Entry  Tue Apr 9 09:04:07 2024, TD, [How To] Remote control of BNC PB-5 Screenshot_from_2024-04-09_10-03-42.png

BNC PB-5 set to remote control
Entry  Sun Apr 28 16:07:59 2024, TD, [How To] Recover DAQ when one FEE64 stops sending data - short(er) version 
0) Please infrom the 'on shift' crew that you need to restart the AIDA DAQ

1) STOP DAQ [workspace 2, display 1, browser tab 'Run Control']
Entry  Sun Jun 9 13:32:48 2024, TD, [How To] Recover DAQ when one FEE64 stops sending data - short(er) version 

1) Select 'No Storage' [workspace 3, display 1, browser tab 'TapeServer']
    If already in 'No Storage' mode please ignore this step
Entry  Fri Apr 26 08:15:59 2024, TD, [How To] Recover DAQ when one FEE64 stops sending data 

Occasionally, one (sometimes more) FEE64(s) will stop producing data whilst the DAQ is running *and* data is being transferred to the Merger and TapeServer.
Entry  Tue Mar 10 12:36:44 2020, TD, [How To] Monitor AIDA 
All AIDA operations are controlled from the Dell T410 Workstation aidas1 using web browsers.

AIDA has multiple, independent data acquisition servers connected by an Ethernet network.
Entry  Wed Jun 8 09:55:28 2022, NH, Weds 8 May 2022-06-08_14-48-21_goodevents.pngrn_image_picker_lib_temp_97373248-bdea-4864-b8a9-a13d0d016e30.jpg
10.30 : Turn off AIDA FEE64s 

        Prepare a ground cable for snout - M10 terminal on one end for copper bar. Will affix with Cu tape for now (no free screws)
Entry  Tue May 18 23:11:40 2021, CA, Wednesday May 19th 00:00 - 08:00 14x
00:00 CA takes over
      LS has performed usual checks, see previous Elog entry - all ok
Entry  Wed Apr 3 09:28:07 2019, CA, CB, TD, Wednesday April 3rd 2018 11x
Arrived at 09:54 - sequenced all FEE64 on

FEE64 not mounted properly - something happened to network overnight, see attachment 1,2 for AIDA system log
Entry  Wed Mar 9 10:15:56 2022, NH TD, Wednesday 9 March - noise tests contd. 38x
11.15 - S4 is currently closed no access

If access possible (should be) plan is
Entry  Wed Jun 9 11:27:47 2021, TD, Wednesday 9 June 11x
12.30 DAQ continues OK file S496/R32_373
 
      System wide checks OK *except*
Entry  Thu May 6 16:59:20 2021, TD, OH, Wednesday 6 May 13x

18.09 NH has installed jumpers LK2-4 for *all* adaptor PCBs
Entry  Wed Apr 6 10:09:21 2022, OH, NH, TD, Wednesday 6 April 6x
DSSSD bias OFF. DAQ STOPped

Attachment 6 FEE64 temps OK
Entry  Wed May 5 20:10:16 2021, OH, Wednesday 5 May Alpha run 12x
21:10 After all of the works in S4 today the noise in the system was considerably worse
      It was decided that before starting a new alpha run a powercycle would be performed.
      The powercycle has had no effect on the rates. They are still terrible.
Entry  Wed Apr 28 10:06:11 2021, NH, Wednesday 28 April elog_temps.pngelog_gswr.pngelog_tse.pngelog_hv.pngAIDA_FEE.png.jpeg
11.05 All system wide checks OK *except*
WR
Entry  Wed May 26 13:21:59 2021, TD, Wednesday 26 May 9x

14.22 DAQ continues - file S496/R18_369
      alpha background
Entry  Wed Jun 22 07:12:46 2022, MS, Wednesday 22 June 8:00-16:00 16x
Took over the night shift from Tom.

8:10 : attachments 1-3

10:00 : attachments 4-6
Entry  Wed Jun 22 15:09:37 2022, MA, Wednesday 22 June 16:00-00:00 12x
16:00 Take over from Magda mrning shift

Beam was off of sometime for tunning to Mercurey setting.

17:00 attached 1-3
Entry  Tue Jun 21 23:29:16 2022, TD, Wednesday 22 June 00:00-08:00 33x

00.28 all histograms & stats zero'd
      baseline counters
Entry  Wed Apr 21 15:01:14 2021, LJW, MA, Wednesday 21st April 16:00-20:00 13x
16:30

All System checks okay, except for:
Entry  Wed Apr 21 06:56:42 2021, MS, Wednesday 21 April 08:00-12:00 2021 10x
8:00