AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 34 of 36  ELOG logo
Entry  Thu Apr 25 15:02:50 2024, Marc, 16:00 - 0:00 Thursday 25 April 8x

16:20: 
Spill length:4s (was 3.5s before) - Extraction time 1.5s (see attachement #1)
             

16.45
Checks:
      DSSSD bias & leakage current - Grafana - attachments 2
       leakage current ramping, spill micro structure observable

      FEE64
temperatures OK - attachment 3

      ADC data item stats - attachment 5

      per FEE64 Rate spectra - attachment 4

      Merger etc - attachment
Entry  Sat Apr 27 15:13:06 2024, Norah, 16:00 - 00:00 Saturday 27 April  15x
14:50 Checks

Leakage current  is 20.021 and HV status is Max Voltages ! Is it normal ? - attachments 1

It is quite warm at GSI today and this may be a temperature effect. Hopefully will go down latter in the day (Marc). Any way let's kep an
Entry  Fri Apr 26 15:34:00 2024, RDP, 16:00 - 00:00 Friday 26 April 6x
This appeared in the system log:

Apr 26 16:30:51 aidas-gsi smartd[1076]: Device: /dev/sda [SAT], 1 Currently unreadable (pending) sectors
Apr 26 16:30:56 aidas-gsi smartd[1076]: Device: /dev/sdd [SAT], 2224 Currently unreadable (pending) sectors
Entry  Sun Jun 9 16:38:30 2024, Norah , Muneerah, JB, 16:0-00:00 9 June 2024 Screenshot_from_2024-06-09_17-24-13.pngScreenshot_from_2024-06-09_18-00-27.pngScreenshot_from_2024-06-09_18-01-49.pngScreenshot_from_2024-06-09_18-01-23.png
AIDA02 and AIDA06 gave zero attachment 1. After connecting with Tom to fix it, now it works.

17:00

DSSSD bias & leakage current - attachment 2
Entry  Sun Apr 28 15:09:34 2024, Betool Alayed, 16:0-00:00 28 April 2024 R21_668.txt
16:00 aida04 not producing data

          power cycle all FEE64s to recover DAQ

16.20 analysis data file R21_668
Entry  Sun Apr 28 20:35:57 2024, Betool Alayed, 16:0-00:00 28 April 2024 10x
21:30 screenshots

and

23:24 screenshots
Entry  Mon Apr 22 15:17:07 2024, DSJ, 16.00-0.00 22/04/24 26x
First checks of shift. All looks ok.

Screenshot of HV, temps, rates, Merger attached. Attachments 1-4.

Screenshots of all spectrum Layout IDs taken before zeroing at 16.35. (Attachments 5-12)
Entry  Fri Apr 16 15:52:08 2021, DSJ , 16 April 16.00 shift 12x
Clock status test result: Passed 12, Failed 0

Understand status as follows
Entry  Sat Mar 13 23:08:08 2021, CA, 14th March 00:00-08:00 22x
00:08 DAQ continues ok - writing to file R46_221

      ASIC settings 2019Dec19-16.19.51
Entry  Tue Apr 23 13:15:43 2024, PP, 14:00 checks 8x
All looks good.

Screenshots attached
Entry  Wed Nov 13 09:10:37 2019, CA, NH, OH, 13th November 2019 191113_pulserpeaksOdd.png191113_pulserpeaksEven.png191113_goodevents.png191113_bias.png
10:10 moved HV cables from 11 and 12 to 10 and 9 - all detectors biased in same configuration

      lowered slow comparator threshold to 0xa
Entry  Fri May 13 15:00:23 2022, CB, 13 March - 16:00-24:00 shift 10x
16:00 Took over remotely from OH, TD who remain in GSI

      Stats OK - attach 1
Entry  Sat Apr 13 14:04:44 2024, JB, 13 April Noise checks 9x
15:04 bPlast was left powered over night. Powering up to check noise conditions - also to check shifting of Germanium baseline (no change observed).

          TEMP OK.

          Noise condition the same as yesterday when platform was moved in. Noise in aida01 and
Entry  Tue Apr 23 11:09:00 2024, PP, 12:00 checks 8x
Everything is OK now.

Screenshots attached.
Entry  Thu Apr 11 22:04:50 2024, JB, 12.04.2024 AIDA-bPlast noise optimisation Screenshot_from_2024-04-12_15-11-18.pngScreenshot_from_2024-04-12_15-22-54.pngScreenshot_from_2024-04-12_15-22-26.pngScreenshot_from_2024-04-12_18-07-35.pngScreenshot_from_2024-04-12_18-07-27.png
15:00 Platform in, biasing detector. Temp OK Attachment 1. test - Pulser OFF.

           Rates somewhat worse than last night - probable contact on grounding of snout. Attachment
3.
Entry  Thu Apr 11 08:27:21 2024, JB, TD, 11 April noise tests 48x

TO-DO for 11.04.2024

- Try bringing bPlast drain wire ground back to the PSU ground for PN 300 and R&SRMP4040.

- Recheck the downstream
detector bias and ground scheme.

-

 
Entry  Tue Apr 23 09:21:01 2024, PP, 10:20 checks - aida02 is down 8x
Aida02 is down. Contacted Nick.

The rest looks stable, see screenshots.

10:53 CEST (NH): Rebooted aida02 via telnet
Entry  Sun Apr 28 22:52:06 2024, Marc, 0:00-08:00 Monday 29 April  7x
Just another manic magic Monday, ....

Taking over Betool's AIDA shift. All is good.

This shift's first hour has been eventless. Temperatures, Rates, bias, all look good.
Entry  Mon Mar 9 13:50:08 2020, LS, CA, DK, 09/03/2020 system checks 13x
14:52 Attachment 1 shows low energy spectra. AIDA06 shows strange baseline, possible double-hit?

15:06 Systems checks fine.
Entry  Wed Apr 24 09:04:55 2024, TD, 08:00-16:00 Wednesday 24 April 33x

09.56 DAQ continues data file S100_alpha/R18_122
      FRS setting 162Eu
ELOG V3.1.4-unknown