| ID |
Date |
Author |
Subject |
Text |
 |
|
393
|
Tue Feb 1 15:00:28 2022 |
NH | AIDA CentOS 7 Startup | Starting up AIDA on CentOS 7 to confirm things
work (based on some CARME experience)
|
|
|
67
|
Mon Oct 28 17:02:11 2019 |
TD | AIDA @ DESPEC cable length estimates | AIDA snout length 37cm (from end of AIDA snout
support assembly)
|
|
|
420
|
Wed May 4 16:50:04 2022 |
NH | AIDA 4th May | bPlas has been mostly cabled in now
Reseat LAN cable (AIDA Switch -> AIDA-3) |
 |
|
415
|
Wed Apr 27 15:47:46 2022 |
NH, HA, SA, CJ | AIDA 27 Apr 22 | Remount snout in S4 (photos to come)
Alignment with DEGAS OK but a bit short...
DEGAS platform will be brought 31 mm closer |
7x |
|
289
|
Sat May 1 08:45:19 2021 |
TD | AIDA 24cm x 8cm DSSSD + triPlast assembly for S496 |
Photos provided by Nic Hubbard and Helena
Albers from the assembly of 2x triPlast
|
12x |
|
107
|
Mon Dec 16 14:48:02 2019 |
NH TD | AIDA 16.12.19 | DSSD Snout was reassembled to install the
second bPlast (downstream)
(fig 1)
|
    |
|
60
|
Tue Aug 13 09:17:02 2019 |
NH | AIDA 12/08/2019 | The other 6 FEEs were powered on one at
a time to check no issues. None found.
All 12 FEEs plugged back into the |
|
|
55
|
Mon Jul 1 09:42:16 2019 |
NH | AIDA - 01/07/2019 | Water is still off.
Checked dewpoint sensor still flashing
red light (indicating an error). Pipes warmed. |
|
|
653
|
Tue Jun 11 20:20:36 2024 |
TD | ADC data rates from 09.00 11.6.24 | Per NH
"From ELOG (assuming times accurateish)
|
|
|
33
|
Fri Mar 22 14:31:24 2019 |
NH | A few more setup notes I forgot | Extra FEE information:
HV braid (0 V) goes into FEE10
(beam left) with LK1 jumper |
   |
|
105
|
Sat Dec 7 02:39:02 2019 |
DK, NH et al. | 34Si Fragments PID | See attached
Tentative PID (DK) as attachment #3
|
   |
|
477
|
Wed Jun 1 08:00:18 2022 |
TD | 2xDSSSDs spectra layouts |
Spectra layouts for 2x DSSSDs can be found
in directory ~/LayOut/2xDSSSDs |
|
|
436
|
Fri May 13 00:50:16 2022 |
ML | 2h-Shift Checks | All seems ok (apart for my virgin
network connection usually quite reliable
but not so tonight !?!). |
  |
|
438
|
Fri May 13 02:56:36 2022 |
ML | 2h-Shift Checks | All seemnormal on AIDA side.
Stats as before
Temperatures stable |
  |
|
439
|
Fri May 13 04:45:23 2022 |
ML | 2h-Shift Checks | AIDA is running ok. Note that, in the last
hour or so, the rate of implant in DSSD1
is back to higher rate ~10 Hzto 15 Hz as |
  |
|
440
|
Fri May 13 06:47:33 2022 |
ML | 2h-Shift Checks | It has been a quiet night. AIDA has been
stable.
Stats appears stable appear |
  |
|
444
|
Fri May 13 23:37:59 2022 |
ML | 2h-Shift Checks |
Took over remotely from CB about an
hour ago
At 0h40 (CET):
Stats still
ok - attach 1
Leakage still OK - Attach |
   |
|
445
|
Sat May 14 01:52:03 2022 |
ML | 2h-Shift Checks | AIDA stats ok
Leakage current ok
Temperatires ok |
    |
|
37
|
Tue Mar 26 14:59:30 2019 |
NH | 26.03.2019 | Fig1: FEE temperatures from 26.03.2019
all OK
AIDA has been on today and merger |
 |
|
23
|
Fri Jan 25 09:54:12 2019 |
CA, TD, NH, VP | 25th January 2019 | 09.30: AIDA still running, not writing to
file
Still running ok
|
8x |