AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 6 of 35  ELOG logo
ID Date Author Subjectdown Text Attachments
  528   Tue Mar 5 09:10:01 2024 MA, JB, TDTuesday 5 March
Old ribbon cable assemblies - attachments
1  2
 20240305_101140.jpg20240305_101146.jpg20240305_165949.jpg 
  410   Tue Apr 5 08:52:16 2022 TDTuesday 5 AprilDSSSD bias OFF. DAQ STOPped

Attachment 1 FEE64 temps OK
 6x 
  1   Thu Sep 6 15:11:17 2018 OH, TDTuesday 4 September - Thursday 6 SeptemberAttachment 1 - FEE64 temperatures illustrating
(we assume) a faulty PSU temperature sensor
for aida07
 19x 
  291   Tue May 4 13:53:22 2021 OH, TDTuesday 4 May
NH has re-checked alignment of AIDA adaptor
PCBs cf. Elog:290
 7x 
  474   Tue May 31 09:05:00 2022 NH, TDTuesday 31 MayDSSD stack will be as follows

1      3208-7  1019       125           
  
  475   Tue May 31 17:09:35 2022 TDTuesday 31 May2x MSL type BB18(DS)-1000 installed

 20x 
  623   Tue Apr 30 09:06:45 2024 TD, NHTuesday 30 April
10.00 DSSSD bias & leakasge current - Grafana
- attachments 1-2
 7x 
  41   Tue Apr 2 07:39:44 2019 CB, TD, CATuesday 2nd April 201908:15 beam tuning in progress

08.30 System wide checks 
 36x 
  506   Mon Jun 27 23:11:47 2022 TDTuesday 28 June 00:00-08:0000:07 Zero stats & all histograms

ASIC settings 2021Apr29-13-16-00
 30x 
  284   Tue Apr 27 08:26:01 2021 TDTuesday 27 April - aida09 system console reports 'received undefined information code: 1' and 'code: 9'
09.25 All system wide checks OK *except*
 6x 
  347   Tue May 25 11:16:54 2021 TDTuesday 25 May12.16 DAQ continues file S496/R18_324
      alpha background
 7x 
  598   Tue Apr 23 15:11:50 2024 TDTuesday 23 April 16:00-00:00
16.12 Analysis of data file R17_101 - attachment
1
 20x 
  487   Tue Jun 21 10:19:05 2022 OH MLTuesday 21st June 08:00-00:0011:19 Stats ok 0xa on all FEE - attachment
1
      Current pulser settings - attachment
 12x 
  254   Tue Apr 20 19:00:00 2021 JSTuesday 20th 20:00-00:00 20:00  

Taking over from Liam, all systems good.
 12x 
  253   Tue Apr 20 14:56:38 2021 LPGTuesday 20th 16:00-20:0016:00

New shift, ready to go! Beam stopped just
 15x 
  325   Tue May 18 18:47:25 2021 LSTuesday 18th May 20:00 - 24:00
19.50
Stats okay (Fig 1)
 24x 
  324   Tue May 18 14:57:43 2021 CBTuesday 18th May 16:00 - 20:0015:58 Took shift over from OH and PP

Stats OK - attach 1
 11x 
  323   Tue May 18 06:50:53 2021 OH, PPTuesday 18th May 08:00 - 16:0008:00 OH Takes over

      Statistics still look good from yesterday.
 6x 
  322   Mon May 17 23:17:16 2021 DSJTuesday 18 May 0.00-8.00 shift0.00 - Taking over from Lewis 

00.30 - Rates look ok (fig1), Ran
R14_147 through analyser, dead times
 39x 
  463   Mon May 16 23:02:54 2022 AMTuesday 17th May 00:00-08:0001:00:     Attachments
1-3, System checks good

03:00:    
 12x 
ELOG V3.1.4-unknown