AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 33 of 35  ELOG logo
ID Date Author Subjectdown Text Attachments
  648   Mon Jun 10 15:07:24 2024 Marc16:00-00:00 shift Monday 10/06/24Evening shift


5pm full checks:
DSSSD
bias & leakage current  ok - attachment
 31x 
  619   Sun Apr 28 16:26:47 2024 Betool Alayed16:00-00:00 Sunday 28 April19:24 pm screenshots

and

17:18 pm screenshots
 10x 
  657   Wed Jun 12 15:41:07 2024 Betool Alayed16:00-00:00 Wed 12 Jun 245pm full checks:
DSSSD bias & leakage current 
ok - attachment # 1-2
 27x 
  660   Thu Jun 13 21:06:44 2024 Robert Page16:00 to 00:00 shift on 13/6/2024Elog went down around the end of the last
shift, so final screenshots were not uploaded
at that point.
 26x 
  606   Thu Apr 25 15:02:50 2024 Marc16:00 - 0:00 Thursday 25 April
16:20: 
Spill length:4s (was 3.5s
before) - Extraction time 1.5s (see attachement
#1)
          
 8x 
  613   Sat Apr 27 15:13:06 2024 Norah16:00 - 00:00 Saturday 27 April 14:50 Checks

Leakage current  is 20.021
and HV status is Max Voltages ! Is it normal
 15x 
  610   Fri Apr 26 15:34:00 2024 RDP16:00 - 00:00 Friday 26 AprilThis appeared in the system log:

Apr 26 16:30:51 aidas-gsi smartd[1076]:
Device: /dev/sda [SAT], 1 Currently unreadable
 6x 
  645   Sun Jun 9 16:38:30 2024 Norah , Muneerah, JB16:0-00:00 9 June 2024AIDA02 and AIDA06 gave zero attachment
1. After connecting with Tom to fix it, now
it works.
 Screenshot_from_2024-06-09_17-24-13.pngScreenshot_from_2024-06-09_18-00-27.pngScreenshot_from_2024-06-09_18-01-49.pngScreenshot_from_2024-06-09_18-01-23.png 
  616   Sun Apr 28 15:09:34 2024 Betool Alayed16:0-00:00 28 April 202416:00 aida04 not producing data

         
power cycle all FEE64s to recover DAQ
 R21_668.txt 
  620   Sun Apr 28 20:35:57 2024 Betool Alayed16:0-00:00 28 April 202421:30 screenshots

and

23:24 screenshots
 10x 
  588   Mon Apr 22 15:17:07 2024 DSJ16.00-0.00 22/04/24First checks of shift. All looks ok.

Screenshot of HV, temps,
rates, Merger attached. Attachments 1-4.
 26x 
  231   Fri Apr 16 15:52:08 2021 DSJ 16 April 16.00 shiftClock status test result: Passed 12, Failed
0
 12x 
  197   Sat Mar 13 23:08:08 2021 CA14th March 00:00-08:0000:08 DAQ continues ok - writing to file R46_221

      ASIC settings 2019Dec19-16.19.51
 22x 
  597   Tue Apr 23 13:15:43 2024 PP14:00 checksAll looks good.

Screenshots attached
 8x 
  96   Wed Nov 13 09:10:37 2019 CA, NH, OH13th November 201910:10 moved HV cables from 11 and 12 to 10
and 9 - all detectors biased in same configuration
 191113_pulserpeaksOdd.png191113_pulserpeaksEven.png191113_goodevents.png191113_bias.png 
  443   Fri May 13 15:00:23 2022 CB13 March - 16:00-24:00 shift16:00 Took over remotely from OH, TD who remain
in GSI
 10x 
  573   Sat Apr 13 14:04:44 2024 JB13 April Noise checks15:04 bPlast was left powered over night.
Powering up to check noise conditions - also
to check shifting of Germanium baseline (no
 9x 
  594   Tue Apr 23 11:09:00 2024 PP12:00 checksEverything is OK now.

Screenshots attached.
 8x 
  572   Thu Apr 11 22:04:50 2024 JB12.04.2024 AIDA-bPlast noise optimisation15:00 Platform in, biasing detector. Temp
OK Attachment 1. test - Pulser OFF.

          
 Screenshot_from_2024-04-12_15-11-18.pngScreenshot_from_2024-04-12_15-22-54.pngScreenshot_from_2024-04-12_15-22-26.pngScreenshot_from_2024-04-12_18-07-35.pngScreenshot_from_2024-04-12_18-07-27.png 
  571   Thu Apr 11 08:27:21 2024 JB, TD11 April noise tests
TO-DO for 11.04.2024

- Try bringing
bPlast drain wire ground back to the PSU
ground for PN 300 and R&SRMP4040.

-
 48x 