  718   Thu Jul 24 15:50:01 2025 CC, MP, NKCheck of BB7 impactHT of upstream AIDA from iseg, HT
cable shielded, 100V, 17 uA. HT
of downstream AIDA from CAEN, AIDA#0. Both
 Screenshot_from_2025-07-24_16-49-27.pngScreenshot_from_2025-07-24_17-03-44.pngScreenshot_from_2025-07-24_17-22-49.pngScreenshot_from_2025-07-24_17-29-38.png 
  717   Thu Jul 24 13:36:34 2025 CC, MP, NKAIDA05 connected and disconnected compared to AIDA09HT cable shielded, HT
of upstream AIDA from iseg, HT of downstream
AIDA from CAEN. Both channel 0 and 1 of CAEN
 10x 
  716   Thu Jul 24 10:28:04 2025 CC, NK, MPComparison of channels in the same FEE64 and ASIC 05.1 and with AIDA13.1.8LBB7 is still connected but not biased (same
configuration as the previous elog). The
channel of the CAEN power supply #0 is connected
 8x 
  715   Wed Jul 23 17:02:22 2025 CC, NKComparison of channels in the same FEE64 and ASIC 05.1 and with AIDA13.1.8LBB7 is still connected but not biased (same
configuration as the previous elog). The
channel of the CAEN power supply #0 is connected
 8x 
  714   Wed Jul 23 15:56:00 2025 CC, MP, NKTest of AIDA05 with new bias moduleAttachment1: AIDA05.1.8L when AIDA05 connected,
biased at 101 V with shielded cables. BB7
is still connected but not biased (same configuration
 Screenshot_from_2025-07-23_17-08-56.png 
  713   Wed Jul 23 15:04:26 2025 CC, MP, NKTest of AIDA05 with BB7 connected to Mesytec but not biasedAttachment1: AIDA05.1.8L when AIDA05 connected,
biased at 100 V with not-shielded cables,
after the DEGAS platform has been closed,
 Screenshot_from_2025-07-23_16-16-57.png 
  712   Wed Jul 23 13:59:37 2025 CC, NKShielding of the snoutAttachment1: AIDA05.1.8L when AIDA05 connected,
biased at 100 V with not-shielded cables,
CAEN HT,  after the base of the
 Screenshot_from_2025-07-23_15-07-42.png 
  711   Wed Jul 23 13:08:30 2025 CC, NKComparison of channels in the same FEE64 and ASIC 05.1Biased at 100, AIDA05 connected, HT cables
not shielded CAEN HT

Attachment 1: AIDA05.1.8L -->
 Screenshot_from_2025-07-23_14-11-36.pngScreenshot_from_2025-07-23_14-13-46.pngScreenshot_from_2025-07-23_14-16-03.pngScreenshot_from_2025-07-23_14-18-27.pngScreenshot_from_2025-07-23_14-20-42.png 
  710   Wed Jul 23 09:37:34 2025 CC, NKComparison pulser FWHM with/without HT and detector cablesThis elog is the first reliable.
Before, the histograms have not been zero'd

Each test are done and compared
 9x 
  709   Tue Jul 22 18:00:45 2025 CC, NK, MPFWHM aida FEEAIDA05 completely disconnected, all the
others FEEs64 are fully connected

Attachment 1: aida05, FWHM= 95
 Screenshot_from_2025-07-22_18-59-26.pngScreenshot_from_2025-07-22_18-59-45.png 
  708   Tue Jul 22 17:00:26 2025 MP, CCStatusTest with shielded HV cables for both detectors.

The FWHM for ch1 is now 184 ch.

Yesterday cables for cards 5, 6,
 Screenshot_from_2025-07-22_17-51-52.pngScreenshot_from_2025-07-22_17-59-20.png 
  707   Mon Jul 21 13:01:19 2025 MPStatusStatus before grounding checks  Screenshot_from_2025-07-21_14-00-23.pngScreenshot_from_2025-07-21_14-00-39.png 
  706   Sun Jun 15 10:53:08 2025 TDSunday 15 June 2025
11.45 DSSSD bias & leakage current - attachment
1
 41x 
  705   Sat Jun 14 11:20:45 2025 TDSaturday 14 June 2025
12.21 BNC PB-5 settings
      Amplitude 1.0V
 30x 
  704   Fri Jun 13 12:42:39 2025 CC, TDFriday 13 June 2025
13.42 ASIC settings 2025Jun12-13.53.04
      *all* FEE64s slow comparator 0x64
 10x 
  703   Thu Jun 12 13:15:25 2025 GB, CC, NK, MP, TDThursday 12 June 2025
EMC tests with NK (Orsay)
 Screenshot_from_2025-06-12_14-39-35.pngScreenshot_from_2025-06-12_14-33-26.png 
  702   Tue Apr 8 08:52:39 2025 TDAIDA grounding
AIDA DSSSDs and FEE64-DSSSD cabling are electrically
isolated (by design) from snout, mounting
 powerstax-ms1u_instructionmanua.pdf20250408_095624.jpg 
  701   Tue Mar 11 11:53:18 2025 TDMonday 10 March
18.30 AIDA powered up for brief test
 11x 
  700   Sat Feb 22 12:35:38 2025 TDOffline analysis data files R9_85-R9_199 (84Mo setting)
Start 00:43 22.2.25 https://elog.gsi.de/despec/G-24-00302/57
AIDA data file R9_85
 22x 
  699   Thu Feb 20 17:06:42 2025 JB, CC, TD,MPWR error for aida 13,14,15,16WR timestamp errors resolved after reseating
the HDMI cables to the MACB
  
  698   Wed Feb 12 10:46:01 2025 TDOffline analysis data files S181 R4_351-396 Analysis data files R4_351-396

 25x 
  697   Fri Jan 31 17:26:47 2025 CC, TD, MPFriday 31 January contd.
18.18 bPlas and BB7 installs complete 
      Restart AIDA DAQ, Merger, Tape Server
 16x 
  696   Fri Jan 31 13:48:29 2025 JBAIDA analysis from HI-DESPEC meeting 20.11.2024AIDA analysis and presentation by J. Bormans
for AIDA made in the HISPEC-DESPEC collaboration
meeting.
  
  695   Fri Jan 31 09:37:47 2025 CC, TD, MPFriday 31 JanuaryImplantation stack mounted - BB18(DS)-1000
+ bPlas + bPlas + 3x BB7(DS)-1000
 26x 
  694   Wed Jan 15 11:58:08 2025 TDOffline analysis data files S505 R3_9 - R3_128 (207Hg setting)
Aanlysis data files R3_9 - R3_128 (207Hg
setting)
 27x 
  693   Mon Jan 13 17:38:18 2025 TDOffline analysis of S505 data files
First timestamp of R2_105 0x16FAEC5E54AABF6C
 10x 
  692   Mon Jan 13 11:32:30 2025 TDOffline analysis S505 data file R3_150Offline analysis of S505 data files R3_150

first WR ts
 22x 
  691   Sat Jan 11 14:14:21 2025 TDaida06 crashed and rebooted 10.1.25aida06 crashed and rebooted sometime ( 14:48
- 23:25 ) yesterday. System console log appended.
  
  690   Sat Jan 11 14:05:03 2025 TDSaturday 11 January 2024
14.37 Detector bias & leakage current OK
- attachment 1
 17x 
  689   Fri Jan 10 10:03:43 2025 TDLEC fast comparator threshold too low> > > 
> > > LEC fast comparator has been set to
0x2 (200keV) which is *very* low and means
  
  688   Thu Jan 9 17:56:14 2025 TDLEC fast comparator threshold too low> > 
> > LEC fast comparator has been set to 0x2
(200keV) which is *very* low and means the
  
  687   Thu Jan 9 17:36:50 2025 TDLEC fast comparator threshold too low
> LEC fast comparator has been set to 0x2
(200keV) which is *very* low and means the
  
  686   Thu Jan 9 16:25:51 2025 TDLEC fast comparator threshold too low
LEC fast comparator has been set to 0x2 (200keV)
which is *very* low and means the fast comparator
 Screenshot_from_2025-01-09_17-28-45.png 
  685   Thu Jan 9 15:43:17 2025 JB, CC, MPTiming test platform moved in16:30 We moved the platform in. The system
was still biased and the DAQ was still running.

The system seems to be okay, temperatures
 Screenshot_from_2025-01-09_16-41-48.pngScreenshot_from_2025-01-09_16-42-06.pngScreenshot_from_2025-01-09_16-42-46.png 
  684   Thu Jan 9 12:46:43 2025 JB, MP, CCAIDA timing test 




 AIDAfasttime_bPlastWRdt_AIDA10.pngAIDACalAdcFasttime.pngAIDAfasttime_bPlastWRdt_AIDA10_nopulser.pngCentrepeak_gauss_fit.png 
  683   Wed Jan 8 16:47:05 2025 JB, MP, CCAIDA timing test 




 Screenshot_from_2025-01-08_17-51-51.png 
  682   Wed Jan 8 10:46:50 2025 TDReport - aida06 -boot fail due to network issue8:01:25/11:42:48|0x000000d00000-0x000000fe0000
: "user_kernel"
08:01:25/11:42:48|0x000000fe0000-0x000001000000
  
  681   Wed Jan 8 10:08:29 2025 JB, GB, SD, MP, CC, JGAIDA noise test with platform in positionYesterday we spent time essentially performing
a dry run to get AIDA DAQ and bPlast into
the time sorter, there were some issues with
 Screenshot_from_2025-01-09_09-32-08.pngScreenshot_from_2025-01-09_09-35-11.pngScreenshot_from_2025-01-09_09-32-20.pngScreenshot_from_2025-01-09_09-31-58.png 
  680   Mon Dec 30 15:43:42 2024 TD[How To] Restart AnyDesk
See also https://elog.ph.ed.ac.uk/CARME/489
  
  679   Mon Dec 23 10:54:46 2024 TDMonday 23 December 2024
11.54 re-established remote access via AnyDesk
- details to follow
  
  678   Tue Dec 17 12:45:36 2024 JB, MP, CCAIDA timing test 




 IMG_2536.jpeg20241217_141148.jpg20241217_141206.jpg 
  677   Mon Dec 16 13:07:04 2024 JB, MP, CCAIDA timing testhttps://elog.gsi.de/despec/Implantation+Stack/9?suppress=1
- Day 1 ELOG

Day2:
 16x 
  676   Sat Dec 14 11:52:42 2024 TDSaturday 14 December
11:00 Visual inspection FEE64 adaptor PCBs
& cabling
 27x 
  675   Wed Dec 11 14:46:21 2024 TD, JB, CC, MPMounting of AIDA, bPlast and BB7 for testSnout assembled for detector position and
timing test.

The planned test is to use a BGO
 20241211_161837.jpg20241211_161833.jpg20241211_161830.jpg20241211_161820.jpg 
  674   Mon Dec 9 12:28:01 2024 NH, CC, MPTest of BB7 on AIDA ElectronicsBB7 connected to aida07, sitting in a cardboard
box
  
  673   Thu Dec 5 11:18:46 2024 TDOffline analysis S100 data files R21_0-R21_99Offline analysis of S100 data files R21_0
- R21_99 (162Eu setting)
 23x 
  672   Wed Dec 4 09:57:24 2024 TDHISPEC DESPEC meeting presentation - November 2024 -0 Summary of AIDA performance 2024   Summary_of_AIDA_2024_distro.pdf 