecondDrive and ThirdDrive
TapeData folder created on SecondDrive
Plan is before the end of this shift to move the symbolic link from the filling up drive to the new drive
Current prediction is drive would otherwise be full by 12:20 tomorrow.
Playing it safe and switching early
21:57 Bias and leakage ok - attachment 8
Statistics ok - attachment 9
FEE Temps ok - attachment 10 |
148
|
Fri Mar 13 08:01:53 2020 |
DK | Friday 13th 8:00 to 16:00 shift | 8:00 - See previous shift's elog entry. All good.
9:00
All system wide checks passed
Merger okay, 3 Mega items / sec, all nnaida twinkle or stay lit
Tape Server okay - 27 MB/s
Histograms of implants look normal, about 5 counts per bin in SSD1 and SSD2 - see attachment #1
Stats as usual - attachment #2
Temps normal - attachment #3
Biases and leaks fine - attachment #4
Disk usage projection
Space remaining: ~2 TB
Fill rate: ~2 GB / 1 minute
-> 1000 minutes =~ 17 hours
Still gzipping from R6_823
10:13 I noticed that the integer for the TapeServer UI feedbackk has been exceeded.
Kbytes Written: -1986382400 Kbytes/sec: 26816
Rate is fixed at that value on update.
However, actual data files are being updated so data has been coming.
DK and NH consulted and believe the situation is fine.
We agreed next time the DESPEC team closes a run and starts a new one, they inform DK so he can restart the TapeServer for posterity and peace of mind.
10:25 Now we are on R10 after start and stop the TapeServer. Problem is resolved.
11:30
Implants: attachment #5
Stats: attachment #6
Biases / leaks: attachment #7
Temps: attachment #8
System wide checks performed, situation normal. |
147
|
Thu Mar 12 23:44:48 2020 |
DK | PID Plots | Labelled PID plots. Note that the A/Q calibration is shifted by +0.02 units, and Z calibration is offset by about +5.
There was an error in the printouts for Cd isotopes, but the below attachments are corrected.
The Z-depth (color, not nuclear charge) is log scale. |
146
|
Thu Mar 12 23:04:24 2020 |
LS, DK | Friday 13th 00:00 to 08:00 shift | Shift file starting R9_639
system wide checks okay
FEE temperatures okay (attachment 1)
leakage currents normal and recorded to spreadsheet (attachment 2)
good event stats are normal (attachment 3)
merger running at 3.5 M items/sec
tape running at 26 MB/sec
rates histogram (attachment 4)
low energy histograms (attachment 5 and 6)
high energy histograms (attachment 7 and 8)
02.02
system wide checks okay
FEE temperatures okay (attachment 9)
leakage currents normal and recorded to spreadsheet (attachment 10)
good event stats are normal (attachment 11)
merger running at 3.5 M items/sec
tape running at 27 MB/sec
04.09
system wide checks okay
FEE temperatures okay (attachment 12)
leakage currents normal and recorded to spreadsheet (attachment 13)
good event stats are normal (attachment 14)
merger running at 3 M items/sec
tape running at 27 MB/sec
writing to file R9_840
06.07
system wide checks okay
FEE temperatures okay (attachment 15)
leakage currents normal and recorded to spreadsheet (attachment 16)
good event stats are normal (attachment 17)
merger running at 3 M items/sec
tape running at 27 MB/sec
07.59
system wide checks okay
FEE temperatures okay (attachment 18)
leakage currents normal and recorded to spreadsheet (attachment 19)
good event stats are normal (attachment 20)
merger running at 3 M items/sec
tape running at 26 MB/sec
as of 08.00 just finished R9_1021
gzip is going through the R6_8* files
2.1TB left of space |
145
|
Thu Mar 12 15:25:08 2020 |
Thursday, March 12 16:00 to midnight shift | CA, DK, LS | 16:30
All system wide checks passed
Temps shown in attachment #1
Histos shown in attachment #2
NB: Zoomed in, linear scale
Biases shown in attachment #3
Stats shown in attachment #4
Merger rates fine 3 Mega items / sec
TapeServer looks happy, 25 MB/s
Paddy was asking us to give a rough estimate for the number of implants per spill.
I zoomed in on the rates histogram (attachment #2) and it looks like roughly 5 implants per channel in SSD 1 and SSD2.
So this is 5*128*2=1280. Note that I don't know the rate window size (e.g., 1 second, 1 spill?) Probably the window does not catch a full spill.
This might be an over-estimate because an implant in SSD2 may leave a signal in SSD1.
Paddy was getting around 1k or 2k fragments per spill, but to first order it seems consistent.
18:36
Near R9_372 they slightly opened some FRS slits, as there is a belief we may be blocking some of 94Pd.
Implant rate seems similar to before, see attachment #5
Biases did not change more than normal, see attachment #6
20:15
All system wide checks passed
Temps shown in attachment #7
Stats shown in attachment #8
Biases shown in attchment #9
22:12
All system wide checks okay
Histo #10
Bias #11
Stat #12
Temps #13 |
144
|
Thu Mar 12 08:04:24 2020 |
OH, CA, TD | Thursday 12th March 08:00-16:00 | ASIC settings 2019Oct31-13.24.23
slow comparator 0xa
BNC PB-5 pulser
amplitude 1.0V , attenuator x1
frequency 2Hz
decay time 1ms
09:00 Bias and leakage currents ok - attachment 1
Statistics ok - attachment 2
FEE temperatures ok - attachment 3
System wide checks all ok
09:08 No beam, not sure exactly how long it has been down.
FRS team are working on it
09:28 still no beam. issues with SIS.
DAQ set to NoStorage mode
most recent file R7_522
10.27 beam is back
writing to file R9_0
10.43 attachment 4 - hit rate spectra
11:09 all system wide checks ok
FEE64 temps ok - attachment 5
good event statistics ok - attachment 6
detector bias and leakage currents - attachment 7
11.18 merger ok, ~ 2.7 million data items per second
TapeServer ok, ~ 25 Mb/s data rate
Data forwarding to MBS ok
11.20 writing to file R9_39
11.22 beam off
11.24 beam back online (R9_42)
11.41 FRS has reverted to an older setting
13:04 hit rate spectra - attachment 8
13:19 all system wide checks ok
13:30 FEE64 temps ok - attachment 9
good event statistics ok - attachment 10
detector bias and leakage currents ok - attachment 11
15:31 good event statistics ok - attachment 13
detector bias and leakage currents ok - attachment 14
FEE64 temps ok - attachment 15
all system wide checks ok
beam seems to have stopped during 2pm meeting
15.35 TapeServer ok, data rate ~ 23 Mb/s
Merger ok, rate of 2.5 - 3 million data items per second
data forwarding to MBS ok
15.38 AIDA writing to file R9_233
16:02 beam back - AIDA writing to file R9_250
|
143
|
Wed Mar 11 23:44:27 2020 |
OH | Thursday 12th March 00:00-08:000 | ASIC settings 2019Oct31-13.24.23
slow comparator 0xa
BNC PB-5 pulser
amplitude 1.0V , attenuator x1
frequency 2Hz
decay time 1ms
00:44 Implantation range in AIDA - attachment 1
01:14 At current rate will run out of space in 35 hours ~ 18:00 hours on Friday 13th March.
During the day if possible it might be wise to try and obtain a USB3 HDD mount to mount one of the spare drives in
the AIDA boxes and begin moving files onto that
01:35 System wide checks all ok
Bias and leakage current ok - attachment 2
Stats all ok - attachment 3
FEE temperatures ok - attachment 4
TapeServer rate around 25-29MB per second
Merger rate around 2.6-3.2 million items per second
04:11 System wide checks all ok
Bias and leakage currents ok - attachment 5
Stats all ok - attachment 6
FEE temp ok - attachment 7
06:38 System wide checks all ok
Bias and leakage currents ok - attachment 8
Stats all ok - attachment 9
FEE temp ok - attachment 10 |
142
|
Wed Mar 11 17:21:33 2020 |
CA, TD, OH | Wednesday 11 March 16.00-00.00 | 18.25 DAQ currently running No Storage mode
ASIC settings 2019Oct31-13.24.23
slow comparator 0xa
BNC PB-5 pulser
amplitude 1.0V , attenuator x1
frequency 2Hz
decay time 1ms
DSSSD biases & leakage currents OK - attachment 1
FEE64 temps OK - attachment 2
good events statistics OK - attachment 3
system wide checks - OK
WR timestamp control - attachments 4 & 5
merger & TapeServer OK - attachments 6-8
rate spectra - attachment 9
1.8.L spectra - attachments 10 & 11
aida03 72 ch FWHM
20:36 DSSSD biases & leakage currents OK - attachment 12
FEE64 temps OK - attachment 13
good events statistics OK - attachment 14
all system wide checks ok
21.50 beam starts back up
DAQ running, TapeServer now writing to file R7_0
data rate ~ 25 Mb/s
data forwarding to MBS ok
merger ok, data item rate ~ 2.7 million items/sec
spill time length is now 3 seconds
1500 count rate per spill, ~ 300 Hz implant rate in AIDA
22.35 FEE64 temps OK - attachment 15
good event statistics ok - attachment 16
detector bias/ leakage currents ok - attachment 17
all system wide checks ok
22.47 attachments 18 & 19 - high energy spectra for all FEE64 (1.8.H)
attachment 20 - hit rate spectra for all FEE64
23.02 beam down
on file R7_55
23.11 beam back online
on file R7_61
23.15 system wide checks all ok
detector bias/ leakage currents ok - attachment 21
good event statistics ok - attachment 22
FEE64 temperatures ok - attachment 23 |
141
|
Wed Mar 11 16:29:17 2020 |
CA, LS, TD | slow comparator threshold comparison | 17.29 good event statistics for slow comparator threshold at 100 keV (0xa) - attachment 1
17.36 good event statistics for slow comparator threshold at 110 keV (0xb) - attachment 2
17.39 good event statistics for slow comparator threshold at 120 keV (0xc) - attachment 3
17.53 good event statistics for slow comparator threshold at 80 keV (0x8) for DSSD2, and 100keV (0xa) for DSSD 1&3 - attachment 4 |
140
|
Tue Mar 10 23:17:31 2020 |
DK, LS, PW, TD, CA | Wednesday 11 March 2020 | 00:15 Shift change near AIDA R6_475
We continue with spill cycles around 0.2 Hz or one beginning once each ~5 seconds.
All system-wide checks passed successfully
Temperatures ok (aida01 still a bit hot) - see attachment #1
Stats as normal (SSD3 still noisy) - see attachment #2
Bias and pulser settings remain sane - see attachment #3
Writing data to disk at ~26 MB/s as yesterday - see attachment #4
Merging fine, 2.6 to 3.3 Mega items / sec (all aida## seen to go on) - see attachment #5
Rates look not unreasonable for expected implantation in short time window - see attachment #6
2:26
We are near R6_574
All system checks are fine
Temps are fine - attachment #7
Stats look as before - attachment #8
Biases and leaks typical - attachment #9
Merger fine, 3 x 10^6 items / sec (skip screencap)
TapeServer still sits near 25 MB/s (skip screencap)
Cumulative implants look reasonable, but NB that histos have not been cleared - attachment #10
2:44 R6_587 or R6_588
The spills seem to have stopped based on the beeping scalars. Confirmed with other group there are no scint counts.
See attachment of AIDA rates where no implants can be seen. See attachment #11
2:46 Spill beeps heard briefly, but they cut again. R6_590
2:49 Beam seems to be back R6_592
Scints have counts in DESPEC DAQ, scalars are beeping, AIDA sees implants. No problem. See attachment #12 for implants.
4:35
System checks all pass (except expected error on master clock)
Temps okay - attachment #13
Biases and leak currents normal - attachment #14
Stats as before - attachment #15
Merger going, 3 mega items per sec
TapeServer going, 25 MB/s
5:59 Beam is gone again, near R6_738. As before, we get consistent confirmation from the trigger clicks and the plastic scint data of DESPEC group.
See attachment #16 which shows no implants in the rate.
Contact phones for Control Room: 2222
We called, they are aware of a problem with the magnets and they are working to resolve it. So we will await them.
Expert is scheduled for 7:30, but he may come earlier like 7:00 if he can make it in.
We leave AIDA writing to disk since there are some longer lived daughters (hour or more) so we may still get some interesting decays with beam off
7:14 Beam is still off, but I make some notes
System wide checks all okay
Temps as normal (see attachment #17)
Biases and leak currents okay (see attachment #18)
Stats as normal (see attachment #19)
Merger going at 3 mega cps
TapeServer on, around 25 MB/sec
Implants not seen in histogram rate as expected (see attachment #20)
7:32 We called the operators to confirm that they don't change anything before calling us first.
Surely they said they don't touch the settings without telling us first, and just one magnet (maybe upstream of SIS) is down, and no plan to alter settings.
8.00 shift change at file R6_823
beam is back on, no settings changed.
particles per spill is similar to before (2k~3k per spill)
implants now being seen in rate histogram (attachment 21)
8.32 system wide checks all okay
FEE temperatures are normal (attachment 22)
leak currents are okay and have been recorded to sheet (attachment 23)
good event stats seem normal, although noted that all FEEs in DSSD3 now over 100k (attachment 24)
merger rate is running around 3M items/sec
tape service rate is running around 26MB/sec
9.20 high energy spectra histograms for even FEEs was not displaying correctly (attachment 25). can also be seen on yesterdays elog on attachment 34
problem can be seen clearly in /tmp/LayOut6.mlf for the line corresponding to aida4 was 1.8h not 1.8H as the information was somehow saved in the layout (attachment 26).
remaking each histogram and saving layout6 seems to be fixed (attachment 27)
Top of the error message showed the problem, like:
====
Using /tmp/LayOut6.mlf
restore server=aida02 spectrum=1.8.H to gallery=1 overlap=1
restore server=aida04 spectrum=1.8.h to gallery=2 overlap=1
SpecDetails returned with an error
0x30004
SOAP-ENV:Server-Error detected in method SpecDetails
Invalid spectrum name
invoked from within
"SpecDetails 1.8.h"
(in namespace inscope "::urn:SpectrumService" script line 1)
invoked from within
====
10.05 beam is being stopped to change some thresholds
10.34 system wide checks all okay
FEE temperatures are normal (attachment 28)
leak currents are okay and have been recorded to spreadsheet (attachment 29)
good event stats are normal, as previously mentioned aida11 rate was over 100k this looks to have just been a fluctuation (attachment 30)
merger is running at a rate of 3M items/sec
tape service is running at a rate of 24MB/sec
implants not seen in histogram rate as expected as beam still down (see attachment 30)
10.42 beam still down but taking data, currently file finishing R6_946
as of now we have 3.2Tb left which should correspond to around 26 hours left until space is full
have zeroed all histograms so will take screenshots at 11.00
11.06 checked rates histograms, for aida3 some low energy channels in ASICs 1,2, and 3 were missing so performed ASIC control checks
11.25 beam back file S480/R6_975
12.00 analysis file S480/R6_1001 - attachment 33
FEE aida09 deadtime c. 5% (highest rate good events c. 250k), all other FEE64s << 1%
all HEC data rate c. 1kHz
all ADC data rate c. 1.2MHz
12.23 system wide checks all okay
FEE temperatures are normal (attachment 34)
leak currents are okay and have been recorded to spreadsheet (attachment 35)
good event stats are okay (attachment 36)
merger is running at a rate of 3M items/sec
tape service is running at a rate of 26MB/sec
13.00 beam off, unknown reason at the moment, but can confirm from rates histogram (attachment 37)
seems to be intermittent. file R6_1051
13.10 beam back on, no one was called. currently on file R6_1061
13.22 beam off as going to higher intensity beam. file R6_1069
14.42 system wide checks all okay
FEE temperatures are normal (attachment 38)
leak currents are okay and have been recorded to spreadsheet (attachment 39)
good event stats are okay (attachment 40)
merger is running at a rate of 3M items/sec
tape service is running at a rate of 24M/sec
14.48 on file R6_1131
16.19 beam stop for 2 hours. TapeServer stopped and restarted - AIDA writing to No Storage
file R6_1193
16:35 compression of files R6_[200-999] commenced (nice -20)
16:40 system wide checks all okay
FEE temperatures are normal (attachment 41)
leak currents are okay and have been recorded to spreadsheet (attachment 42)
good event stats are okay (attachment 43) |
139
|
Tue Mar 10 12:36:44 2020 |
TD | [How To] Monitor AIDA | All AIDA operations are controlled from the Dell T410 Workstation aidas1 using web browsers.
AIDA has multiple, independent data acquisition servers connected by an Ethernet network.
Response times to commands, information updates etc are ~10-60s - please be patient!
Every 4h
1) Desktop 1 - 1x PUTTY terminal sessions
Each PUTTY terminal session is connected to a CAEN N1419 4 ch HV Power Supply
Addr 00
Ch 0 = DSSSD # 1
:
:
Ch 2 = DSSSD # 3
Select the terminal and obtain a screenshot (Fn-Alt-PrtScn) of DSSSD #1 = #3 detector
bias voltages and leakage currents
Upload screenshots to Elog (elog.ph.ed.ac.uk/DESPEC)
Update leakage current spreadsheet (https://docs.google.com/spreadsheets/d/12hgbrywB10hGsKt5uc2HnLfZymh8_uvM6cEASbbqnBE/edit#gid=813167023)
If S4 ambient temperature information is available please add this information to the Elog
Compare DSSSD leakage currents (and temperatures) with previous observations
2) Desktop 1 - Firefox web browser - Temperatures tab
Select 'Reload'
Check temperatures
Virtex < 70 deg C
PSU < 45 deg C
ASIC < 70 deg C
Note that the ASIC temperatures for some data acquisition servers sometimes read back as 0.0
*If the temperature values above are exceeded switch off AIDA FEE64 electrical power* as follows
Desktop 3 - Firefox web browser
From 'Rly16 Control' select 'Switch ALL off'
and *now* seek expert help
*If* DAQ running also
3) Desktop 1 - Firefox web browser - Run Control tab
Select 'Update'
Check state of *all* data acquisition servers is 'going'
Check histogramming and data transfer #1 are enabled as indicated by 'H W X' tags
4) Desktop 1 - Firefox web browser - Statistics
Check 'good event' statistics - screenshot to Elog - compare with previous Elog entries
5) Desktop 1 - Firefox web browser - System Wide Checks
Check all system wide checks - compare results with porevious Elog entries
6) Desktop 2 - Firefox web browser - MERGE tab
Select 'Reload'
Check merge rate (~2-3M data items/s) consistent with value observed at start of run
Observe active spinners in NewMerger and TapeServer server terminal windows adjacent to web browser
Chweck MBS terminal data rate is around 20000kB/s Bottom right terminal on desktop 2
7) Desktop 2 - Firefox web browser - TapeServer tab
Select 'Reload'
Check data rate consistent with value observed at start of run |
138
|
Tue Mar 10 10:16:56 2020 |
OH | AIDA Implant Range Scan | A range scan was performed using AIDA.
See the GSI elog: https://elog.gsi.de/despec/S480/19 |
137
|
Tue Mar 10 08:48:07 2020 |
TD, OH, NH, LS, CA, DK, PJW, RP | Tuesday 10 March 08.00-16.00 |
c 09.00 aida03 drops Histogram enable at DAQ GO
NH determined this was due to Options DB corruption and fixed
09.55 DAQ currently running No Storage mode
ASIC settings 2019Oct31-13.24.23 (different from the December ones yesterday which experienced corruption)
slow comparator 0xa
BNC PB-5 pulser
amplitude 1.0V , attenuator x1
frequency 2Hz
decay time 1ms
DSSSD biases & leakage currents OK - attachment 1
FEE64 temps OK - attachment 2
good events statistics OK - attachment 3
system wide checks - attachments 4-11
aida06, 08, 10, 12 re-calibrated OK, all others OK
aida03 failed WR decoder status - collect all WR errors for baseline - all FEE64s pass WR decoder status
sync all ASIC clocks using ReSync
merger & TapeServer OK - attachments 12-14
13.29 DAQ to disk file S480/R6
ASIC settings 2019Oct31-13.24.23
slow comparator 0xa
aida01 LEC/MEC fast comparator 0x64, all other FEE64s 0xff
14.57 fast comparator thresholds LEC/MEC changed to 0xff for all FEEs
15.01 FEE temperatures normal, aida1 virtex temperature still slightly over 65 degrees (attachment 15)
leakage currents recorded to spreadsheet (attachment 16)
good events rate similar to previous, high in DSSD3 and seems to be returning to normal in DSSD1 except in one FEE (attachments 17 and 18)
system wide checks OK
data rate around 22000 KB per second (attachment 19)
as of 15.12 on file R6_80
attachment 20 is total event stats shows events are being implanted
attachment 21 and 22 show low energy spectrum left most peak is pulser and rightmost is central noise. middle peak in aida1
attachment 23 and 24 show high energy spectrum, aida4 histogram not being produced unsure why.
attachment 25 and 26 show waveforms, only aida3 histogram working
16.00 checked ASIC control, all OK
16.35 spill is now changed to 10s with beam intensity increase by factor of 10. 3000 implants per spill.
16.42 leakage currents recorded to spreadsheet
17.10 system wide checks ok
fee64 temperatures ok - attachment 27
detector bias/leakage currents ok - attachment 28
good event statistics ok - attachment 29
17.15 moved slit at S2 - rate drop to try remove some 96Pd
17.20 writing to file R6_166
17.44 merger/tapeserver ok. Data rate ~ 25000 kb/s
18:10 Fine tuning implantation profile
Removing 0.25mm Al degrader (60 mg/cm^2) to get 96Pd slightly further in to AIDA.
DESPEC is closing the current file, R6_203 was just finished on AIDA on typing this.
(Maybe the end of run S480f004_ on DESPEC side but that elog was not updated since 16:40?)
Decision based on assumption of 6 GeV 96Pd having a range 1 mm in silicon.
19.16 system wide checks ok
good event statistics ok - attachment 30
detector bias/leakage currents ok - attachment 31
fee64 temperatures ok - attachment 32
19.39 TapeServer/Merger ok. Writing to file R6_265. Data rate ~ 25000 kb/s
20.07 1.8.H high energy spectra front and back side (attachments 33 + 34)
20.36 S4 timing change, increased by factor of 2
20.38 Merger/TapeServer ok. Data being forwarded to MBS.
20.38 writing to file R6_308 at rate of ~ 25000 kb/s
21:21 system wide checks ok
good event statistics ok - attachment 35
fee64 temperatures ok - attachment 36
detector bias/leakage currents ok - attachment 37
21:57 TapeServer/merger ok
data forwarding to MBS ok
writing to file R6_368 at rate of ~26000 kb/s
23:10 system wide checks ok
good event statistics ok - attachment 38
fee64 temperatures ok - attachment 39
detector bias/leakage currents ok - attachment 40
23:24 TapeServer/merger ok
data forwarding to MBS ok
writing to file R6_435 at rate of 27000 kb/s
23:42 rate spectra - attachment 41
|
136
|
Mon Mar 9 13:50:08 2020 |
LS, CA, DK | 09/03/2020 system checks | 14:52 Attachment 1 shows low energy spectra. AIDA06 shows strange baseline, possible double-hit?
15:06 Systems checks fine.
Master clock failed (no master clock)
all checks passed
memory checks all around 38k as normal
Attachment 2: Temperature check all normal except aida01 virtex temp slightly over 65 degrees
Attachment 3: Good event stats seem normal except downstream SSD seems to be high around 200k
Attachment 4: leakage currents seem normal at expected values
15:16 Merger working for all FEEs
tape server is on but no storage
data rate is around 25 MB per second (high but consistent with the high stats of downstream SSD)
ASIC controls checked and are all OK
15.48 low energy pulsar peak FWHM
fee FHWM
1 89.08
2 132.06
3 70.73
4 81.84
5 62.86
6 79.92
7 122.13
8 73.31
9 198.39
10 115.53
11 100.55
12 144.04
ALL FEEs in downstream SSD are high
16:21 included low energy pulsar peaks (Attachments 5 & 6) and waveforms for all FEEs (Attachments 7 & 8)
16:25 included rates, note not to common scale in y (attachment 9)
ASIC settings file 2019Dec19-16.19.51 but some others are on 2019Oct31-13.24.23
Did not seem completely reproducible?
We carefully checked all the individual FEE and ASIC settings, and they are all the same (except shaping reference), with NO 0xad
Now we made sure they are all using 2019Dec19-16.19.51 (which we had saved first on a good one)
19:15 Update
There is a safety interlock box in S4 to monitor humidity, dew point, temperature, etc for safety.
It had a loose solder connection, and when someone moved it out of the way, the interlock was tripped.
After some debugging, the interlock is now in a more stable condition, but a lot of power was cut from AIDA systems
One unusual thing was that one of the RPi systems got a full /var/messages (or similar) and ate all the available disk space
This meant that ssh -X (to, e.g., activate putty) could not work, giving a permission denial error (ssh connection was allowed, but not X11 forwarding)
Now we have brought back up the AIDA systems and should run through the checks
Most system checks look good (except some calibration errors)
Temps were running high until we reloaded the ASIC settings, then the temperatures began to cool
Bias and leak currents attached as #10
Temps as #11
Stats as #12
19:50 Started writing to disk so that we can do an implantation depth profile. Will analyse near online using AIDASort.
21:45 Stopped writing to file -> Runs where AIDA thickness were investigated corresponds to R3_62 to R3_72
A rough method using the rates histogram was used to judge roughly when depositing in each histogram - see attachment 12 (Stopping in 2)
Can match to the FRS files to work out degrader thickness with timestamps (File stopped at Mon 09 Mar 2020 09:44:51 PM CET
21:51 AIDA running to no storage again |
135
|
Mon Mar 9 12:47:18 2020 |
NH | Report: Unusual AIDA Timestamp Error | Noted using my AIDA event builder code, a timewarp was reported and I noticed the ADC event had a different timestamp LSB to the "WR" markers preceding it, which I didn't think was possible in the merger as it stands
aida event 875015fa 0f68098c | INFO 5 SYNC6348 08 015fa
aida event 8744b164 0f68098c | INFO 4 SYNC4828 08 4b164
event time: 15fa4b164f68098c
aida event c1f6851b 0f68098c | ADC 08:54 L 851b
event time: 15fa4b164f68098c
aida event 875015fa 0f68115c | INFO 5 SYNC6348 08 015fa
aida event 8744b164 0f68115c | INFO 4 SYNC4828 08 4b164
event time: 15fa4b164f68115c
aida event c1ef8238 0f68115c | ADC 08:47 L 8238
event time: 15fa4b164f68115c
aida event 875015fa 0f68115c | INFO 5 SYNC6348 08 015fa
aida event 8744b164 0f68115c | INFO 4 SYNC4828 08 4b164
event time: 15fa4b164f68115c
aida event c1f884b0 0f68115c | ADC 08:56 L 84b0
event time: 15fa4b164f68115c
aida event 8a5015fa 0f681382 | INFO 5 SYNC6348 11 015fa
aida event 8a44b164 0f681382 | INFO 4 SYNC4828 11 4b164
event time: 15fa4b164f681382
aida event c2817dc8 0f681382 | ADC 11:01 L 7dc8
event time: 15fa4b164f681382
aida event 875015fa 0f68192c | INFO 5 SYNC6348 08 015fa
aida event 8744b164 0f68192c | INFO 4 SYNC4828 08 4b164
event time: 15fa4b164f68192c
aida event c1f9849c 0f68192c | ADC 08:57 L 849c
event time: 15fa4b164f68192c
aida event 815015fa 0f681f94 | INFO 5 SYNC6348 02 015fa
aida event 8144b164 0f681f94 | INFO 4 SYNC4828 02 4b164
event time: 15fa4b164f681f94
aida event c0568084 04b6854a | ADC 02:22 L 8084
event time: 15fa4b1644b6854a
AIDA Timewarp (15fa4b1644b6854a before 15fa4b164f68192c)
Event reported errors, skipping this file...
Events: 506459240 506459240 (0 errors)
Unsure if the cause, easily handled by ignoring such events but should be "impossible" |
134
|
Sat Feb 29 10:56:38 2020 |
NH | Alpha Hit Pattern | Circa 700 GB of data
A few channels in DSSD 1 missing? Otherwise seems OK |
133
|
Tue Feb 25 09:55:59 2020 |
NH | HV Scope Traces | Looking at the HV bias in a scope to see if it is the source of noise especially on the p+n side
Channel 1: HV Core channel 4
Channel 2: HV Braid Channel 4
Math: Ch1 - Ch2
100V bias (100 uA leakage current for 1 MOhm)
No obvious frequency components or large frequency components?
I do not know how this compares to RIKEN or STFC-DL
Updated to put the right frequency range (misread before)
Fig 3-4: Normalish looking data
Fig 5-6: Examples of noise appearing randomly on math line
Fig 7: 1ms long trace, noise stopped appearing
Update 26.02.2020
Fig 8: Trace with all 4 HV channels off
Fig 9: Trace with only oscilloscope biased
Fig 10: Trace with braids unplugged from all 3 FEE64s (only channel 4 connected)
Things to try:
Joining clean earth & chassis ground?
Checking HV jumper?
Finding 'scope probes and testing NIM socket? |
131
|
Fri Feb 21 12:16:06 2020 |
TD, NH | Report - high - unusual FEE64 crash during startup | |
130
|
Fri Feb 21 09:39:38 2020 |
TD, NH | Friday 21 February |
Attachment 1 - layout 2 - stat spectra
Attachment 2 - detector biases & leakage currents - OK
Attachment 3 - FEE64 temperatures - OK
Attachments 4-7 - TapeServer, Merger, Merger Statistics, good event statistics - OK
10:40 ASIC check load x2
13.12 DAQ stopped c. 10.50
unable to connect messages for multiple FEE64s
After lunch powwer-cycled FEE64s and restarted DAQ
aida03 crashed (see https://elog.ph.ed.ac.uk/DESPEC/131 ) and rebooted by issuing reboot command as root
Data file 20FEB20/R1
ASIC settings 2019Oct31-13.24.23
slow comparator 0xa -> 0x64
BNC PB-5 pulser OFF
continue alpha background run |
|