AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 8 of 36  ELOG logo
Entry  Wed Jun 1 08:00:18 2022, TD, 2xDSSSDs spectra layouts 

Spectra layouts for 2x DSSSDs can be found in directory ~/LayOut/2xDSSSDs
Entry  Sun Jun 19 00:22:24 2022, TD, Sunday 19 June 14x

01.20 
Entry  Tue Jun 21 23:29:16 2022, TD, Wednesday 22 June 00:00-08:00 33x

00.28 all histograms & stats zero'd
      baseline counters
Entry  Fri Jun 24 22:36:45 2022, TD, Saturday 25 June 00:00-08:00 31x

23:36 Check ASIC contorol
      Zero stats & all histograms
Entry  Sat Jun 25 22:48:57 2022, TD, Sunday 26 June 00:00-08:00 30x
23.43 Check ASIC control
      Zero stats & all histograms
Entry  Mon Jun 27 23:11:47 2022, TD, Tuesday 28 June 00:00-08:00 30x
00:07 Zero stats & all histograms

ASIC settings 2021Apr29-13-16-00
Entry  Tue Jul 5 08:53:20 2022, TD, To Do 

In no particular order
Entry  Sun Jul 16 09:32:57 2023, TD, Firefox browser proxy setting change 

Firefox browser proxy setting changed to 'Auto-detect proxy settings for this network' ( Firefox -> Edit -> Settings -> Network Settings -> Settings )
Entry  Sun Oct 1 11:47:07 2023, TD, S4 cooling water  1000007356.jpg1000007355.jpg

The photographs show the cooling water controls and temperature/pressure gauges outside S4 and the connections used by AIDA within S4.
Entry  Thu Oct 12 14:01:43 2023, TD, MSL type BB18 24cm x 8cm DSSSD test - update Screenshot_from_2023-10-12_15-13-30.pngScreenshot_from_2023-10-12_15-17-05.png

DSSSD MSL type BB18 24cm x 8cm 3208-3/3208-21/3208-22
Entry  Mon Nov 13 11:46:54 2023, TD, Summary of AIDA 24cm x 8cm 'triple' DSSSD tests Summary_of_AIDA_tests_2022-3_-_Dec_2023.pdfSummary_of_AIDA_tests_2022-3_-_Dec_2023.pptx
 
Entry  Wed Jan 31 15:27:07 2024, TD, Photos of water flow & dew point sensor interlock box 20240131_160205.jpg20240131_145249.jpg20240131_145340.jpg20240131_160341.jpg
Attachment 1 - 4 socket input connectors ( from sensor to interlock box )

Attachment 2 & 2 - 24V dc relays and internal wiring
Entry  Mon Feb 26 13:17:51 2024, TD, Offline analysis of DEC23/R9_6 9x

First pass analysis of data file /TapeData/DEC23/R9_6
Entry  Sun Mar 3 16:06:11 2024, TD, Sunday 3 March 24x

17.00 FEE64 41:a0:71 ASIC #2 u/s
      Replaced ASIC mezzanine with new ASIC mezzanine
Entry  Mon Mar 4 11:35:30 2024, TD, Monday 4 March 11x
12.30 FEE64 41:d7:cd ASIC mezzanine u/s, no data, ASIC temperature c. 20 deg C ( ambient ) low
      Replaced ASIC mezzanine with new ASIC mezzanine
      Installed as aida08
Entry  Fri Mar 22 08:29:55 2024, TD, Anydesk restarted remotely 
Anydesk restarted remotely per https://elog.ph.ed.ac.uk/CARME/489

Anydesk address now restored to 832827869
Entry  Fri Mar 22 08:31:39 2024, TD, Friday 22 March 39x

09.30 Systems check
Entry  Tue Mar 26 18:56:03 2024, TD, USB-controlled ac mains relay interlock box - wiring 

Sensor ( 4 pins )
    Reply  Thu Mar 28 09:18:53 2024, TD, Installing FEE64s of DSSSD2 
Some additional checks

- check 'top hat' electrical isolators are correctly installed at each of the 4x mounting points of the AIDA snout assembly 

- check snout is electrically isolated with respect to AIDA support assembly/stand, bPlas PCBs/cabling/ground/drain wires and BB7
Entry  Tue Apr 2 18:37:21 2024, TD, S505 ADC offsets  S505_calibration_data.txt

S505 ADC offsets using pulser walkthrough data from data file R1
ELOG V3.1.4-unknown