ID Date Author Subject Text Attachments
  745   Wed Nov 19 10:28:24 2025 JEL, JBAnalysis of AIDA from S100 experiment by JELAnalysis done by JEL of the AIDA daq with
his own time-stitcher -- not the standard
one used by DESPEC.
 aidastop.pdf 
  744   Thu Nov 13 10:14:50 2025 JB, MPNoise conditions after removal of bPlast cablingJB has removed unnecessary cables and items
from the snout and platform:

- the bPlast cables and booster
 11x 
  743   Fri Nov 7 12:30:30 2025 JB, GB, MPPulser walkthrough for source tests. 13:30 We are going to do the pulser walkthrough
for the the source tests.
 Screenshot_from_2025-11-07_13-56-34.pngScreenshot_from_2025-11-07_13-45-30.pngScreenshot_from_2025-11-07_13-43-50.pngScreenshot_2025-11-07_192947.pngScreenshot_2025-11-07_193005.png 
  742   Fri Nov 7 10:47:29 2025 MP207Bi source test - data takingDAQ stopped at ~17.30 due to anydesk failure

  
  741   Thu Nov 6 12:58:09 2025 NH207Bi source test - data takingRestart AIDA

aida06 took three attempts to boot today
 6x 
  740   Wed Nov 5 13:23:38 2025 JB, MP207Bi source test - FWHM tests14:10 started up the DAQ. HV and TEMPS OK.

Peak threshold with 1V pulser measured at
 8x 
  739   Tue Nov 4 17:29:28 2025 MPBi207 source data, 700keVAnydesk has crashed. I am not able to set
it up again. I switch off bias and fees

  
  738   Tue Nov 4 16:34:47 2025 MP, NHBi207 source data, 700keVSome FEES were not acquiring data for some
reason we could not understand. We lowered
the thresholds to 200 keV, then rose them
  
  737   Tue Nov 4 14:57:19 2025 MPBi207 source data, 700keV- Bias and basic checks: the pulser FWHM
appears to be ~170, which is the same we
have obtained at the end of last week.
 Screenshot_from_2025-11-04_15-49-20.pngScreenshot_from_2025-11-04_15-33-11.pngScreenshot_from_2025-11-04_15-28-42.pngScreenshot_from_2025-11-04_15-28-35.png 
  736   Thu Oct 30 16:43:36 2025 MP, NHSetup and data taking with 207BiData taking and DAQ stopped now (17.40)




  
  735   Thu Oct 30 10:06:21 2025 MP, NHSetup and data taking with 207Bi- Initialised the Merger and Tape server

- loading of settings: EXPERIMENTS/AIDA/2025Oct29-16.11.06

- aida16 very noisy (attachments
 Screenshot_from_2025-10-30_11-07-55.pngScreenshot_from_2025-10-30_11-07-39.pngScreenshot_from_2025-10-30_11-07-29.pngScreenshot_from_2025-10-30_11-08-07.pngScreenshot_from_2025-10-30_11-10-06.png 
  734   Wed Oct 29 14:11:01 2025 JB, MP207Bi source test - data taking15:10 MP entered and check the water pressure
OK.
15:10 DSSSDs biased - OK.
 7x 
  733   Wed Oct 29 13:39:13 2025 TDAIDA FEE64 adaptor PCB to AIDA DSSSD cabling
The cables form the AIDA FEE64 adaptor PCB
to the MSL type BB18 DSSSDs are constructed
  
  732   Wed Oct 29 13:01:08 2025 NHUpdate of AnyDesk AnyDesk was updated to the latest version
that supports CentOS 7 (EOL OS)
  
  731   Wed Oct 29 12:56:29 2025 TDFurther setup for 207Bi testRemember that 'ADC calibration'
refers to the setup of the fast serial output
of the AD9222 Octal, 50MSPS, 14 bit ADC which
  
  730   Wed Oct 29 08:12:35 2025 MPFurther setup for 207Bi testInspection of side FEEs (2,6,4,8) and possible
grounding improvements:

- all screws and nuts for copper
 IMG_5959.jpegIMG_5958.jpegIMG_5957.jpegScreenshot_from_2025-10-29_09-23-32.pngScreenshot_from_2025-10-29_09-32-52.png 
  729   Tue Oct 28 12:43:38 2025 JB, GB, MP, AMFurther setup of tests for 207Bi test- Ch 2 and 3 of CAEN HV module changed to
negative polarity, Ch 0,1 still with positive
polarity
 14x 
  728   Mon Oct 27 18:08:11 2025 TDChanging ground setup from 2510202519.06 Found HV OFF, DAQ GOing

      DAQ STOP
  
  727   Mon Oct 27 11:55:00 2025 JB, MP, GB, NHChanging ground setup from 2510202512:55 We are going to try the follow changes
to the AIDA scheme of 241012025.
 9x 
  726   Sun Oct 26 16:22:38 2025 TD[How To] Check ASIC settings
tcsh
cd /MIDAS/DB/EXPERIMENTS/AIDA/<ASIC settings
  
  725   Fri Oct 24 14:33:37 2025 JB, GB, MP, AMSnout grounding, bias and test input layout as of 24.10.2025   AIDA_scheme_241020525(2).pdf 
  724   Fri Oct 24 12:29:02 2025 JB, GB, MP, AM, NH207Bi source threshold tests> > > 
> > > We have dismounted the AIDA stack and
bPlast and realigned the cables so that they
 11x 
  723   Fri Oct 24 10:31:59 2025 JB, GB, MP, AM, NH207Bi source threshold tests> > 
> > We have dismounted the AIDA stack and
bPlast and realigned the cables so that they
 6x 
  722   Thu Oct 23 18:45:12 2025 TDThursday 23 October 2025
19.45 Remote system check
 6x 
  721   Thu Oct 23 12:22:31 2025 JB, GB, MP, AM, NH207Bi source threshold tests
> We have dismounted the AIDA stack and bPlast
and realigned the cables so that they can
 8x 
  720   Wed Oct 15 09:41:24 2025 JB, GB, MP207Bi source threshold tests
We have dismounted the AIDA stack and bPlast
and realigned the cables so that they can
 IMG_5796.jpgIMG_5797.jpgIMG_5798.jpg 
  719   Mon Oct 13 15:04:53 2025 JPB, NH, GB, MPDismount AIDA and realign the cablesWe have dismounted the AIDA stack and bPlast
and realigned the cables so that they can
fit into the adaptors.
 IMG_5778.jpegIMG_5779.jpeg 
  718   Thu Jul 24 15:50:01 2025 CC, MP, NKCheck of BB7 impactHT of upstream AIDA from iseg, HT
cable shielded, 100V, 17 uA. HT
of downstream AIDA from CAEN, AIDA#0. Both
 Screenshot_from_2025-07-24_16-49-27.pngScreenshot_from_2025-07-24_17-03-44.pngScreenshot_from_2025-07-24_17-22-49.pngScreenshot_from_2025-07-24_17-29-38.png 
  717   Thu Jul 24 13:36:34 2025 CC, MP, NKAIDA05 connected and disconnected compared to AIDA09HT cable shielded, HT
of upstream AIDA from iseg, HT of downstream
AIDA from CAEN. Both channel 0 and 1 of CAEN
 10x 
  716   Thu Jul 24 10:28:04 2025 CC, NK, MPComparison of channels in the same FEE64 and ASIC 05.1 and with AIDA13.1.8LBB7 is still connected but not biased (same
configuration as the previous elog). The
channel of the CAEN power supply #0 is connected
 8x 
  715   Wed Jul 23 17:02:22 2025 CC, NKComparison of channels in the same FEE64 and ASIC 05.1 and with AIDA13.1.8LBB7 is still connected but not biased (same
configuration as the previous elog). The
channel of the CAEN power supply #0 is connected
 8x 
  714   Wed Jul 23 15:56:00 2025 CC, MP, NKTest of AIDA05 with new bias moduleAttachment1: AIDA05.1.8L when AIDA05 connected,
biased at 101 V with shielded cables. BB7
is still connected but not biased (same configuration
 Screenshot_from_2025-07-23_17-08-56.png 
  713   Wed Jul 23 15:04:26 2025 CC, MP, NKTest of AIDA05 with BB7 connected to Mesytec but not biasedAttachment1: AIDA05.1.8L when AIDA05 connected,
biased at 100 V with not-shielded cables,
after the DEGAS platform has been closed,
 Screenshot_from_2025-07-23_16-16-57.png 
  712   Wed Jul 23 13:59:37 2025 CC, NKShielding of the snoutAttachment1: AIDA05.1.8L when AIDA05 connected,
biased at 100 V with not-shielded cables,
CAEN HT,  after the base of the
 Screenshot_from_2025-07-23_15-07-42.png 
  711   Wed Jul 23 13:08:30 2025 CC, NKComparison of channels in the same FEE64 and ASIC 05.1Biased at 100, AIDA05 connected, HT cables
not shielded CAEN HT

Attachment 1: AIDA05.1.8L -->
 Screenshot_from_2025-07-23_14-11-36.pngScreenshot_from_2025-07-23_14-13-46.pngScreenshot_from_2025-07-23_14-16-03.pngScreenshot_from_2025-07-23_14-18-27.pngScreenshot_from_2025-07-23_14-20-42.png 
  710   Wed Jul 23 09:37:34 2025 CC, NKComparison pulser FWHM with/without HT and detector cablesThis elog is the first reliable.
Before, the histograms have not been zero'd

Each test are done and compared
 9x 
  709   Tue Jul 22 18:00:45 2025 CC, NK, MPFWHM aida FEEAIDA05 completely disconnected, all the
others FEEs64 are fully connected

Attachment 1: aida05, FWHM= 95
 Screenshot_from_2025-07-22_18-59-26.pngScreenshot_from_2025-07-22_18-59-45.png 
  708   Tue Jul 22 17:00:26 2025 MP, CCStatusTest with shielded HV cables for both detectors.

The FWHM for ch1 is now 184 ch.

Yesterday cables for cards 5, 6,
 Screenshot_from_2025-07-22_17-51-52.pngScreenshot_from_2025-07-22_17-59-20.png 
  707   Mon Jul 21 13:01:19 2025 MPStatusStatus before grounding checks  Screenshot_from_2025-07-21_14-00-23.pngScreenshot_from_2025-07-21_14-00-39.png 
  706   Sun Jun 15 10:53:08 2025 TDSunday 15 June 2025
11.45 DSSSD bias & leakage current - attachment
1
 41x 
  705   Sat Jun 14 11:20:45 2025 TDSaturday 14 June 2025
12.21 BNC PB-5 settings
      Amplitude 1.0V
 30x 
  704   Fri Jun 13 12:42:39 2025 CC, TDFriday 13 June 2025
13.42 ASIC settings 2025Jun12-13.53.04
      *all* FEE64s slow comparator 0x64
 10x 
  703   Thu Jun 12 13:15:25 2025 GB, CC, NK, MP, TDThursday 12 June 2025
EMC tests with NK (Orsay)
 Screenshot_from_2025-06-12_14-39-35.pngScreenshot_from_2025-06-12_14-33-26.png 
  702   Tue Apr 8 08:52:39 2025 TDAIDA grounding
AIDA DSSSDs and FEE64-DSSSD cabling are electrically
isolated (by design) from snout, mounting
 powerstax-ms1u_instructionmanua.pdf20250408_095624.jpg 