718
|
Thu Jul 24 15:50:01 2025 |
CC, MP, NK | Check of BB7 impact | HT of upstream AIDA from iseg, HT
cable shielded, 100V, 17 uA. HT
of downstream AIDA from CAEN, AIDA#0. Both |
   |
|
717
|
Thu Jul 24 13:36:34 2025 |
CC, MP, NK | AIDA05 connected and disconnected compared to AIDA09 | HT cable shielded, HT
of upstream AIDA from iseg, HT of downstream
AIDA from CAEN. Both channel 0 and 1 of CAEN |
10x |
|
716
|
Thu Jul 24 10:28:04 2025 |
CC, NK, MP | Comparison of channels in the same FEE64 and ASIC 05.1 and with AIDA13.1.8L | BB7 is still connected but not biased (same
configuration as the previous elog). The
channel of the CAEN power supply #0 is connected |
8x |
|
715
|
Wed Jul 23 17:02:22 2025 |
CC, NK | Comparison of channels in the same FEE64 and ASIC 05.1 and with AIDA13.1.8L | BB7 is still connected but not biased (same
configuration as the previous elog). The
channel of the CAEN power supply #0 is connected |
8x |
|
714
|
Wed Jul 23 15:56:00 2025 |
CC, MP, NK | Test of AIDA05 with new bias module | Attachment1: AIDA05.1.8L when AIDA05 connected,
biased at 101 V with shielded cables. BB7
is still connected but not biased (same configuration |
|
|
713
|
Wed Jul 23 15:04:26 2025 |
CC, MP, NK | Test of AIDA05 with BB7 connected to Mesytec but not biased | Attachment1: AIDA05.1.8L when AIDA05 connected,
biased at 100 V with not-shielded cables,
after the DEGAS platform has been closed, |
|
|
712
|
Wed Jul 23 13:59:37 2025 |
CC, NK | Shielding of the snout | Attachment1: AIDA05.1.8L when AIDA05 connected,
biased at 100 V with not-shielded cables,
CAEN HT, after the base of the |
|
|
711
|
Wed Jul 23 13:08:30 2025 |
CC, NK | Comparison of channels in the same FEE64 and ASIC 05.1 | Biased at 100, AIDA05 connected, HT cables
not shielded CAEN HT
Attachment 1: AIDA05.1.8L --> |
    |
|
710
|
Wed Jul 23 09:37:34 2025 |
CC, NK | Comparison pulser FWHM with/without HT and detector cables | This elog is the first reliable.
Before, the histograms have not been zero'd
Each test are done and compared |
9x |
|
709
|
Tue Jul 22 18:00:45 2025 |
CC, NK, MP | FWHM aida FEE | AIDA05 completely disconnected, all the
others FEEs64 are fully connected
Attachment 1: aida05, FWHM= 95 |
 |
|
708
|
Tue Jul 22 17:00:26 2025 |
MP, CC | Status | Test with shielded HV cables for both detectors.
The FWHM for ch1 is now 184 ch.
Yesterday cables for cards 5, 6, |
 |
|
707
|
Mon Jul 21 13:01:19 2025 |
MP | Status | Status before grounding checks |
 |
|
706
|
Sun Jun 15 10:53:08 2025 |
TD | Sunday 15 June 2025 |
11.45 DSSSD bias & leakage current - attachment
1
|
41x |
|
705
|
Sat Jun 14 11:20:45 2025 |
TD | Saturday 14 June 2025 |
12.21 BNC PB-5 settings
Amplitude 1.0V
|
30x |
|
704
|
Fri Jun 13 12:42:39 2025 |
CC, TD | Friday 13 June 2025 |
13.42 ASIC settings 2025Jun12-13.53.04
*all* FEE64s slow comparator 0x64
|
10x |
|
703
|
Thu Jun 12 13:15:25 2025 |
GB, CC, NK, MP, TD | Thursday 12 June 2025 |
EMC tests with NK (Orsay)
|
 |
|
702
|
Tue Apr 8 08:52:39 2025 |
TD | AIDA grounding |
AIDA DSSSDs and FEE64-DSSSD cabling are electrically
isolated (by design) from snout, mounting |
 |
|
701
|
Tue Mar 11 11:53:18 2025 |
TD | Monday 10 March |
18.30 AIDA powered up for brief test
|
11x |
|
700
|
Sat Feb 22 12:35:38 2025 |
TD | Offline analysis data files R9_85-R9_199 (84Mo setting) |
Start 00:43 22.2.25 https://elog.gsi.de/despec/G-24-00302/57
AIDA data file R9_85
|
22x |
|
699
|
Thu Feb 20 17:06:42 2025 |
JB, CC, TD,MP | WR error for aida 13,14,15,16 | WR timestamp errors resolved after reseating
the HDMI cables to the MACB |
|
|
698
|
Wed Feb 12 10:46:01 2025 |
TD | Offline analysis data files S181 R4_351-396 | Analysis data files R4_351-396
|
25x |
|
697
|
Fri Jan 31 17:26:47 2025 |
CC, TD, MP | Friday 31 January contd. |
18.18 bPlas and BB7 installs complete
Restart AIDA DAQ, Merger, Tape Server |
16x |
|
696
|
Fri Jan 31 13:48:29 2025 |
JB | AIDA analysis from HI-DESPEC meeting 20.11.2024 | AIDA analysis and presentation by J. Bormans
for AIDA made in the HISPEC-DESPEC collaboration
meeting. |
|
|
695
|
Fri Jan 31 09:37:47 2025 |
CC, TD, MP | Friday 31 January | Implantation stack mounted - BB18(DS)-1000
+ bPlas + bPlas + 3x BB7(DS)-1000
|
26x |
|
694
|
Wed Jan 15 11:58:08 2025 |
TD | Offline analysis data files S505 R3_9 - R3_128 (207Hg setting) |
Aanlysis data files R3_9 - R3_128 (207Hg
setting)
|
27x |
|
693
|
Mon Jan 13 17:38:18 2025 |
TD | Offline analysis of S505 data files |
First timestamp of R2_105 0x16FAEC5E54AABF6C
|
10x |
|
692
|
Mon Jan 13 11:32:30 2025 |
TD | Offline analysis S505 data file R3_150 | Offline analysis of S505 data files R3_150
first WR ts
|
22x |
|
691
|
Sat Jan 11 14:14:21 2025 |
TD | aida06 crashed and rebooted 10.1.25 | aida06 crashed and rebooted sometime ( 14:48
- 23:25 ) yesterday. System console log appended.
|
|
|
690
|
Sat Jan 11 14:05:03 2025 |
TD | Saturday 11 January 2024 |
14.37 Detector bias & leakage current OK
- attachment 1
|
17x |
|
689
|
Fri Jan 10 10:03:43 2025 |
TD | LEC fast comparator threshold too low | > > >
> > > LEC fast comparator has been set to
0x2 (200keV) which is *very* low and means |
|
|
688
|
Thu Jan 9 17:56:14 2025 |
TD | LEC fast comparator threshold too low | > >
> > LEC fast comparator has been set to 0x2
(200keV) which is *very* low and means the |
|
|
687
|
Thu Jan 9 17:36:50 2025 |
TD | LEC fast comparator threshold too low | >
> LEC fast comparator has been set to 0x2
(200keV) which is *very* low and means the |
|
|
686
|
Thu Jan 9 16:25:51 2025 |
TD | LEC fast comparator threshold too low |
LEC fast comparator has been set to 0x2 (200keV)
which is *very* low and means the fast comparator |
|
|
685
|
Thu Jan 9 15:43:17 2025 |
JB, CC, MP | Timing test platform moved in | 16:30 We moved the platform in. The system
was still biased and the DAQ was still running.
The system seems to be okay, temperatures |
  |
|
684
|
Thu Jan 9 12:46:43 2025 |
JB, MP, CC | AIDA timing test |
|
   |
|
683
|
Wed Jan 8 16:47:05 2025 |
JB, MP, CC | AIDA timing test |
|
|
|
682
|
Wed Jan 8 10:46:50 2025 |
TD | Report - aida06 -boot fail due to network issue | 8:01:25/11:42:48|0x000000d00000-0x000000fe0000
: "user_kernel"
08:01:25/11:42:48|0x000000fe0000-0x000001000000 |
|
|
681
|
Wed Jan 8 10:08:29 2025 |
JB, GB, SD, MP, CC, JG | AIDA noise test with platform in position | Yesterday we spent time essentially performing
a dry run to get AIDA DAQ and bPlast into
the time sorter, there were some issues with |
   |
|
680
|
Mon Dec 30 15:43:42 2024 |
TD | [How To] Restart AnyDesk |
See also https://elog.ph.ed.ac.uk/CARME/489
|
|
|
679
|
Mon Dec 23 10:54:46 2024 |
TD | Monday 23 December 2024 |
11.54 re-established remote access via AnyDesk
- details to follow
|
|
|
678
|
Tue Dec 17 12:45:36 2024 |
JB, MP, CC | AIDA timing test |
|
  |
|
677
|
Mon Dec 16 13:07:04 2024 |
JB, MP, CC | AIDA timing test | https://elog.gsi.de/despec/Implantation+Stack/9?suppress=1
- Day 1 ELOG
Day2: |
16x |
|
676
|
Sat Dec 14 11:52:42 2024 |
TD | Saturday 14 December |
11:00 Visual inspection FEE64 adaptor PCBs
& cabling
|
27x |
|
675
|
Wed Dec 11 14:46:21 2024 |
TD, JB, CC, MP | Mounting of AIDA, bPlast and BB7 for test | Snout assembled for detector position and
timing test.
The planned test is to use a BGO |
   |
|
674
|
Mon Dec 9 12:28:01 2024 |
NH, CC, MP | Test of BB7 on AIDA Electronics | BB7 connected to aida07, sitting in a cardboard
box
|
|
|
673
|
Thu Dec 5 11:18:46 2024 |
TD | Offline analysis S100 data files R21_0-R21_99 | Offline analysis of S100 data files R21_0
- R21_99 (162Eu setting)
|
23x |
|
672
|
Wed Dec 4 09:57:24 2024 |
TD | HISPEC DESPEC meeting presentation - November 2024 -0 Summary of AIDA performance 2024 | |
|