AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 30 of 36  ELOG logo
ID Date Authordown Subject Text Attachments
  684   Thu Jan 9 12:46:43 2025 JB, MP, CCAIDA timing test 




 AIDAfasttime_bPlastWRdt_AIDA10.pngAIDACalAdcFasttime.pngAIDAfasttime_bPlastWRdt_AIDA10_nopulser.pngCentrepeak_gauss_fit.png 
  681   Wed Jan 8 10:08:29 2025 JB, GB, SD, MP, CC, JGAIDA noise test with platform in positionYesterday we spent time essentially performing
a dry run to get AIDA DAQ and bPlast into
the time sorter, there were some issues with
 Screenshot_from_2025-01-09_09-32-08.pngScreenshot_from_2025-01-09_09-35-11.pngScreenshot_from_2025-01-09_09-32-20.pngScreenshot_from_2025-01-09_09-31-58.png 
  699   Thu Feb 20 17:06:42 2025 JB, CC, TD,MPWR error for aida 13,14,15,16WR timestamp errors resolved after reseating
the HDMI cables to the MACB
  
  531   Fri Mar 8 16:05:57 2024 JB, CC, TD, NHFriday 8 MarchBias tests of AIDA on individual wafers
and in parallel. Spreadsheet can be found
in attachment 1, and graphic results can
 IV_test_AIDA.xlsxchart.pngDownstream_positive_bias_vs._Current_(uA).png 
  566   Mon Apr 8 16:39:00 2024 JB, CC, TDMonday 8 April
17.32 Power and detector bias cycle
 11x 
  570   Wed Apr 10 08:37:57 2024 JB, CC, TDWednesday 10 April
09.38 CC completed install of Bplast driver
PCBs yesterday evening.
 47x 
  580   Fri Apr 19 13:52:34 2024 JB, CC, TDFriday 19 April contd.
12.00 Replaced AIDA ASIC mezzanine of aida01
to fix issue with asic #3
 23x 
  630   Tue May 7 13:25:00 2024 JB, CC, NH, HMATuesday 6 May - dismount snoutStatus before dismount

14:26 DSSSD#1 119.99 V @ 17.968
uA
 Screenshot_from_2024-05-07_14-25-52.pngScreenshot_from_2024-05-07_14-29-13.png 
  555   Tue Apr 2 12:36:25 2024 JB, CC, NHInstalling FEE64s of DSSSD2 cont.Some additional checks

- check 'top
hat' electrical isolators are correctly
  
  685   Thu Jan 9 15:43:17 2025 JB, CC, MPTiming test platform moved in16:30 We moved the platform in. The system
was still biased and the DAQ was still running.

The system seems to be okay, temperatures
 Screenshot_from_2025-01-09_16-41-48.pngScreenshot_from_2025-01-09_16-42-06.pngScreenshot_from_2025-01-09_16-42-46.png 
  572   Thu Apr 11 22:04:50 2024 JB12.04.2024 AIDA-bPlast noise optimisation15:00 Platform in, biasing detector. Temp
OK Attachment 1. test - Pulser OFF.

          
 Screenshot_from_2024-04-12_15-11-18.pngScreenshot_from_2024-04-12_15-22-54.pngScreenshot_from_2024-04-12_15-22-26.pngScreenshot_from_2024-04-12_18-07-35.pngScreenshot_from_2024-04-12_18-07-27.png 
  573   Sat Apr 13 14:04:44 2024 JB13 April Noise checks15:04 bPlast was left powered over night.
Powering up to check noise conditions - also
to check shifting of Germanium baseline (no
 9x 
  669   Wed Aug 14 12:40:11 2024 JBRepaired DSSSD delivery 14.09.2024Three BB18-1000 triples AIDAs collected
on 14.09.2024

Find attached visual of the wafer
 11x 
  696   Fri Jan 31 13:48:29 2025 JBAIDA analysis from HI-DESPEC meeting 20.11.2024AIDA analysis and presentation by J. Bormans
for AIDA made in the HISPEC-DESPEC collaboration
meeting.
  
  529   Thu Mar 7 11:09:05 2024 HA, JB, CC, TD, MGThursday 7 March
Snout assembly
  
  703   Thu Jun 12 13:15:25 2025 GB, CC, NK, MP, TDThursday 12 June 2025
EMC tests with NK (Orsay)
 Screenshot_from_2025-06-12_14-39-35.pngScreenshot_from_2025-06-12_14-33-26.png 
  149   Fri Mar 13 15:48:11 2020 Friday 13th 16:00 - 24:00OH, TDASIC settings 2019Oct31-13.24.23
     slow comparator 0xa
 11x 
  661   Thu Jun 13 23:04:01 2024 Dan Judson, TD0.00-8.00 14/6/240.00 checks - all looks ok

Voltage/currents - attachment 1

Rates attachment 2 + 3
 40x 
  647   Mon Jun 10 07:15:48 2024 Dan08.00-16.00 Monday 10th June8am checks

temps ok - attachment 2

rates ok - attachment 8
 50x 
  231   Fri Apr 16 15:52:08 2021 DSJ 16 April 16.00 shiftClock status test result: Passed 12, Failed
0
 12x 
ELOG V3.1.4-unknown