AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 6 of 37  ELOG logo
Entry  Tue May 7 13:25:00 2024, JB, CC, NH, HMA, Tuesday 6 May - dismount snout Screenshot_from_2024-05-07_14-25-52.pngScreenshot_from_2024-05-07_14-29-13.png
Status before dismount

14:26 DSSSD#1 119.99 V @ 17.968 uA

          DSSSD#2 119.95 V @ 11.212 uA
Entry  Wed May 5 16:57:48 2021, TD, Tuesday 5 May Screenshot_2021-05-05_AIDA_Alerting_-_Grafana(1).png401.png

17.55 Grafana DSSSD bias & leakage current - attachment 1
       Note abrupt decrease of DSSSD# 2 leakage current c. 1.5uA at 17.37 
Entry  Tue Mar 5 09:10:01 2024, MA, JB, TD, Tuesday 5 March 20240305_101140.jpg20240305_101146.jpg20240305_165949.jpg

Old ribbon cable assemblies - attachments 1  2
Entry  Tue Apr 5 08:52:16 2022, TD, Tuesday 5 April 6x
DSSSD bias OFF. DAQ STOPped

Attachment 1 FEE64 temps OK
Entry  Thu Sep 6 15:11:17 2018, OH, TD, Tuesday 4 September - Thursday 6 September 19x
Attachment 1 - FEE64 temperatures illustrating (we assume) a faulty PSU temperature sensor for aida07

Attachment 2 - FEE64 temperatures following replacement of aida07
Entry  Tue May 4 13:53:22 2021, OH, TD, Tuesday 4 May 7x

NH has re-checked alignment of AIDA adaptor PCBs cf. Elog:290
Entry  Tue May 31 09:05:00 2022, NH, TD, Tuesday 31 May 
DSSD stack will be as follows

1      3208-7  1019       125              upstream
Entry  Tue May 31 17:09:35 2022, TD, Tuesday 31 May 20x
2x MSL type BB18(DS)-1000 installed

Entry  Tue Apr 30 09:06:45 2024, TD, NH, Tuesday 30 April 7x

10.00 DSSSD bias & leakasge current - Grafana - attachments 1-2
Entry  Tue Apr 2 07:39:44 2019, CB, TD, CA, Tuesday 2nd April 2019 36x
08:15 beam tuning in progress

08.30 System wide checks 
Entry  Mon Jun 27 23:11:47 2022, TD, Tuesday 28 June 00:00-08:00 30x
00:07 Zero stats & all histograms

ASIC settings 2021Apr29-13-16-00
Entry  Tue Apr 27 08:26:01 2021, TD, Tuesday 27 April - aida09 system console reports 'received undefined information code: 1' and 'code: 9' 6x

09.25 All system wide checks OK *except*
Entry  Tue May 25 11:16:54 2021, TD, Tuesday 25 May 7x
12.16 DAQ continues file S496/R18_324
      alpha background
Entry  Tue Apr 23 15:11:50 2024, TD, Tuesday 23 April 16:00-00:00 20x

16.12 Analysis of data file R17_101 - attachment 1
Entry  Tue Jun 21 10:19:05 2022, OH ML, Tuesday 21st June 08:00-00:00 12x
11:19 Stats ok 0xa on all FEE - attachment 1
      Current pulser settings - attachment 2
      FEE Temperatures ok - attachment 3
Entry  Tue Apr 20 19:00:00 2021, JS, Tuesday 20th 20:00-00:00  12x
20:00  

Taking over from Liam, all systems good.
Entry  Tue Apr 20 14:56:38 2021, LPG, Tuesday 20th 16:00-20:00 15x
16:00

New shift, ready to go! Beam stopped just as I started... Waiting for update.
Entry  Tue May 18 18:47:25 2021, LS, Tuesday 18th May 20:00 - 24:00 24x

19.50
Stats okay (Fig 1)
Entry  Tue May 18 14:57:43 2021, CB, Tuesday 18th May 16:00 - 20:00 11x
15:58 Took shift over from OH and PP

Stats OK - attach 1
Entry  Tue May 18 06:50:53 2021, OH, PP, Tuesday 18th May 08:00 - 16:00 6x
08:00 OH Takes over

      Statistics still look good from yesterday. Rate is still down.
ELOG V3.1.3-7933898