  DESPEC, Page 31 of 36  ELOG logo
ID Date Authordown Subject Text Attachments
  267   Fri Apr 23 15:13:28 2021 DSJ23 April 16.00-20.00 shift16:00 taking over from Muneerah

16:15 - temp, ucesb, database,
stats etc. look ok.
 6x 
  322   Mon May 17 23:17:16 2021 DSJTuesday 18 May 0.00-8.00 shift0.00 - Taking over from Lewis 

00.30 - Rates look ok (fig1), Ran
R14_147 through analyser, dead times
 39x 
  588   Mon Apr 22 15:17:07 2024 DSJ16.00-0.00 22/04/24First checks of shift. All looks ok.

Screenshot of HV, temps,
rates, Merger attached. Attachments 1-4.
 26x 
  151   Sat Mar 14 07:13:59 2020 DK, TD, LS, CGSaturday 14th March 08:00 - 24:008:15
    All system wide checks passed
    Leak currents are continuing to creep
 41x 
  105   Sat Dec 7 02:39:02 2019 DK, NH et al.34Si Fragments PIDSee attached

Tentative PID (DK) as attachment #3
 2019-12-07-PID.png59_AM.pngpid.pngAr-300_S4_updated_matter_DEPSEC_34Si.lpp 
  140   Tue Mar 10 23:17:31 2020 DK, LS, PW, TD, CAWednesday 11 March 202000:15 Shift change near AIDA R6_475

  We continue with spill cycles around 0.2
 43x 
  147   Thu Mar 12 23:44:48 2020 DKPID PlotsLabelled PID plots.  Note that the A/Q calibration
is shifted by +0.02 units, and Z calibration
is offset by about +5.
 pid.pngpid.pngpid.pdf 
  148   Fri Mar 13 08:01:53 2020 DKFriday 13th 8:00 to 16:00 shift8:00 - See previous shift's elog entry.  All
good.
 8x 
  236   Sat Apr 17 19:39:56 2021 DJ, TDSaturday 17 April 20.00-00.00
19.37 per FEE64 rate spectra - attachments
1 & 2
 13x 
  238   Sun Apr 18 07:30:20 2021 DJ, TDSunday 18th April 08:00-12:00---- 09-26
FEE64 module aida06 failed
FEE64 module aida07 failed
 7x 
  263   Thu Apr 22 23:17:46 2021 DJ Friday 23rd April 00:00-08:00Took over from TD ... All is well.

00:45 System Wide Checks

Clock: 12 passed, 0 failed.
 27x 
  695   Fri Jan 31 09:37:47 2025 CC, TD, MPFriday 31 JanuaryImplantation stack mounted - BB18(DS)-1000
+ bPlas + bPlas + 3x BB7(DS)-1000
 26x 
  697   Fri Jan 31 17:26:47 2025 CC, TD, MPFriday 31 January contd.
18.18 bPlas and BB7 installs complete 
      Restart AIDA DAQ, Merger, Tape Server
 16x 
  704   Fri Jun 13 12:42:39 2025 CC, TDFriday 13 June 2025
13.42 ASIC settings 2025Jun12-13.53.04
      *all* FEE64s slow comparator 0x64
 10x 
  709   Tue Jul 22 18:00:45 2025 CC, NK, MPFWHM aida FEEAIDA05 completely disconnected, all the
others FEEs64 are fully connected

Attachment 1: aida05, FWHM= 95
 Screenshot_from_2025-07-22_18-59-26.pngScreenshot_from_2025-07-22_18-59-45.png 
  716   Thu Jul 24 10:28:04 2025 CC, NK, MPComparison of channels in the same FEE64 and ASIC 05.1 and with AIDA13.1.8LBB7 is still connected but not biased (same
configuration as the previous elog). The
channel of the CAEN power supply #0 is connected
 8x 
  710   Wed Jul 23 09:37:34 2025 CC, NKComparison pulser FWHM with/without HT and detector cablesThis elog is the first reliable.
Before, the histograms have not been zero'd

Each test are done and compared
 9x 
  711   Wed Jul 23 13:08:30 2025 CC, NKComparison of channels in the same FEE64 and ASIC 05.1Biased at 100, AIDA05 connected, HT cables
not shielded CAEN HT

Attachment 1: AIDA05.1.8L -->
 Screenshot_from_2025-07-23_14-11-36.pngScreenshot_from_2025-07-23_14-13-46.pngScreenshot_from_2025-07-23_14-16-03.pngScreenshot_from_2025-07-23_14-18-27.pngScreenshot_from_2025-07-23_14-20-42.png 
  712   Wed Jul 23 13:59:37 2025 CC, NKShielding of the snoutAttachment1: AIDA05.1.8L when AIDA05 connected,
biased at 100 V with not-shielded cables,
CAEN HT,  after the base of the
 Screenshot_from_2025-07-23_15-07-42.png 
  715   Wed Jul 23 17:02:22 2025 CC, NKComparison of channels in the same FEE64 and ASIC 05.1 and with AIDA13.1.8LBB7 is still connected but not biased (same
configuration as the previous elog). The
channel of the CAEN power supply #0 is connected
 8x 