AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 33 of 37  ELOG logo
Entry  Tue Feb 1 15:00:28 2022, NH, AIDA CentOS 7 Startup 
Starting up AIDA on CentOS 7 to confirm things work (based on some CARME experience)

NFS settings:
Entry  Mon Oct 28 17:02:11 2019, TD, AIDA @ DESPEC cable length estimates 
AIDA snout length 37cm (from end of AIDA snout support assembly)

downstream scintillator (assembly depth 1cm)   36cm
Entry  Wed May 4 16:50:04 2022, NH, AIDA 4th May Screenshot_20220504_174929.pngScreenshot_20220504_175201.png
bPlas has been mostly cabled in now

Reseat LAN cable (AIDA Switch -> AIDA-3) and reachieve 1 gbit/s speed as needed.
Entry  Wed Apr 27 15:47:46 2022, NH, HA, SA, CJ, AIDA 27 Apr 22 7x
Remount snout in S4 (photos to come) 
Alignment with DEGAS OK but a bit short...  DEGAS platform will be brought 31 mm closer to AIDA by rail adjustment
Entry  Sat May 1 08:45:19 2021, TD, AIDA 24cm x 8cm DSSSD + triPlast assembly for S496 12x

Photos provided by Nic Hubbard and Helena Albers from the assembly of 2x triPlast
plus 2x MSL type BB18(DS)-1000 24cm x 8cm detector assembly - attachments 1-3.
Entry  Mon Dec 16 14:48:02 2019, NH TD, AIDA 16.12.19 20191213_103710.jpg161219_aida_DSSDs.png161219_rates.png161219_aida0855.pngmidasmessage131219.png
DSSD Snout was reassembled to install the second bPlast (downstream) 
 (fig 1)
Entry  Tue Aug 13 09:17:02 2019, NH, AIDA 12/08/2019 AIDATemps-1208191457.png
The other 6 FEEs were powered on one at a time to check no issues. None found.
All 12 FEEs plugged back into the PSU.

Note: The FEE temperatures reported on Friday were before a Reset/Setup of the DAQ, which means the ASICs run very fast and the hence run hotter.
Entry  Mon Jul 1 09:42:16 2019, NH, AIDA - 01/07/2019 
Water is still off.

Checked dewpoint sensor still flashing red light (indicating an error). Pipes warmed. Not what I expected. Possible fault?

I checked S4's ambient temp/humidity with a home-brought sensor: Reports 27 C/50% RH (Dew Point = 16 C)
Entry  Tue Jun 11 20:20:36 2024, TD, ADC data rates from 09.00 11.6.24 
Per NH

"From ELOG (assuming times accurateish)
Entry  Fri Mar 22 14:31:24 2019, NH, A few more setup notes I forgot 20190322_132528s.jpg20190319_131821s.jpg20190313_161102s.jpg20190313_155418s.jpg
Extra FEE information:

HV braid (0 V) goes into FEE10 (beam left) with LK1 jumper
HV core (-160 V) goes into FEE09 (top)
Entry  Sat Dec 7 02:39:02 2019, DK, NH et al., 34Si Fragments PID 2019-12-07-PID.png59_AM.pngpid.pngAr-300_S4_updated_matter_DEPSEC_34Si.lpp
See attached

Tentative PID (DK) as attachment #3
Entry  Wed Jun 1 08:00:18 2022, TD, 2xDSSSDs spectra layouts 

Spectra layouts for 2x DSSSDs can be found in directory ~/LayOut/2xDSSSDs
Entry  Fri May 13 00:50:16 2022, ML, 2h-Shift Checks Stats_Screenshot_from_2022-05-13_01-45-56.pngTemp_Screenshot_from_2022-05-13_01-47-31.pngHV_LC_Screenshot_from_2022-05-13_01-48-21.png
All seems ok  (apart for my virgin network connection usually quite reliable but not so tonight !?!).

Statistics seems ok.

Temperatures appears stable
Entry  Fri May 13 02:56:36 2022, ML, 2h-Shift Checks Stats_Screenshot_from_2022-05-13_03-43-34.pngTemp_Screenshot_from_2022-05-13_03-44-41.pngHV_LC_Screenshot_from_2022-05-13_03-41-28.png
All seemnormal on AIDA side.

Stats as before

Temperatures stable
Entry  Fri May 13 04:45:23 2022, ML, 2h-Shift Checks Stats_Screenshot_from_2022-05-13_05-43-14.pngTemp_Screenshot_from_2022-05-13_05-42-10.pngHV_LC_Screenshot_from_2022-05-13_05-41-23.png
AIDA is running ok. Note that, in the last hour or so, the rate of implant in DSSD1 is back to higher rate ~10 Hzto 15 Hz as at the beginning of this
shift.

Stats seems ok
Entry  Fri May 13 06:47:33 2022, ML, 2h-Shift Checks Stats_Screenshot_from_2022-05-13_07-43-54.pngTemp_Screenshot_from_2022-05-13_07-43-13.pngHV_LC_Screenshot_from_2022-05-13_07-42-38.png
It has been a quiet night. AIDA has been stable.

Stats appears stable appear

Temperature also stable
Entry  Fri May 13 23:37:59 2022, ML, 2h-Shift Checks Stats_Screenshot_from_2022-05-14_00-40-56.pngHV_LC_Screenshot_from_2022-05-14_00-39-51.pngtemp_Screenshot_from_2022-05-14_00-41-44.pngUCESB_Screenshot_from_2022-05-14_01-00-00.png

Took over remotely from CB  about an hour ago

At 0h40 (CET):
      Stats still ok - attach 1
      Leakage still OK - Attach 2
      Temps
- attach 3
      Grafana OK
      UCESB rates ok - attach 5
      
      System-wide checks: aida09 fails clock (1), aida02 06 09 10 13 fail ADC calibration,
all pass WR
Entry  Sat May 14 01:52:03 2022, ML, 2h-Shift Checks Stats_Screenshot_from_2022-05-14_02-48-14.pngTemp_Screenshot_from_2022-05-14_02-47-31.pngHV_LC_Screenshot_from_2022-05-14_02-46-42.pngucesb_rates_Screenshot_from_2022-05-14_02-50-36.pngGrafana_Screenshot_from_2022-05-14_03-50-00.png
AIDA stats ok

Leakage current ok

Temperatires ok
Entry  Tue Mar 26 14:59:30 2019, NH, 26.03.2019 20190326Temps.pngaidambsrelay-error.png
Fig1: FEE temperatures from 26.03.2019  all OK

AIDA has been on today and merger setting fixed (see previous ELOG entry https://elog.ph.ed.ac.uk/DESPEC/36)

Still diagnosing issues with MBS (figure 2) but local data acquisition should be functional.
Entry  Fri Jan 25 09:54:12 2019, CA, TD, NH, VP, 25th January 2019 8x
09.30: AIDA still running, not writing to file
       Still running ok
       No water leaks
ELOG V3.1.3-7933898